Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

Files6

Search terms highlighted
Eversource rate increase is on 10 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
  1. Page 77 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-052 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Each year for the past five years, provide the average makeready work interval (from application to close-out) separately for solely-owned poles and jointlyowned poles. Response: The table below provides the average number of days between receipt of a completed application (including payment of applicable application fees) and issuance of the license for power only solely owned poles and jointly owned poles. The Company notes that these intervals represent the total elapsed time between receipt of a completed application and issuance of a license, not solely the duration of make ready construction activities. As a result, the reported intervals encompass multiple stages of the pole attachment process, including application review, survey and engineering activities, telecommunication survey and engineering for jointly owned poles, coordination and concurrence among pole owners, make ready billing, receipt of make ready payment by Eversource, Frontier, or both as applicable, make ready construction, and final licensing. Accordingly, the reported intervals are influenced by numerous factors, many of which are outside of Eversource’s control and vary significantly by project.
  2. Page 78 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-052 Page 2 of 2 These factors include, but are not limited to: • Delays in payment by requesting attachers or other parties • Delays associated with third party attachers completing required transfer or make ready work • Coordination requirements among multiple entities on jointly owned pole lines • Delays in obtaining permits, municipal approvals or traffic control requirements • Customer driven schedule changes or project modifications • Contractor availability and scheduling constraints • Weather events, emergency restoration activities, and other unforeseen field conditions • Delays associated with obtaining access to private property or rights-of-way • Disputes regarding responsibility for make ready work or associated costs Because these and other factors can materially affect the time between application and licensing, without reflecting Eversource’s own performance, any calculated average would be skewed and potentially misleading.
  3. Page 79 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-053 Page 1 of 1 Date Filed: September 23, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Timothy J. Griffin Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Reference Exhibit CLP REVREQ-2, Schedule B 6.2 (Deferred Assets), please discuss how the Accumulated Deferred Income Taxes for each deferred asset on lines 29 – 39 were determined, and show the calculation for deferred third party make ready pole work as an example. Response: Accumulated Deferred Income Taxes for each deferred asset on lines 29 – 39 of Exhibit CLP REVREQ-2, Schedule B-6.2 were determined by applying the statutory tax rate in effect during the rate year, or 27.5175%, to the 12/31/2025 balance. Using the deferred pole make ready 12/31/2025 balance of $16,581,000 as an example, the calculation is as follows: $16,581,000 multiplied by (1 - 27.5175%, or 72.4825%) tax rate to come to the after-tax amount of $12,018,000 as seen on line 44 of Schedule B-6.2.
  4. Page 80 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-054 Page 1 of 4 Date Filed: September 23, 2026 Witness: David L. Gladey, Jeffrey Richard, Brendan J. O’Brien, Timothy J. Griffin and Garrett J. Murray Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Reference Exhibit CLP REVREQ-4 (Third Party Pole Make Ready Costs). Provide the following: a. Line 7552, Notes, indicates that Eversource began maintaining detailed records of both billable and non-billable make costs consistent with Order No. 15 in the Final Decision in 19-01-52 RE01. Please confirm that the figure of $16,580,868 includes only non-billable costs. b. Discuss whether (i) the non-compliance issues that led to the costs incurred by the company as shown in this exhibit were discovered by the company as a result of a new attacher requesting to attach, (ii) for each pole in the exhibit, the company has a record of when the last attacher attached to the pole and when the pole was last inspected. c. Confirm that the headings for columns F through Y are the FERC accounts to which the third party pole make ready costs were assigned; d. Provide a description of the subaccounts for Accounts 593 and 594. e. Discuss why all the costs are in O&M accounts and there are no costs in capital accounts at page 41 of Exhibit CLP REVREQ-1. f. For entries indicating “Pole replacement – Pole defective”, explain why if the pole is already defective, it would not be the company’s or the joint pole owner’s responsibility to replace the pole. g. With reference to line 7030 which explains that Frontier will set a new 40-foot class 2 pole and remove the 35-foot class 4 pole, explain *D&D*Conv and discuss how the capital costs associated with the pole replacement were treated in the FERC Form 1. h. Provide an allocation of the amount of $16,580,868 into calendars years, meaning the portion allocable to each year starting with 2017 and ending with 2025 and indicate where the allocations appear in the FERC Form 1 for those years. i. Explain line 7548, the removal of 2023-2025 Amounts in Distribution Rates of $2,408,607. Explain how that amount was added to distribution rates since the last rate case in Docket 17-10-46.
  5. Page 81 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-054 Page 2 of 4 Response: a. Confirmed. The amount of $16,580,868 shown on line 7552 includes only non-billable third party make ready costs. As noted in Exhibit CLP-REVREQ-4, Eversource began maintaining detailed records of both billable and non-billable make ready costs consistent with the Docket 10-01-52RE01 Decision. The amount reflected in this exhibit represents costs that were classified as non-billable and therefore were not invoiced to attaching entities. b. (i) The non-compliance conditions reflected in Exhibit CLP-REVREQ-4 were identified during the engineering phase associated with attachment requests. (ii) Eversource maintains records related to pole inspections and attachment activity. The availability of records identifying the most recent attachment date and inspection date varies based on the specific pole and historical record availability. c. Yes, columns F through Y are the FERC accounts to which the third party pole make ready costs were assigned. d. Below is a description of the subaccounts for FERC 593 and 594. 593000 – Distribution Maintenance of Overhead Lines 593010 – Poles and Fixtures 593020 – Overhead Construction Transfer 593040 – Overhead Corrective Maintenance Repairs 593050 – Overhead Service Maintenance Repairs 593100 – Tree Trimming Vegetation Control 594000 – Distribution Maintenance of Underground Lines 594010 – Underground Conduit Maintenance 594020 – Manhole Regulating 594030 – Underground Corrective and Emergent Maintenance 594260 – Maintenance of Manholes e. In Docket No. 19-01-52RE01, PURA directed the Company to defer incremental nonbillable make-ready costs (see Docket No. 19-01-52RE01 Final Decision dated May 11, 2022 at page 45). Consistent with this directive, the Company deferred incremental nonbillable O&M make-ready costs to a regulatory asset which is being sought for recovery in this rate amendment application as supported by Exhibit CLP-REVREQ-4. The capital costs for non-billable third party market ready pole work is included for recovery in the Company’s rate amendment application consistent with all other in-service capital and is supported in Exhibit CLP-ADDITIONS-9.
  6. Page 82 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-054 Page 3 of 4 f. For entries indicating “Pole replacement – Pole defective”, if the pole was found during survey to already be defective, it would be the Company’s or the joint pole owner’s responsibility to replace the pole. g. With reference to Exhibit CLP REVREQ-4 (Third Party Make Ready Costs), line 7030, “D&D Conv” is part of the Field Work Order description. The entire Field Work Order description for this line is “*D&D*Conv. 1635692 - Make Ready Non” which is used internally to communicate the contractor assigned to the work order, the Alden One conversation number, the type of work and billing classification. Therefore, “D&D” refers to D&D Contractors, “Conv. 1635692” is the Alden One conversation number, “Make Ready Non” indicates this is for make ready work and is ‘non’ billable. The capital costs associated with the additions and retirements related to the pole replacement were included on lines 64, 65 and 67 of pages 204-207 in the Company’s 2025 Ferc Form 1 filing. h. The table below shows the $16,580,868 by year. The amounts are included in the FERC Form 1 under Electric Operation and Maintenance Expenses under their respective FERC account number (583, 584, 587, 590, 593, 594, 595, 596, and 598) by year.
  7. Page 83 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-054 Page 4 of 4 i. Refer to the Company’s response to NECTA-048 i for the 2023-2025 amounts in distribution rates. Prior Referenced Response: i NECTA-048 Question: (Make Ready Work & Related Costs) Reference Exhibit CLP-REVREQ-1, pp. 44-46. Reconcile the statement that “the Company has not included any pole make-ready costs within base distribution rates in this proceeding…” (p. 46) with PURA’s statement in Docket No. 19-01-52RE01 that “EDCs received some level of recovery in base distribution rates to perform non-billable make-ready work…” A complete response will explain the steps taken by the Company to ensure that there is no double-recovery of non-billable make-ready costs in base rates versus in the deferred regulatory asset for non-billable make-ready costs. NECTA-048 Response: As noted in Exhibit CLP-REVREQ-1 at 44, lines 12 through 15, the Company states “The costs recorded to this deferred asset are associated with the costs of performing non-billable make-ready pole work not recovered in base distribution rates [emphasis added] to meet established standards, as approved in Docket No. 19-01-52RE01…” Further, in Late File Exhibit-01 in Docket No. 19-01-52RE01, the Company notes there is $803 thousand recovered in base distribution rates, annually, that are netted against cumulative non-billable make-ready costs. Therefore, providing assurance that the Company is not double-recovering non-billable make-ready costs in base distribution rates. Refer to Exhibit CLP-REVREQ-4 (Make Ready Pole Work), line 7548 in tab “Non-Billable Reason” for the Removal of 2023-2025 Amounts in Distribution Rates totaling $2.4 million.
  8. Page 84 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-055 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-9. Define the following acronyms: (a) ASP, (b) AWC, (c) BC, (d) Conv, (e) D&D, (f) DSL, (g) DR, (h) HAWK, (i) JS, (j) KA, (l) OA, (m) SH, (n) TPA, (o) TW, (p) ZA, (q) 3PA. Response: Please refer to the listing below for the requested definitions of the acronyms noted in the request; (a) ASP = Asplundh (b) AWC = Area Work Center (c) BC = Internal Employee Initials (d) Conv = Conversation (e) D&D = D&D Power (f) DSL = Internal Employee Initials (g) DR = Internal Employee Initials (h) HAWK = Hawkeye (Elecnor Hawkeye) (i) JS = Internal Employee Initials (j) KA = Internal Employee Initials (k) Missing (l) OA = Internal Employee Initials (m) SH = Internal Employee Initials
  9. Page 85 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-055 Page 2 of 2 (n) TPA = Third Party Attacher/Third Party Attachment (o) TW = Internal Employee Initials (p) ZA = Internal Employee Initials (q) 3PA = Third Party Attacher/Third Party Attachment
  10. Page 86 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-056 Page 1 of 1 Date Filed: September 23, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Leanne M. Landry and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-9. The phrase “Pole replacement -Pole defective” appears 106 times in this file. Provide the following: a. Explain why in each of these cases the expenses related to pole replacement become a deferred regulatory expense, b. Identify the account(s) to which the expenses are booked c. Identify the proposed method of recovery for such costs. d. Compare and contrast recovery of those costs with the recovery of costs associated with new pole placements needed to address expanded service coverage due to industrial, commercial and residential developments. Response: a. Capital expenditures related to pole replacements can be billable to the attachers or nonbillable. When costs are not billable, and the costs are capitalizable (as is the case for a pole replacement and other make-ready work where the replaced property is a depreciable unit of property), those are treated as Company property and would become a capital asset/rate base. Non billable replacements are not deferred regulatory expenses but instead capital assets residing in FERC Account 106 (Completed Construction Not Classified) or FERC Account 101 (Electric Plant in Service (Major Only)). b. Pole replacements are capital expenditures. Therefore, these are capital expenditures initially recorded as construction in FERC Account 107 (Construction work in progress— Electric) and moved to FERC Account 106 (Completed construction not classified— Electric (Major only)) once placed in service and FERC Account 101 once unitized. c. Capital expenditures for assets placed in service, not reimbursed through make-ready billing submitted to attachers, are part of this rate case. d. The recovery is the same as there are capital expenditures incurred for make-ready work that is not billable and would, in the ordinary course of business, be part of the company’s pole replacement process.
8 pages match

Text of OCC Set 17_COMBINED.pdf

Extracted from the file · 45 pages · 69,741 characters

Text of OCC Set 18_COMBINED.pdf

Extracted from the file · 24 pages · 49,328 characters

As listed on the current system

Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

This filing on the current system (opens in a new tab)