Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Page 11 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-594 Page 1 of 4 Date Filed: September 28, 2026 Witness: Lavelle A. Freeman and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 49. For each proposed substation or feeder capacity project, provide the following information: a. Traditional upgrade scope and total cost, including labor, materials, overheads, contingency, etc. b. Study year and forecast year(s). c. Traditional project’s planned in-service date. d. Earliest feasible NWA deployment year and the final year of the analysis period. e. Substation, feeder and geographic location of the constraint and potential NWA. f. For each forecast year, provide: i. Maximum capacity exceedance in MW; ii. Energy above the applicable equipment rating in MWh; iii. Annual increase in the exceedance in MW and MWh; iv. Maximum continuous duration of the exceedance in hours; v. Number of exceedance events and peak days; vi. Whether peak days are consecutive; and vii. Applicable normal or contingency equipment rating. g. Identify the NWA technologies and resource mix evaluated, including the assumed percentage or capacity of battery storage, solar PV, demand response, energy efficiency and other resources. Provide the information in native, machine-readable format, together with the hourly load forecast and applicable equipment rating used to calculate each annual MW, MWh and duration value. Response: Substation Capacity Projects: a. CLP-TSP-1 at 49 refers to the capital projects in Company’s Sustained Plan that are identified and will be developed to meet system needs and objectives. The specific projects related to peal load and capacity needs are listed in CLP-TSP-3 at 94-95. Presently, these projects are all at the conceptual stage and therefore are not yet at the stage where detailed engineering studies and evaluation of solutions and alternatives have been completed. Engineering scopes, cost estimates, and materials will be defined as the projects arePage 12 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-594 Page 2 of 4 developed through the Eversource Capital Project Approval Process and receive project funding. b. Please refer to OCC-591, Attachment 1. The excel worksheet contains a separate workbook with each substation forecast for the sustained performance plan. c. The substation capacity projects identified in OCC-591, Attachment 1, do not currently have planned in-service dates as these projects are still in the conceptual stage and do not have approved scopes of work. d. The forecast evaluation years are noted in column headers in OCC-591, Attachment 1 (2026-2035). As noted above, these projects are in the very early stage of development. As the Company evaluates and develops solutions and alternatives to meet the identified need, NWA solutions will be considered in accordance with the Company’s distribution planning process in the DSPG (see CLF-SC-023, Attachment 1). A variety of solution alternatives will be developed to resolve the constraint including, but not limited to, increasing equipment ratings (e.g., using cooling techniques), transferring load, upgrading equipment, and applying non-wires solutions. e. CLP-TSP-3 at 21-23 shows geographic location of constrained areas within the system. Substation capacity constraints that comprise the identified need are within the area served by the substation and are based on violation of substation equipment Emergency Thermal Limits during the loss of a single element within the substation fence. A typical example is the loss of the largest transformer for each voltage class within a substation. f. Please refer to OCC-591, Attachment 1. • For Part (i): Refer to “MVA Remaining”, column (K) • For Part (ii): Because these projects are still at the conceptual stage, this analysis has not yet been completed. However, it will be completed as part of the NWA solution development. • For Part (iii): Because these projects are still at the conceptual stage, this analysis has not yet been completed. However, it will be completed as part of the NWA solution development. • For Part (iv): Because these projects are still at the conceptual stage, this analysis has not yet been completed. However, it will be completed as part of the NWA solution development.Page 13 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-594 Page 3 of 4 • For Part (v): Because these projects are still at the conceptual stage, this analysis has not yet been completed. However, it will be completed as part of the NWA solution development. • For Part (vi): The Company’s forecast is based on a 3-day weighted average temperature humidity index. • For Part (vii): Refer to “LCC”, column (I) and “Firm”, column (L) for substation emergency rating, which is the trigger for the capacity projects in the Sustained Performance Plan. g. The substation capacity projects identified in OCC-591 Attachment 1, do not currently have NWA solutions identified as these projects are still in early development stages. The projects will all undergo a full NW screening to determine the suitability of an NWA as a potential solution, and viable NWA solutions will be reviewed and analyzed. Feeder Capacity Projects: a. Please refer to OCC-594, Attachment 2 CONFIDENTIAL, Feeder Capacity Projects for traditional upgrade scope and total cost, including labor, materials, overheads, contingency, etc. b. Please refer to OCC-594, Attachment 2 CONFIDENTIAL, for Feeder Capacity Projects for the study year. Distribution capacity projects are based on actual metered data and have been designed in accordance with the Distribution System Planning Guide to provide safe reliable power. Forecasting is not performed at the distribution line level as these capacity projects can be executed in a short timeframe when compared to substation capacity projects. c. Please refer to OCC-594, Attachment 2 CONFIDENTIAL, for Feeder Capacity Projects for the Traditional project’s planned in-service date. d. Line projects within the 2027–2031 plan have been designed in accordance with the Distribution System Planning Guide to provide safe reliable power. Projects approved after January 2025 have undergone the newly established NWA process laid out by PURA and have been reviewed by the process monitor and PURA, both concluding no further investigation is required. Please refer to the Non-Wires Solutions Process Cycle 1, Docket 25-08-08, Final Decision. 1 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/4b2aa80a45d5fe8185258d5c0051 dfbf/$FILE/250808-121025.pdf 1Page 14 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-594 Page 4 of 4 e. Please refer to OCC-594, Attachment 2 CONFIDENTIAL, for Feeder Capacity Projects for the substation, feeder and geographic location of the constraint. f. Forecasting is not performed at the distribution line level as these capacity projects can be executed in a short timeframe when compared to substation capacity projects. Please refer to OCC-594, Attachment 2 CONFIDENTIAL, for Feeder Capacity Projects for the following based on actual metered data: i. Maximum capacity exceedance in MW; vii. Applicable normal or contingency equipment rating The following data is not currently available: ii. Energy above the applicable equipment rating in MWh; iii. Annual increase in the exceedance in MW and MWh; iv. Maximum continuous duration of the exceedance in hours; v. Number of exceedance events and peak days; vi. Whether peak days are consecutive; and g. Capacity NWA alternatives were evaluated with battery storage.Page 15 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-595 Page 1 of 1 Date Filed: September 23, 2026 Witness: John P. DiPaola-Tromba Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 55. Confirm whether the proposed bulk transformer replacements are proactive replacements rather than replacements of failed transformers. If not confirmed, identify each replacement that is required because of an existing failure, capacity constraint, or mandatory compliance requirement. Response: Exhibit CLP-TSP-1 beginning at page 55, discusses the Targeted System Plan including an average of eight bulk and distribution transformers with an investment of ~$78M per year. These transformers are discussed below. The transformers included in the plan within this investment category are proactive replacements of units over 50 years old with asset health concerns. With a large portion of the transformer fleet being between 50 and 80 years old, as these transformers continue to approach and exceed 70 years, the rate of failure will increase rapidly. Due to the complexity and time duration of procuring and replacing transformers, a significant increase in failures would result in the inability to maintain reliability by reactively replacing an increased volume of transformer failures. The Stevenson 14A Transformer Replacement project is an ongoing project included in the Targeted System Plan related to the failure of the 14A-1X transformer at the Stevenson 14A substation. There are no other projects included in the Targeted System Plan that are a replacement of a failed transformer. The transformer projects identified for replacement because of an existing capacity constraint are included in the Substation Capacity/System Planning investment category.Page 16 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-596 Page 1 of 3 Date Filed: September 23, 2026 Witness: John P. DiPaola-Tromba Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 55, “…plan to maintain a transformer fleet that does not exceed 70 years of age.” Identify every law, regulation, manufacturer requirement, or mandatory engineering standard that requires a substation transformer to be retired at 40 years, 70 years, or any other specified age. If no such requirement exists, please confirm. a. Provide all existing studies, analyses, and historical data relied upon by the Company to conclude that transformer failure risk increases rapidly as transformers approach or exceed 70 years of age. If the Company has not performed an empirical analysis using its transformer-failure experience, please justify. b. Provide the Company data and analyses used to establish the transformer age thresholds or replacement criteria in the TSP, including the stated 40-year useful life and increased failure risk near 70 years. Include the age and cause of failure for each Company transformer that failed during the period covered by the analysis. If the criteria are not based on the Company’s actual failure experience, identify the source on which they are based. Response: There are no laws, regulations, manufacturer requirements, or mandatory engineering standards that require substation transformers to be retired at a specific age. The age of a power transformer is one of the most important factors in assessing asset condition. Although actual service life varies widely depending on the manufacturer’s design, quality of assembly, materials used, operating history, current operating conditions, and maintenance history, the average expected life for an individual transformer is approximately 40 years according to industry consortiums, and manufacturers. International reliability surveys (i.e., CIGRE) report major failure rates on the order of ~0.3% per transformer-year across large populations, with failure behavior influenced by aging and asset condition. Industry asset-management guidance supports risk-based decisionmaking that balances failure risk and cost. Eversource employs several methods to both actively and passively monitor the health of distribution power transformers within its service area. Active and continuous monitoring methods include out of specification alarming. Alarms may include indications for bushing monitoring (if applicable), LTC trouble, dissolved gas (if applicable), oil level alarms, and oil temperature alarms, among others.Page 17 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-596 Page 2 of 3 This information along with periodic maintenance and testing reports provide data into Eversource’s condition‑based asset management methodology that draws on multiple sources including: • • • • • Transformer nameplate characteristics Oil quality and DGA trends Abnormal thermal, electrical, or core indicators derived from PTX health modeling Maintenance and inspection records Power Factor Testing Eversource utilizes a detailed asset health score generated through the Electric Power Research Institute (EPRI) PTX tool to assess power transformer asset health. OCC-596, Attachment 4 CONFIDENTIAL, is a technical guide to the EPRI Power Transformer Expert System (PTX). The PTX tool evaluates normal degradation, abnormal operating conditions, oil quality, and age to produce two critical indicators: the Long-Term Health Index (LTI) and the Short-Term Health Index (STI). The PTX health index is measured in the range of 0 to 1, with 0 meaning healthy and 1 needing immediate replacement. A value greater than 0.5 is considered poor health, such that if repair/replacement is not performed the transformer will continue to decline leading to equipment failure. Eversource has 27 transformers in CT, or about 8.6% of the fleet, that fall within the range considered to be in poor condition. This means that without repair or replacement, their condition is expected to continue declining, increasing the risk of equipment failure. As a result, Eversource continues to prioritize and initiate replacement projects for these transformers. Attachments included note that multiple industry sources discuss aging and failure rates of substation power transformers. • OCC-596, Attachment 1 CONFIDENTIAL, A2 Cigre Brochure 939 AC Transformer Reliability • OCC-596, Attachment 2 CONFIDENTIAL, 1013566 Plant Support Engineering Large Transformer End of Expected Life Considerations and the Need for Planning • OCC-596, Attachment 3, EXEC-2022-001242 - Large Power Transformer Resilience Report 7-10-24 • OCC-596, Attachment 4 CONFIDENTIAL, 3002026877_Power Transformer Expert System (PTX) Software Application Guide_ Introduction to PTX, Overview, Technical Basis and Application InformationPage 18 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-596 Page 3 of 3 Based on industry experience, while transformers can operate beyond their typical design life of 40 years, the risk of failure exponentially increases after 70 years of service life, due to paper insulation degradation. OCC-596, Attachment 1 CONFIDENTIAL, a CIGRE study from 2024, shows the failure rate of transformers has a noticeable increase starting at 40 years and exponentially increases as the asset exceeds 65 years old. This study reviewed analysis of thousands of transformers including many voltage classes from around the world to build depth into the data available. OCC-596, Attachment 2 CONFIDENTIAL is an EPRI paper discussing “Large Transformer End-of-Expected Life” which notes “the useful life of a large, oil-filled transformer is between 30 and 40 years with insulation or bus supports being the most likely to fail due to age. For the insulation, thermal aging of the paper insulation is the likely cause of failure.” OCC-596, Attachment 3, is a Department of Energy report from 2024, citing that large power transformers “are typically considered to have a design lifetime on the order of 40 years. In 2014, a DOE report estimated that the average age of LPTs in the North American grid was 38–40 years, indicating that a substantial fraction of those LPTs are at or over that design lifetime. These LPTs will ultimately need to be replaced or refurbished.” These industry research groups and others have provided basis within their published studies to support the concerns of failure with any transformer over 40 years in-service. As a result, Eversource’s Asset Health philosophy for transformers is to operate transformers to their maximum useful life, but plan to maintain a transformer fleet that does not exceed 70 years of age and an average age of approximately 35 years. The objective is to find the balance between affordability and preventing an aged transformer fleet that approaches the “knee of the curve” which results in failure rates that increase significantly. With a large portion of the transformer fleet being between 50 and 80 years old, as these transformers continue to approach and exceed 70 years, the rate of failure will increase rapidly. Due to the complexity and time duration of procuring and replacing transformers, a significant increase in failures would result in the inability to maintain reliability by reactively replacing an increased volume of transformer failures. The six most recent failures of transformers in CT were all attributed to internal failures of the transformer. The ages of the failed transformers were 32, 50, 52, 52, 56, and 83 years old at the time of the failure.Page 19 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-597 Page 1 of 3 Date Filed: September 23, 2026 Witness: John P. DiPaola-Tromba Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 55. For each proposed proactive replacement, identify whether the Company evaluated continued operation through enhanced inspection, testing, monitoring, maintenance, refurbishment, loading limits, load transfer, or use of a spare transformer. Provide each existing analysis and state whether it found that replacement could be deferred by one, three, or five years. If no deferral or life-extension or alternate analysis was performed, please confirm the reason. Response: Eversource employs several methods to both actively and passively monitor the health of all power transformers within its service area. Active and continuous monitoring methods include out-ofspecification alarming. Remote alarming (if applicable) is conducted through the Eversource SCADA system with alarms existing for bushing monitoring, LTC trouble, dissolved gas, oil level alarms, and oil temperature alarms, among others. Per industry best practices, local alarming is performed through panel indication lamps with corresponding nameplate alarm descriptions and annunciation technologies such as bulb annunciators and Human Machine Interfaces (HMI’s). The preventive maintenance procedures for power transformers are documented within the Eversource Maintenance Program (EMP) 5.58 Station Transformers and Oil-Filled Shunt Reactors. The inspection and maintenance tasks are catalogued into three (3) categories which include a list of asset conditions for real-time condition monitoring, time-based regular inspections, and condition-based maintenance activities. These are described in more detail below: Condition Monitoring: Various parameters related to power transformer health are actively monitored as applicable. The monitoring is performed both locally and remotely with local monitoring performed by individual equipment alarms and station annunciators. Remote monitoring is performed via Supervisory Control and Data Acquisition (SCADA) to enable realtime asset parameter output and SCADA equipment alarms. Such parameters include temperature, oil level, pressure, and load tap changer (LTC) status. Time-Directed Maintenance and Inspections: Eversource has established multiple routine maintenance activities required to be performed for all power transformers within specific time intervals. These activities include monthly visual inspections, annual oil sampling including dissolved gas analysis (DGA), thermographic readings, LTC maintenance, and major maintenancePage 20 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-597 Page 2 of 3 activities. Major maintenance activities include power factor testing, bushing testing, excitation testing, confirmation of proper operation and integrity of pressure relief devices and ensuring all alarms operate properly. Condition-Based Maintenance: These activities are on an as-needed basis when identified upon visual inspection, when performing time-directed maintenance activities, and when output from condition monitoring devices indicate outside normal operating values. Such activities include, but are not limited to, acoustic measurements, core grounding tests, leak repairs, and chassis repair. Substation Technical Engineering leverages data collected by the CASCADE, PTX Analysis, and substation equipment databases to perform asset condition assessments of power transformers. The reports are based on the following six (6) parameters with recommendations for replacement by the Substation Technical Engineering team being based upon whether two (2) of the following (6) parameters are considered high risk: • Oil Analysis Results o DGA o Fluid Quality Analysis o Furan Analysis on Main Tanks • Age • Loading • Maintenance History • Historical Test Data • Physical Inspection Findings The above practices are applicable to all power transformers. Asset age and condition will prompt enhanced inspection, testing, monitoring, and maintenance as noted in the EMP toward the goal of maximizing the usable life of a transformer. Historically the Company has effectively maximized the life of Transformers by extensive maintenance and monitoring practices, evidenced by the age demographics of the fleet which far exceed the typical design life of 40 years. While this practice continues, the risk profile of an aging fleet compounded by longer lead times and more challenging outage constraints has resulted in a need to initiate planned replacements, beyond the historical average of 1-2 transformer replacements per year, to minimize overall impact of a failed transformer and maximize efficiency. A typical transformer replacement can take from 2 to 5 years to plan and execute. From the time of identification of deteriorating health, the transformer will continue to degrade over the course of the project execution time period. While spares are an effective mitigation plan for emergent failures, it is not a “one-size fits all” long-term mitigation plan to address the fleet risk because depending on when the failure or urgent replacements occur, it may happen at a high-risk period of the year which cannot be controlled exposing the system and customers to a much higher risk. Allowing transformers to run to failure also poses a serious safety risk to both the public and utility
Text of OCC Set 17_COMBINED.pdf
Extracted from the file · 45 pages · 69,741 characters
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.