    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-598 Page 1 of 1 Date Filed: September 23, 2026 Witness: John P. DiPaola-Tromba Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 67. Confirm whether Shepaug 13A is approximately 85 years old, has Short-Term and Long-Term Health Index values below 0.5, and is not scheduled for replacement during 2027–2031. Identify each younger transformer scheduled for replacement before Shepaug 13A and provide the specific condition, capacity, safety, or compliance reason supporting that ordering. Response: Exhibit CLP-TSP-3, at 67, is correct in the statement that the Shepaug 13A-21X transformer is currently 85 years old. The most recent data from July 2026 indicates Short-Term Health Index of 0.194 and Long-Term Health Index of 0.289. The statement of “No projects for Shepaug 13A are currently in the 5-year plan” included in Exhibit CLP-TSP-3, at 67, was an error. The Shepaug 13A-21X transformer is one of the transformer asset condition transformer replacement projects within the Targeted System Plan. There are two active asset condition projects with transformer replacements scheduled prior to the replacement of the Shepaug 13A-21X transformer. CS00286 is a project that includes replacement of the Franklin Drive 1B substation transformers 1B-4X and 1B-5X. This project was established to replace the transformers that were installed in 1953 (73 years old), increase station capacity, and remove an area phase shift. CS00396 is a project that includes the replacement of the Stevenson 14A substation transformer 14A-1X after its failure. This transformer was 83 years old at the time of failure.
  2. Page 23 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-599 Page 1 of 3 Date Filed: September 23, 2026 Witness: David L. Gladey and Lavelle A. Freeman Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 22–24. a. Provide the data underlying the headroom and constrained-area presentations on pages 22– 24. For each substation identified as constrained, provide its normal and emergency rating, five-year historical load and peak load data, available headroom, forecast first year of violation, and proposed project cost. b. For each constrained substation identified, provide the existing analysis of temporary and permanent load transfers. Identify the receiving substation or feeder, available transfer capacity, MW that could be transferred, required enabling work, estimated cost, and reason any transfer was rejected. Please confirm if no transfer analysis was performed. c. Provide a summary of each actual substation capacity violation and stranded-load event experienced from 2016 through the present. Identify the substation, date, maximum loading, applicable rating, duration, contingency, customers at risk, customers interrupted, and whether load transfer prevented or reduced an outage. Response: a. The graphic depicted in CLP-TSP-3, at 22, is derived from headroom data for substations with actual values, time series data, and ratings shown on our public maps using the, Eversource CT Grid Connection Navigator. Loads are based on our most recent summer peak year, 2025. Please refer to OCC-599, Attachment 1 CONFIDENTIAL, for project forecast violation year and the 5-year historical peak load data for each respective project. The table contains the LCC rating of each substation which is the planning criteria identified within the DSPG, please refer CLF-SC-023, Attachment 1. The following substations have projects initiated and have obtained at a minimum a conceptual level estimate: Substation West Brookfield 14H Beacon Falls 11N Franklin Drive 1B Southington 4C Berlin 6A_13.8kV Westside 7A Hopewell 22R Estimated Project Cost $16,900,000 $12,632,000 $17,986,000 $9,772,600 $23,199,000 $18,399,000 $17,518,000
  3. Page 24 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-599 Page 2 of 3 All other substations within the attachment have not had a comprehensive evaluation to identify possible solutions and the costs associated with those solutions. The table below depicts a high-level tabletop analysis for possible projected cost of a substation solution. These costs will be refined as these projects progress through the funding process and receive full engineering analysis for solutions and conceptual level estimates. Substations Waterside 22M Flax Hill 24A Rocky Hill 12Y Triangle 11A Middle River 28M Rockville 14W Campville 14R Baldwin 13F Tracy 14M Frybrook 13B Brooklyn 30Y High Level Estimate $600,000 $500,000 Less than $250,000 $4,800,000 $500,000 $10,000,000 $52,300,000 $20,250,000 $9,900,000 $20,000,000 Less than $250,000 Project Status Investigating Project Need Investigating Project Need Investigating Project Need – Anticipating Permanent Load Transfer from West Brookfield 14H with settings changes only Initial Funding Approved Investigating Project Need Initial Funding Approved Partial Funding Initial Funding Submitted Initial Funding Approved Initial Funding Approved Investigating Project Need – Anticipating Permanent Load Transfer from Tracy 14M or Frybrook 13B with settings changes only b. Prior to initiating a funding project, permanent load transfers are, in many cases, a preferred solution if the conditions at the constrained substation and the adjacent area support this as these are typically substantially lower cost than substation investments and have a much more rapid deployment timeline. Historically these load transfers were not explicitly tracked, and the Company does not possess historical data as it pertains to deferrals by means of permanent load transfer. As of 2024 the Company identified this opportunity to begin having a detailed record of load transfers, partly in response to increasingly constrained regional capacity. The Company is now prepared to track these transfers in the Step Load Tracker as a load transfer on the receiving substation and a negative load transfer to the originally constrained station. This tracker will not only allow the forecasted load transfer to be visible but will also allow for historical reporting of deferred major capital upgrades through completed load transfers.
  4. Page 25 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-599 Page 3 of 3 The newly identified projects are in early stages of development and have not yet completed the solution selection process yet. Therefore, these projects would not yet have any tracked load transfers or analyses completed to date. Following initial funding of these projects, all available solutions including permanent load transfers, non-wires solutions, and traditional solutions are identified and evaluated for suitability and for viability. No potential solutions have been rejected at this time from these newly identified projects. Temporary transfers are reserved for substations anticipating overload during a current planned peak event, planned or unplanned outages, or other transient system events. Temporary solutions place the system in an abnormal condition which can impact operations, protections and controls, and automations within the system and are not used as a long-term solution except where necessary to address real-time operational needs that do not have a permanent solution placed into service. c. All substation forecasted violations are mitigated by using pre-contingent load transfers to adjacent substations with remaining capacity. In accordance with planning criteria in the Distribution System Planning Guide (CLF-SC-023, Attachment 1), the Company plans and designs its system to avoid overload of major substation assets such as transformers during an N-1 event. During real-time operation, these overload scenarios are avoided through the use of monitoring technology and planned mitigation measures. However, the Company’s substation planning group recreates a normalized substation load to aid in the process of forecasting for future years.
  5. Page 26 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-600 Page 1 of 1 Date Filed: September 23, 2026 Witness: Lavelle A. Freeman and Juan F. Martinez Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at 24. Define “stranded load” as used on page 24, including its unit of measurement and the conditions under which load is classified as stranded. Response: Stranded load is defined as mega-watts (MW) of load that is at risk of not being restored following a single failure or emergency event until extensive repairs are completed. Customer load will be classified as stranded when a substation’s forecasted load exceeds its emergency rating, also referred to as Load Carrying Capacity “LCC”. Exhibit CLP-TSP-3, page 24, and this definition, are limited in scope to substation planning.
  6. Page 27 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-601 Page 1 of 1 Date Filed: September 23, 2026 Witness: Lavelle A. Freeman and Juan F. Martinez Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at 24. For each year from 2022 through 2026, provide the actual stranded load experienced on the system. For each event, identify the substation, date, stranded MW or MVA, duration, cause, and number of customers whose service could not be restored. If no actual stranded load occurred in a year, please report zero. Response: The chart on Exhibit CLP-TSP-3, at 24, refers to a modeled evaluation of the system based on substation load that would not be restored during an N-1 event even after pre-contingent load transfers. In the years identified, there has not been a substation N-1 event that has resulted in stranded load because the substations are designed to handle the event with customers experiencing either no outage or at worst limited to momentary outages during switching or restoration activities. This exhibit highlights, that for the substation in which this risk has been identified it is highly likely that customers will experience an outage related to a transformer failure. The Company’s response to information request OCC-603, with an anticipated filing date of September 30, 2026, will provide more detailed information regarding the substation of concern.
  7. Page 28 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-602 Page 1 of 2 Date Filed: September 28, 2026 Witness: Lavelle A. Freeman and Juan F. Martinez Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3. For each proposed capacity project, identify every temporary or permanent load transfer evaluated by the Company. Provide the MW available, estimated cost, implementation time, and whether the transfer was accepted or rejected. a. State whether any evaluated load transfer could eliminate the forecast overload or defer the proposed project. For each such transfer, provide the amount of overload addressed, the resulting revised need date, and the capital investment that could be deferred. Response: Temporary Transfers: Refer to OCC-602, Attachment 1 CONFIDENTIAL, for all temporary load transfers evaluated by the Company for the summer of 2026. The temporary load transfer database is evaluated and updated in May of each year using the latest substation forecast available for that given summer peak load. This database identifies the substation or transformer limitation, the forecasted load, and the amount of load required to be transferred. The Company evaluates available feeder ties and load that can be transferred to meet the required need as defined. All temporary transfers are accomplished using DSCADA devices. Permanent Transfers: Historically the Company has not officially tracked permanent load transfers used to defer substation capacity upgrades; therefore, the permanent load transfers at these substations are not readily available. The Company has recently established a new step load tracking process that also includes load transfers between substations. This new tool was established in 2024 and will not only show future projected load transfers that will feed the substation forecast, but will also keep record of any completed load transfer and the amount of load in kVA. This tool shows both inbound and outbound transfers. Historically, many of these load transfers were handled utilizing settings changes and were low cost, rapid deployment solutions, so the full capital solution process was not required and limits the information that was captured regarding historical changes to the original designed configuration of the substation. OCC-602, Attachment 2 CONFIDENTIAL, is an export query from the “Step Load Tracker” tool. The query has been filtered to show all completed and potential future permanent load transfers between substations. As noted above, this tool was created to help track permanent load transfers and only identifies load transfers from 2024 and beyond. Please note that not all permanent load transfers identified in this table are due to substation capacity.
  8. Page 29 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-602 Page 2 of 2 In CLP-TSP-3, the Company has included substation projects that would likely require capital project development activity within the ten-year planning horizon. These new substation capacity projects could enable additional load transfers to help alleviate nearby substations. Where possible, these load transfers will be completed by reconfiguring circuits and applying new settings to recloser devices. The changes can be accomplished under annual work orders and do not require major capital projects.
  9. Page 30 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-603 Page 1 of 2 Date Filed: September 28, 2026 Witness: Lavelle A. Freeman and Juan F. Martinez Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at 24, figure ‘substation violations -statewide’, a b For each year shown, state the MW represented by the “Risk of Stranded Load” line. Define “risk of stranded load” and explain how it is calculated. Provide all data, assumptions, calculations, and analyses supporting the values in native, machine-readable format with formulas intact. The red line becomes non-zero beginning in 2023. For each value shown from 2023 through the latest historical year, clarify whether it represents actual stranded MW or a modeled estimate of load that could have become stranded. If it is modeled risk, explain why the graph presents a risk estimate rather than actual stranded-load experience for those years. Response: a The MW representing “Risk of Stranded Load” within this figure is specifically depicting the constrained area in Western CT, which is identified in Exhibit CLP-TSP-3, at 22-23. The individual substation 10-year forecasts for substations within this area, and already experiencing an overload can also be referred to in OCC-591, Attachment 1 CONFIDENTIAL. To mitigate any substation forecast exceeding 100% of LCC for the most recent summer peak loads, the Company will perform temporary load transfers to adjacent substations if it does not create new loading concerns at the receiving stations. The issue in this region identified through a regional analysis in 2025, is that the adjacent substations do not have adequate capacity to allow enough load to be transferred from the substation listed at OCC-591, Attachment 1 CONFIDENTIAL, at page 1, to keep the remaining transformers below their emergency rating during an N-1 event. Instead, the Company has chosen to disable some auto restoration capabilities within the substation to avoid exceeding transformer emergency ratings. This will result in interruptions for these customers with no planned alternate source. The difference in load between forecasted above emergency limits and what can be transferred is calculated as “Risk of Stranded Load” in MW. Please refer to OCC-602, Attachment 1 CONFIDENTIAL, to see the calculated values for summer of 2026. The remaining values forecasted from 2027-2035 is incremental “Risk of Stranded Load” based on the Triangle 11A forecast presented in OCC-591, Attachment 1 CONFIDENTIAL.
  10. Page 31 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-603 Page 2 of 2 b The Graph represents the risk of stranded load following a contingency condition at the substation. For this substation, the Company has not experienced a single contingency condition during peak load days since 2023, so therefore showing actual stranded load is not applicable. Instead, the Company shows the modeled stranded load which represents the risk to customers during such low probability, high impact events. Due to the severity of these types of events, the Company’s planning standard in the DSPG (refer to CLF-SC023, Attachment 1) is to avoid loss of load (or stranded load) for a single-contingency condition. For this reason, the planning criteria ensure that customers have an alternate supply for a given failure of major equipment, and this stranded load represents those customers that do not currently have a pre-planned alternate feed to supply their needs.

Text of OCC Set 17_COMBINED.pdf

Extracted from the file · 45 pages · 69,741 characters

Text of OCC Set 18_COMBINED.pdf

Extracted from the file · 24 pages · 49,328 characters

As listed on the current system

Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

This filing on the current system (opens in a new tab)