Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

Files6

Search terms highlighted
Eversource rate increase is on 10 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
8 pages match
  1. Page 6 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-591 Page 4 of 6 e. the specific weather condition(s) or percentile(s) (e.g., a 50/50 normal or a 90/10 or 95/5 extreme weather scenario) assumed for feeder- and substation-transformer-level planning purposes. If the Company does not maintain a single document of this kind, please provide all documents that collectively provide this information. If the Company contends that any portion of the requested document(s) is confidential or proprietary, please produce it subject to an appropriate protective order rather than withholding it, and identify the specific basis for confidentiality as to each such portion. CLF-SC-022 Response: a. The information requested is detailed, comprehensive data, constituting highly confidential Critical Energy Infrastructure Information (“CEII”) that qualifies for protection under PURA’s requirements for CEII, which protection the Company will seek when it is submitted to the record. The Company does not currently have an executed non-disclosure agreement (“NDA”) in place with the Conservation Law Foundation and Sierra Club (“CLF-SC”), although the Company is in contact with CLF-SC and is appreciative for their coordination and collaboration. In addition, the Company is in the final stages of implementation of new internal information systems and document controls for enhanced cybersecurity goals that would apply to this data production. Therefore, the Company plans to supplement this response with production for all parties having executed a non-disclosure agreement with the Company, once an executed NDA is obtained from CLF-SC. In the interim the Company is submitting all non-confidential parts of the CLF-SC interrogatories. b. The substation forecasting process begins by forecasting the peak demand at the Eversource system level for Connecticut. The Eversource system-level peak demand is forecasted using an econometric model that evaluates historical peak demand as a function of peak day weather conditions and the economy. The econometric model utilizes two different weather variables in forecasting summer peak demand, a three-day weighted temperature-humidity index and cooling degree days. The forecast assumes normal weather conditions based on the most recent 10-year period. Eversource produces a ‘50/50’ and a ‘90/10’ peak demand forecast. The ‘50/50’ forecast is based on normal 10-year weather and has a 50 percent chance of being exceeded. The 90/10 forecast is the extreme weather scenario that only has a 10 percent chance of being exceeded. Moody’s Analytics, an international economic consulting company, provides the economic history and forecast. Only the 90/10 peak demand forecast is relevant to and utilized by system planning. Once Eversource finalizes the system-level forecast, the substation level forecasts are developed. Substation forecasts are developed using panel data econometric models that evaluate substation historical peak demand as a function of the Eversource system peak demand history and forecast. The substation econometric models measure how each substation performed relative to the Eversource system and then project that relationship into the future. There are 11 different econometric models for the substation forecast for CT, determined by region and size of the substation. After a trend forecast is produced for each substation, the forecast is adjusted for energy efficiency, solar, electric vehicles, and large customer projects. Company sponsored energy efficiency reductions are proportionally applied to each substation based on historical peak demand. Electric vehicles and solar adjustments are assigned to specific substations based on historical trends, customer characteristics, the propensity for adoption, and their 24hour time of use profiles. Further explanations on the calculation of these out of model adjustments can be found in part b of this response. Specific, identified large
  2. Page 7 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-591 Page 5 of 6 development projects or expected changes in system operations that the econometric forecasts could not otherwise predict are added to their respective substation. Heating Forecast: Currently, the Company's heat pump forecasts have not been released. The methodology is currently being reviewed and further refined and will be implemented in future forecast applications. Solar Forecast: System-level installed capacity forecasts are created by fitting a logistic curve to the Company's historical installation data, where the solar installations are categorized into residential rooftop, commercial rooftop, and commercial ground mounted/canopy based on installed capacity thresholds. The allocation of system-level installed capacity to the station level was done in Gridtwin software, where the allocation is based on customer propensity for residential projects and project economics for commercial projects on a property by property basis (e.g. anticipated interconnection costs, incentives, etc.). The resulting station level forecast is scaled to match that of the system level forecasts. Substation-level load is estimated by using installed capacity and station-level global horizontal irradiance (GHI) data from the SolarAnywhere API. Using hourly irradiance data from historical summer month the Company calculates percentiles for expected irradiance of each hour for the historic global horizontal irradiance which is then applied to calculate a projected solar output at each hour of the peak day. This allows an adjustment of solar output to account for potential overcast conditions during hot and humid peak loads. Using the forecasted solar output for the peak day, the impact to the peak, at time of peak, is calculated. The same is done for the winter estimate, except only winter months are chosen. Distributed Energy Storage Forecast: The Company does not currently forecast distributed energy storage’s impact to peak. Energy Efficiency Forecast: Company-sponsored EE projections are based on the most recently approved Three-Year Plan which the Company carries forward assuming stable and continuing investments into energy efficiency with comparable yields in savings, while solar projections are developed consistently with historical trends, state, and federal funding incentives. Naturally occurring EE (i.e., reduction in demand due to nonprogrammatic improvements in end-use efficiency) is directly captured in the trend forecast as it impacts the peaks, which in-turn informs the model. EV Forecast: To model such impacts as accurately as possible, the Company models electric vehicle adoption and charging through a variety of factors including consumer purchase and travel trends, existing and planned charging infrastructure, and policy. To better assess the impact of electrification in the transportation sector, the Company employs a variety of analysis methods and data sources, including: • System level EV adoption: Analysis starts with historical adoption from vehicle registration. Near-term adoption forecasts are adjusted to reflect changes in state and federal policies that may accelerate or slow EV adoption. State-level decarbonization goals are used to set long-term adoption levels and inform benchmarks for the medium-term forecast trajectory.
  3. Page 8 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-591 Page 6 of 6 • • • c. Charging profiles and locations: Using GPS tracking and mobility data, this analysis determines the flow of traffic through the state and identifies preferred regions for charging infrastructure development based on the number and length of trips terminating there, as well as the time those charging events might occur. This allows the Company to build station level specific charging profiles, as stations vary based on their customer base (i.e. daytime charging in C&I heavy substations vs evening charging at residential heavy substations). The amount and type of charging infrastructure needed to sustain the system level electric vehicle projections and likelihood of development of charging stations in certain geospatial areas are considered. Charging coincidence and aggregated impacts: While impacts of electric vehicle charging remains very high on the last mile of the system where small numbers of chargers sit behind a single asset (i.e. a pole mount transformer serving 3 houses, each with an EV, experiences a charging coincidence peak of 1), larger assets such as substations significantly benefit from coincidence factors driving down the aggregated impact. The Company utilizes mobility data to estimate the required charging duration of a vehicle arriving at a charging location and models a time series of all charging events serviced by a bulk station. This reduces the overall coincident impact of a charging location to the bulk system, depending on location, to anywhere between 1.4 kW and 2.5 kW, averaging at ~2 kW. Large charge parks and hubs: The Company tracks all large charging parks and hubs as individual out of model adjustments in its step load process. Given their singular large impact to the local system and the very likely occurring system investments based on their upgrades, the Company cannot make longterm forecasts as to when such assets transition. Step loads enter the forecast once the customer has made a commitment by opening a workorder with the Company and having made the design deposit. Eversource produces a ‘50/50’ and a ‘90/10’ peak demand forecast. The ‘50/50’ forecast is based on normal 10-year weather and has a 50 percent chance of being exceeded. The 90/10 forecast is the extreme weather scenario that only has a 10 percent chance of being exceeded. Only the 90/10 scenario is used to inform the Company’s capacity projects.
  4. Page 9 of 31Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-592 Page 1 of 1 Date Filed: September 23, 2026 Witness: Lavelle A. Freeman and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 49. State whether the Company evaluated each capacity project using historical forecast accuracy, only committed new-customer loads, and expected weather instead of 90/10 weather. For DER-driven projects, state whether historical DER completion and delay rates were considered. If such analyses were performed, provide them, including the resulting need date and project timing. Response: The Company does not evaluate future capacity projects based on historical forecast accuracy. The Company uses only “firm” new customer loads in its step load modifier to the forecast. All capital projects are developed based only on those firm new customer loads in the forecast. The term “expected weather”, without further clarity of definition, is taken by the Company to mean “weather scenario that can be expected.” The Company defines its 90/10 weather scenario as the highest 3-day weighted-average temperature humidity index recorded over the past 10 years. By definition therefore any 90/10 weather condition taken for the forecast by the Company has occurred once over the past decade and can therefore be expected to occur again over the next decade. The Company does not increase those weather assumptions from what was recorded over the past 10 years.
  5. Page 10 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-593 Page 1 of 1 Date Filed: September 23, 2026 Witness: Lavelle A. Freeman and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 49. For each proposed capacity project, provide the annual load forecast at the affected substation and feeder level through 2040. Identify the forecast peak, applicable equipment rating, percentage of rating, forecast year of first exceedance, and all newcustomer or DER projects included in the forecast. Provide the data in native, unlocked Excel format. Response: The Company creates a 10-year peak load forecast which, based on the most current vintage from March 2026, extends to 2035. The peak load forecast does not extend to 2040. For the annual load forecast for each capacity project, please refer to the OCC-591, Attachment 1 CONFIDENTIAL.
  6. Page 11 of 31Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-594 Page 1 of 4 Date Filed: September 28, 2026 Witness: Lavelle A. Freeman and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 49. For each proposed substation or feeder capacity project, provide the following information: a. Traditional upgrade scope and total cost, including labor, materials, overheads, contingency, etc. b. Study year and forecast year(s). c. Traditional project’s planned in-service date. d. Earliest feasible NWA deployment year and the final year of the analysis period. e. Substation, feeder and geographic location of the constraint and potential NWA. f. For each forecast year, provide: i. Maximum capacity exceedance in MW; ii. Energy above the applicable equipment rating in MWh; iii. Annual increase in the exceedance in MW and MWh; iv. Maximum continuous duration of the exceedance in hours; v. Number of exceedance events and peak days; vi. Whether peak days are consecutive; and vii. Applicable normal or contingency equipment rating. g. Identify the NWA technologies and resource mix evaluated, including the assumed percentage or capacity of battery storage, solar PV, demand response, energy efficiency and other resources. Provide the information in native, machine-readable format, together with the hourly load forecast and applicable equipment rating used to calculate each annual MW, MWh and duration value. Response: Substation Capacity Projects: a. CLP-TSP-1 at 49 refers to the capital projects in Company’s Sustained Plan that are identified and will be developed to meet system needs and objectives. The specific projects related to peal load and capacity needs are listed in CLP-TSP-3 at 94-95. Presently, these projects are all at the conceptual stage and therefore are not yet at the stage where detailed engineering studies and evaluation of solutions and alternatives have been completed. Engineering scopes, cost estimates, and materials will be defined as the projects are
  7. Page 12 of 31Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-594 Page 2 of 4 developed through the Eversource Capital Project Approval Process and receive project funding. b. Please refer to OCC-591, Attachment 1. The excel worksheet contains a separate workbook with each substation forecast for the sustained performance plan. c. The substation capacity projects identified in OCC-591, Attachment 1, do not currently have planned in-service dates as these projects are still in the conceptual stage and do not have approved scopes of work. d. The forecast evaluation years are noted in column headers in OCC-591, Attachment 1 (2026-2035). As noted above, these projects are in the very early stage of development. As the Company evaluates and develops solutions and alternatives to meet the identified need, NWA solutions will be considered in accordance with the Company’s distribution planning process in the DSPG (see CLF-SC-023, Attachment 1). A variety of solution alternatives will be developed to resolve the constraint including, but not limited to, increasing equipment ratings (e.g., using cooling techniques), transferring load, upgrading equipment, and applying non-wires solutions. e. CLP-TSP-3 at 21-23 shows geographic location of constrained areas within the system. Substation capacity constraints that comprise the identified need are within the area served by the substation and are based on violation of substation equipment Emergency Thermal Limits during the loss of a single element within the substation fence. A typical example is the loss of the largest transformer for each voltage class within a substation. f. Please refer to OCC-591, Attachment 1. • For Part (i): Refer to “MVA Remaining”, column (K) • For Part (ii): Because these projects are still at the conceptual stage, this analysis has not yet been completed. However, it will be completed as part of the NWA solution development. • For Part (iii): Because these projects are still at the conceptual stage, this analysis has not yet been completed. However, it will be completed as part of the NWA solution development. • For Part (iv): Because these projects are still at the conceptual stage, this analysis has not yet been completed. However, it will be completed as part of the NWA solution development.
  8. Page 13 of 31

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-594 Page 3 of 4 • For Part (v): Because these projects are still at the conceptual stage, this analysis has not yet been completed. However, it will be completed as part of the NWA solution development. • For Part (vi): The Company’s forecast is based on a 3-day weighted average temperature humidity index. • For Part (vii): Refer to “LCC”, column (I) and “Firm”, column (L) for substation emergency rating, which is the trigger for the capacity projects in the Sustained Performance Plan. g. The substation capacity projects identified in OCC-591 Attachment 1, do not currently have NWA solutions identified as these projects are still in early development stages. The projects will all undergo a full NW screening to determine the suitability of an NWA as a potential solution, and viable NWA solutions will be reviewed and analyzed. Feeder Capacity Projects: a. Please refer to OCC-594, Attachment 2 CONFIDENTIAL, Feeder Capacity Projects for traditional upgrade scope and total cost, including labor, materials, overheads, contingency, etc. b. Please refer to OCC-594, Attachment 2 CONFIDENTIAL, for Feeder Capacity Projects for the study year. Distribution capacity projects are based on actual metered data and have been designed in accordance with the Distribution System Planning Guide to provide safe reliable power. Forecasting is not performed at the distribution line level as these capacity projects can be executed in a short timeframe when compared to substation capacity projects. c. Please refer to OCC-594, Attachment 2 CONFIDENTIAL, for Feeder Capacity Projects for the Traditional project’s planned in-service date. d. Line projects within the 2027–2031 plan have been designed in accordance with the Distribution System Planning Guide to provide safe reliable power. Projects approved after January 2025 have undergone the newly established NWA process laid out by PURA and have been reviewed by the process monitor and PURA, both concluding no further investigation is required. Please refer to the Non-Wires Solutions Process Cycle 1, Docket 25-08-08, Final Decision. 1 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/4b2aa80a45d5fe8185258d5c0051 dfbf/$FILE/250808-121025.pdf 1
  9. Page 14 of 31Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-594 Page 4 of 4 e. Please refer to OCC-594, Attachment 2 CONFIDENTIAL, for Feeder Capacity Projects for the substation, feeder and geographic location of the constraint. f. Forecasting is not performed at the distribution line level as these capacity projects can be executed in a short timeframe when compared to substation capacity projects. Please refer to OCC-594, Attachment 2 CONFIDENTIAL, for Feeder Capacity Projects for the following based on actual metered data: i. Maximum capacity exceedance in MW; vii. Applicable normal or contingency equipment rating The following data is not currently available: ii. Energy above the applicable equipment rating in MWh; iii. Annual increase in the exceedance in MW and MWh; iv. Maximum continuous duration of the exceedance in hours; v. Number of exceedance events and peak days; vi. Whether peak days are consecutive; and g. Capacity NWA alternatives were evaluated with battery storage.
  10. Page 15 of 31Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-595 Page 1 of 1 Date Filed: September 23, 2026 Witness: John P. DiPaola-Tromba Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 55. Confirm whether the proposed bulk transformer replacements are proactive replacements rather than replacements of failed transformers. If not confirmed, identify each replacement that is required because of an existing failure, capacity constraint, or mandatory compliance requirement. Response: Exhibit CLP-TSP-1 beginning at page 55, discusses the Targeted System Plan including an average of eight bulk and distribution transformers with an investment of ~$78M per year. These transformers are discussed below. The transformers included in the plan within this investment category are proactive replacements of units over 50 years old with asset health concerns. With a large portion of the transformer fleet being between 50 and 80 years old, as these transformers continue to approach and exceed 70 years, the rate of failure will increase rapidly. Due to the complexity and time duration of procuring and replacing transformers, a significant increase in failures would result in the inability to maintain reliability by reactively replacing an increased volume of transformer failures. The Stevenson 14A Transformer Replacement project is an ongoing project included in the Targeted System Plan related to the failure of the 14A-1X transformer at the Stevenson 14A substation. There are no other projects included in the Targeted System Plan that are a replacement of a failed transformer. The transformer projects identified for replacement because of an existing capacity constraint are included in the Substation Capacity/System Planning investment category.

Text of OCC Set 17_COMBINED.pdf

Extracted from the file · 45 pages · 69,741 characters

Text of OCC Set 18_COMBINED.pdf

Extracted from the file · 24 pages · 49,328 characters

As listed on the current system

Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.