Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Text of OCC Set 15_COMBINED.pdf
Extracted from the file · 31 pages · 65,747 characters
Page 1 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-711 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-02)(MS24E), p. 120. All crew members and vehicles billed for 11 hours, but the times entered in boxes 24 and 25 indicate crews worked on different events, some of which do not tally to 11 hours of work. Please clarify if all crew members and vehicles worked 11 hours and, if so, explain how Eversource verified the amount of time each crew and vehicle worked. Response: All crews worked the 11 hours that was billed. This D&D contingent sent all personnel available to assist with event 5275341. This was a major job that resulted from a large tree bringing down many spans of primary wire and a transformer, as well as breaking a pole and creating an oil spill. The D&D contingent did not wrap the job up until 23:00. After cleaning the job site and wrapping up, this would account for the full 11 hours.Page 2 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-712 Page 1 of 3 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-02) (MS24E), p. 122. The work descriptions include “comm down” and “comm box door open, close it and secured.” Please explain what “comm” is in these descriptions. Response: “Comm” refers to communications equipment, such as phone, cable, fiber, etc. Under Event 5277103, a customer reported a trouble call to the Company that a tree had fallen on some wires near 175 Vine Street in Hartford. Upon arrival, the crew determined that the wire impacted was in fact a communications wire, not a power wire. Under Event 5277624, a customer reported that a utility equipment box’s door was flapping in the wind. The crew responded and identified that it was a communications equipment box, closed and secured it shut.Page 3 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-712 Page 2 of 3Page 4 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-712 Page 3 of 3Page 5 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-713 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-02)(MS24E), p. 129-144, 157-158. Many of the hotel receipts indicate one adult/guest in the room. Please provide the Company’s policy and/or contractual provision with these vendors indicating the provision of individual hotel rooms. Response: Referring to Exhibit ACCT-2(CLP-5A-02)(MS24E), Outside Contractors-Vendors, Line 114, vendor D&D Power LLC, invoice total amount of $324,466. During storm restoration events, the Company initially utilizes hotels with which it maintains contractual lodging agreements and works to secure all available accommodations within those facilities. When sufficient lodging cannot be obtained through these contracted vendors, the Company will secure accommodations at other available hotels within the affected area to ensure personnel have adequate lodging during the event. Consistent with past practice, the Company generally requests separate hotel rooms for supervisory personnel, separate accommodations for female employees, and double occupancy arrangements for line crews where practical. However, room availability and hotel capacity constraints are often beyond the Company's control, particularly during widespread storm events when lodging demand is elevated. As a result, hotels may be unable to accommodate all rooming preferences requested by the Company. In circumstances where double occupancy or other preferred lodging arrangements cannot be accommodated, the Company is responsible for the cost of any room assigned by the hotel to an employee at the time of check-in. The Company's primary objective is to ensure that all personnel responding to the storm event are provided with suitable accommodation and the opportunity to obtain adequate rest between shifts. Providing lodging to restoration personnel is a necessary component of the Company's storm response efforts, as it enables employees to receive proper rest and safely return to work for their subsequent assignments.Page 6 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-714 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-02) (MS24E), p. 153. a. Box 12 indicates 11 hours of work, but boxes 24 and 25 appear to total a maximum of 9 hours of work (earliest work begins at 12:30 p.m.; latest work ends at 9:30 p.m.). Please explain why 11 hours of work was charged. b. The crossover in work times in boxes 24 and 25 indicates not all crews could have worked until 9:30 p.m. Please explain how the Company verified every crew member and every vehicle listed worked 11 hours (or 9 hours, depending upon the response to (a)). Response: a. The crews are not only being paid for the time the crews are physically working an outage. Storm restoration necessarily includes a wide range of activities before and after the actual repair work. If the crew worked for 9 hours and completed the job at 21:30, it is entirely reasonable for the crew’s total workday to extend by several hours. The additional time could include securing and cleaning up the job site, cleaning off trucks, and traveling back to the hotel. Those activities are not the physical repair of the electrical equipment itself, but are a necessary and integral part of performing the storm-restoration work. A crew cannot simply stop the clock at the moment the damaged equipment is repaired and disregard the work necessary to safely close out the day’s work. b. Given that there are four-line workers on this crew (1 safety and 1 mechanic), it had split into two crews to work both jobs ending at 21:30. Each of those jobs required two- line workers.Page 7 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-715 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-02) (MS24E), p. 154. a. Box 12 indicates 11 hours of work, but boxes 24 and 25 appear to total a maximum of 7 hours of work (earliest work begins at 12:30 p.m.; latest work ends at 7:30 p.m.). Please explain why 11 hours of work was charged. b. In boxes 24 and 25, there is a three-hour gap in time (from 2:30 p.m. until 5:30 p.m.). Please explain what the crew and vehicles did during that time and why it was billed as work time. Response: a. Based on the Company’s review of the specified timesheets, there is no significant missing information within the “Work Distribution” section. The timesheets are not a contemporaneous record of every minute, task, or discrete activity undertaken by a crew in the course of performing its work. Nor is the timesheet the method by which the Company manages the crews or assures that the crew is working how and where the crews are supposed to be. The timesheets are used to document the time worked and general nature of the work performed. Timesheets are typically completed at the end of each workday, with time allotted to the major work assignments completed that day. Given the nature of storm restoration work, it would be impractical and inconsistent with the crews’ primary responsibility of safely and efficiently restoring electric service to require personnel to contemporaneously record every minute task or discrete activity performed throughout the workday. The Company manages the crews through the oversight of the employee dispatching the crews and the External Field Resource Coordinator (“EFRC”), who is physically in the field with the crews, ensuring that the crews are properly engaged and assigned work to restore the system from storm damage. The linemen who are filling out the timesheets are primarily focused on ensuring that the crews are working safely in a dynamic environment that is full of potentially lethal hazards. The EFRC is the Company representative that is responsible for signing the timesheets and they have personal knowledge of the work that the crews have performed and the activities they have engaged in, particularly in relation to the hours stated in boxes 24 and 25.Page 8 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-715 Page 2 of 2 Importantly, the crews are in “working” status for the entire duration of their shift – from start to finish. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet. b. Please refer to subpart (a), above. Further, all contractor crews and non-Connecticut based Company employees working storm restoration in Connecticut are required to be lodged in hotel rooms. Prior to beginning their first job of the day, the crews eat a meal, conduct safety briefings, perform U.S. Department of Transportation mandated pre-trip inspections on their trucks, and restock their trucks as necessary with material needed for their day. This takes time and the crews are methodical because the crews do not want to get out into the field without the right equipment or materials. The crews start the work shift by driving from the hotel rooms to the job site and depending on the availability of hotel rooms, that can add an additional 30 minutes or more. At the end of the crews last job of the day, the crews are required to clean up the job site, properly store all equipment and tools, eat a meal after performing physical labor all day in situations where personal safety is continually at risk and often in unforgiving conditions; and drive back to the hotel rooms, which again, could be 30 minutes or more away from the jobsite. Therefore, intervals of time at the start and end of the work shift and between restoration “events” is an expected and necessary part of the work shift, for which the crews are paid. Within a work shift, the crews do not get paid differently for different types of work. Therefore, from a field perspective, the start and stop time is the critical data point for the timesheet.Page 9 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-716 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-02) (MS24E), p. 155. Box 12 indicates a total work time of 16 hours, but boxes 24 and 25 appear to total a maximum work time of 12 hours. a. Was this crew on standby from 6 a.m. to 8 a.m.? If yes, please explain why this time was billed as work time and not standby time? If no, please explain what occurred in those two hours and how Eversource is now aware of what occurred. b. Please explain why the crew ended work at 8 p.m. but billed until 10 p.m. Response: a. Based on the Company’s review of the specified timesheets, there is no significant missing information within the “Work Distribution” section. The timesheets are not a contemporaneous record of every minute, task, or discrete activity undertaken by a crew in the course of performing its work. Nor is the timesheet the method by which the Company manages the crews or assures that the crew is working how and where the crews are supposed to be. The timesheets are used to document the time worked and general nature of the work performed. Timesheets are typically completed at the end of each workday, with time allotted to the major work assignments completed that day. Given the nature of storm restoration work, it would be impractical and inconsistent with the crews’ primary responsibility of safely and efficiently restoring electric service to require personnel to contemporaneously record every minute task or discrete activity performed throughout the workday. The Company manages the crews through the oversight of the employee dispatching the crews and the External Field Resource Coordinator (EFRC), who is physically in the field with the crews, ensuring that the crews are properly engaged and assigned work to restore the system from storm damage. The linemen who are filling out the timesheets are primarily focused on ensuring that their crews are working safely in a dynamic environment that is full of potentially lethal hazards. The EFRC is the Company representative that is responsible for signing the timesheets and have personal knowledge of the work that the crews have performed and the activities the crews have engaged in, particularly in relation to the hours stated in boxes 24 and 25. Importantly, the crews are in “working” status for the entire duration of their shift – from start to finish. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an “event” everyPage 10 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-716 Page 2 of 2 minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet. b. Please refer to subpart (a), above. Further, all contractor crews and non-Connecticut based Company employees working storm restoration in Connecticut are required to be lodged in hotel rooms. Prior to beginning their first job of the day, the crews eat a meal, conduct safety briefings, perform U.S. Department of Transportation mandated pre-trip inspections on their trucks, and restock trucks as necessary with material needed for their day. This takes time and the crews are methodical because they don’t want to get out into the field without the right equipment or materials. The crews start the work shift by driving from their hotel rooms to the job site and depending on the availability of hotel rooms, that can add an additional 30 minutes or more. At the end of the last job of the day, the crews are required to clean up the job site, properly store all equipment and tools, eat a meal after performing physical labor all day in situations where the personal safety is continually at risk and often in unforgiving conditions; and drive back to the hotel rooms, which again, could be 30 minutes or more away from the jobsite. Therefore, intervals of time at the start and end of the work shift and between restoration “events” is an expected and necessary part of the work shift, for which the crews are paid. Within a work shift, the crews do not get paid differently for different types of work. Therefore, from a field perspective, the start and stop time is the critical data point for the timesheet.
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.