Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

Files6

Search terms highlighted
Eversource rate increase is on 10 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match

Text of OCC Set 15_COMBINED.pdf

Extracted from the file · 31 pages · 65,747 characters

Words on different pages
  1. Page 12 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-717 Page 2 of 2 Importantly, the crews are in “working” status for the entire duration of their shift – from start to finish. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet. b. Please refer to subpart (a), above. Further, all contractor crews and non-Connecticut based Company employees working storm restoration in Connecticut are required to be lodged in hotel rooms. Prior to beginning their first job of the day, the crews eat a meal, conduct safety briefings, perform U.S. Department of Transportation mandated pre-trip inspections on their trucks, and restock their trucks as necessary with material needed for their day. This takes time and the crews are methodical because they don’t want to get out into the field without the right equipment or materials. The crews start the work shift by driving from their hotel rooms to the job site and depending on the availability of hotel rooms, that can add an additional 30 minutes or more. At the end of their last job of the day, the crews are required to clean up their job site, properly store all equipment and tools, eat a meal after performing physical labor all day in situations where their personal safety is continually at risk and often in unforgiving conditions; and drive back to their hotel rooms, which again, could be 30 minutes or more away from the jobsite. Therefore, intervals of time at the start and end of the work shift and between restoration “events” is an expected and necessary part of the work shift, for which the crews are paid. Within a work shift, the crews do not get paid differently for different types of work. Therefore, from a field perspective, the start and stop time is the critical datapoint for the timesheet. c. Please refer to subparts (a and b) above.
  2. Page 13 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-718 Page 1 of 1 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-02) (MS24E), p. 173-198. Much of the work on these invoices was performed more than a week after MS24E and later. Please explain how the Company verified all of the work was attributable to MS24E and not to another event. Response: Please refer to Exhibit ACCT-2 (CLP-5)( MS24E), Outside Line Contractors, at Line 117, Elite Flaggers LLC, in the amount of $750. While the full invoice was included in Exhibit ACCT-2 (CLP-5A-02), only pages 181, and 182, contain charges related to flagging work performed for the MS24E event. These services were completed on March 11 and March 12, 2024, and are identified in the invoice as work associated with MS24E.
  3. Page 14 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-719 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03) (MS24E), p. 8. Box 12 indicates 10 hours of work but boxes 24 and 25 tally to 9 hours of work (from 6:30 to 15:30). Please explain the discrepancy. Response: Based on the Company’s review of the specified timesheets, there is no significant missing information within the “Work Distribution” section. The timesheets are not a contemporaneous record of every minute, task, or discrete activity undertaken by a crew in the course of performing its work. Nor is the timesheet the method by which the Company manages the crews or assures that the crew is working how and where they are supposed to be. The timesheets are used to document the time worked and general nature of the work performed. Timesheets are typically completed at the end of each workday, with time allotted to the major work assignments completed that day. Given the nature of storm restoration work, it would be impractical and inconsistent with the crews’ primary responsibility of safely and efficiently restoring electric service to require personnel to contemporaneously record every minute task or discrete activity performed throughout the workday. The Company manages the crews through the oversight of the employee dispatching the crews and the External Field Resource Coordinator (EFRC), who is physically in the field with the crews, ensuring that the crews are properly engaged and assigned work to restore the system from storm damage. The linemen who are filling out the timesheets are primarily focused on ensuring that their crews are working safely in a dynamic environment that is full of potentially lethal hazards. The EFRC is the Company representative that is responsible for signing the timesheets and they have personal knowledge of the work that the crews have performed and the activities they have engaged in, particularly in relation to the hours stated in boxes 24 and 25. Importantly, the crews are in “working” status for the entire duration of their shift – from start to finish. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and Eversource - Internal Use
  4. Page 15 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-719 Page 2 of 2 neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet. Eversource - Internal Use
  5. Page 16 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-720 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03) (MS24E), p. 9. Box 12 indicates 7 hours of work by boxes 24 and 25 tall only 5 hours 27 minutes work maximum (all entries start at 1500 to and the latest ends at 2027). Please explain the discrepancy. Response: Based on the Company’s review of the specified timesheets, there is no significant missing information within the “Work Distribution” section. The timesheets are not a contemporaneous record of every minute, task, or discrete activity undertaken by a crew in the course of performing its work . Nor is the timesheet the method by which the Company manages the crews or assures that the crew is working how and where they are supposed to be. The timesheets are used to document the time worked and general nature of the work performed. Timesheets are typically completed at the end of each workday, with time allotted to the major work assignments completed that day. . Given the nature of storm restoration work, it would be impractical and inconsistent with the crews’ primary responsibility of safely and efficiently restoring electric service to require personnel to contemporaneously record every minute task or discrete activity performed throughout the workday. The Company manages the crews through the oversight of the employee dispatching the crews and the External Field Resource Coordinator (EFRC), who is physically in the field with the crews, ensuring that the crews are properly engaged and assigned work to restore the system from storm damage. The linemen who are filling out the timesheets are primarily focused on ensuring that their crews are working safely in a dynamic environment that is full of potentially lethal hazards. The EFRC is the Company representative that is responsible for signing the timesheets and they have personal knowledge of the work that the crews have performed and the activities they have engaged in, particularly in relation to the hours stated in boxes 24 and 25. Importantly, the crews are in “working” status for the entire duration of their shift – from start to finish. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and
  6. Page 17 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-720 Page 2 of 2 neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet.
  7. Page 18 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-721 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03) (MS24E), p.10. The last two entries in box 23 state, “”on hold until released” and “travel to show up clean park trucks.” a. At what location was the crew “on hold”? b. To where did the crew travel in the last entry? Response: a. After this crew completed the final ticket at 14 Topstone Dr, Bethel, CT 06801, the Company instructed them to hold and wait for further instructions. b. The crew’s initial AWC report was the Norwalk AWC located at 9 Tindall Ave, Norwalk CT, 06851.
  8. Page 19 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-722 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03) (MS24E), p.26-27. The storm codes have been written over, but appear to have originally indicated the work was associated with MN24F. Please explain how the Company verified that the work should have been associated with MS24E and provide all supporting substantiation. Response: The storm code was corrected from MN24F to MS24E after the Company reviewed the crew's work assignment and determined that the work was performed in support of the MS24E restoration effort. The original entry was a tree crew personnel error. The Company Arborist verifies the correction using their personal crew assignment, scheduling, and operational knowledge, which confirmed the work was associated with MS24E. The revised timesheet reflects this correction and aligns the record with the appropriate storm event. The Company Arborist’s signature is the verification the work was billed correctly.
  9. Page 20 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-723 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03) (MS24E), p.32-37. 41-43, 50-55. These invoices indicated the work was for MN24E. Please explain how the Company verified that the work should have been associated with MS24E rather than MN24F and provide all supporting substantiation. Response: The Company was able to verify the work is associated with MS24E based on the dates and shifts of the crews worked. MN24E took place earlier in the month on March 6th, 2024, and MN24F started on March 9th, 2024. These invoices correspond to the start of the March 11th, 2024, event MS24E. These timesheets are for active storm response, so the work dates directly tied to the storm number.
  10. Page 21 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-724 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03) (MS24E), p.38-40. The storm codes have been written over, but originally indicated the work was attributable to MN24E. Further, the correction on page 39 attributes the work to MS24D01. Please explain how the Company verified that the work should have been associated with MS24E and provide all supporting substantiation. Response: The Company Arborist was able to verify that the work should have been associated with storm code MS24E based on the dates the work was performed and the shifts worked by the crews operating under the Arborist's direction and supervision. The Arborist determines the appropriate storm code using Company storm event assignments, restoration communications, work scheduling records, crew assignment information, and the dates on which the work was completed. During storm response, crews and field personnel are assigned to a specific storm event, and all associated work is charged to the storm code designated by the Company. If a storm code discrepancy is identified, the Arborist or supervisor reviews the work dates, crew assignments, and storm event information and updates the invoice to reflect the correct storm code. In this instance, the Arborist reviewed the relevant records, confirmed that MS24E was the appropriate storm designation while reviewing the invoice, and signed the corrected invoice to document that determination.

Text of OCC Set 18_COMBINED.pdf

Extracted from the file · 24 pages · 49,328 characters

As listed on the current system

Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.