Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Text of OCC Set 15_COMBINED.pdf
Extracted from the file · 31 pages · 65,747 characters
Page 23 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-726 Page 1 of 1 Date Filed: September 28, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-03) (MS24E), p. 47-49. Page 47 attributes the work to MN24F and it is unclear if page 48 attributes the work to MN24F or MN24E. Please explain how the Company verified that the work should have been associated with MS24E and provide all supporting substantiation. Response: From March 6 through March 13, 2024, the Company completed three separate storm restoration events (MN24E, MN24F, and MS24E). The vendor originally included two separate storm events on the timesheet (MN24F and MS24E), but the vendor employee mis-wrote MS24E as MN24E, due to human error and close proximity of the storm events. The work associated with MN24F was removed from the timesheet and invoice and billed under a separate invoice; however, the note indicated in Exhibit ACCT-2 (CLP-5A-03) (MS24E), page 47 (i.e. 204889 MURRALES MN24F011), remained and was not removed. The Arborist approved the timesheet after the corrections and correctly charged it to the MS24E event.Page 24 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-727 Page 1 of 1 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-03) (MS24E), p. 69-71. The invoices indicate only “SAWC” and “Darien Yard.” Please clarify if this crew was on standby throughout 3/11 and 3/12. Response: This individual referred to in Exhibit ACCT-2 (CLP-5A-03) (MS24E), pages 69-71, is providing contractor tree crew supervision and dispatching to support storm restoration. The contractor's supervisory personnel do not maintain records of specific crew dispatch locations during storm events because they are not personally responding to each work site. Their role is to supervise operations and dispatch the tree crews performing the work to locations identified through the Company's restoration process.Page 25 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-728 Page 1 of 1 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (ACOSS) Refer to Exh. CLP-ACOS-1, regarding the Minimum System Study. a. In a live, unlocked Excel format with all links and formulas intact, please provide the Company’s Minimum System Study and all underlying workpapers and data. b. What is the kW or kVA capacity of the minimum size equipment the Company used for each FERC account? Response: a. For a working Excel copy of the Company’s Minimum System Study, please refer to OCC728, Attachment 1, for Account 364; OCC-728, Attachment 2, for Account 365; OCC-728, Attachment 3, for Account 366/367; and OCC-728, Attachment 4, for Account 368. b. Please refer to the following table for the requested information: Load Carrying Minimum Size Capability Primary 40' Class 2 Pole N/A 364 Secondary 35' Class 2 Pole N/A Primary 1/0 175mil ACSR AL conductor, separate 220 A neutral 365 Secondary 1/0 TPX Overhead 195 A Primary #1 AL Primary UG (Neutral bundled in Cable) 155 A 366/367 Secondary 4/0 3CT UG Secondary (Neutral bundled in 240 A Cable) Overhead 1 PH 25 kV Overhead Transformer 41 A per leg (low side) 368 Undergrou 1 PH 25 kV Overhead Transformer 41 A per leg (low side) nd AccountPage 26 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-729 Page 1 of 3 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (ACOSS) Refer to Exh. CLP-ACOS-1, Exh. CLP-ACOS-2, and Exh. CLP-RATES-1. In a live, unlocked Excel format with all links and formulas intact, please provide an alternate version of the ACOSS and of Table 1 under Exh. CLP-RATES-1, for each of the following scenarios: a. In which FERC Accounts 364-368 are classified as 100% demand-related; b. In which the primary distribution portion of FERC Accounts 364-368 are classified as 100% demand-related. Response: These scenarios conflict with, and do not reflect the use of, well-established methodologies that have been applied by the Company and approved by PURA. In response to this request, the Company is providing the results of the allocations requested under each scenario, and further has replicated the process in developing Table 1 in its Application to prepare an illustrative Table 1 for each scenario. The Company does not support or endorse these cost analyses or tables provided in response to parts a. or b. a. Please refer to OCC-729, Attachment 1 CONFIDENTIAL, for the modified ACOS study with FERC Accounts 364-368 classified as 100% demand-related. The resulting unit costs are included in tab T.0 Summary Unit Costs.Page 27 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-729 Page 2 of 3 Below is an illustrative Table 1 for this scenario: Table 1: Rates of Return at Current and Proposed Rates Rate Codes Rate 1 & 7 Rate 5 Rate 18 Rate 27, 27A, 30, 30A & EV-S Rate 29 Rate 35, 37 & EV-M Rate 39 Rate 40 Rate 41 Rate 55 Rate 56 & EV-L Rate 57 Rate 58 Rate 115 Rate 116 & 117 Rate 119 Total Current Rates Rate of Return Class to Total 1.2% 1.1 -0.3% -0.3 -12.4% -11.8 3.8% 3.6 -5.6% -5.3 0.9% 0.8 -4.4% -4.2 3.7% 3.5 1.9% 1.8 -1.2% -1.1 -0.1% -0.1 -2.2% -2.1 -1.1% -1.0 0.4% 0.4 -5.6% -5.3 145.0% 137.8 1.05% 1.0 Proposed Rates Rate of Return Class to Total 7.9% 1.0 6.7% 0.9 2.1% 0.3 10.6% 1.4 0.3% 0.0 7.8% 1.0 0.5% 0.1 10.5% 1.4 8.7% 1.1 5.1% 0.7 5.6% 0.7 4.0% 0.5 4.7% 0.6 6.1% 0.8 0.6% 0.1 147.2% 19.0 7.74% 1.0 b. Please refer to OCC-729, Attachment 2 CONFIDENTIAL, for the modified ACOS study with the primary distribution portion of FERC accounts 364-368 classified as 100% demand-related. The resulting unit costs are included in tab T.0 Summary Unit Costs.Page 28 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-729 Page 3 of 3 Below is an illustrative Table 1 for this scenario: Table 1: Rates of Return at Current and Proposed Rates Rate Codes Rate 1 & 7 Rate 5 Rate 18 Rate 27, 27A, 30, 30A & EV-S Rate 29 Rate 35, 37 & EV-M Rate 39 Rate 40 Rate 41 Rate 55 Rate 56 & EV-L Rate 57 Rate 58 Rate 115 Rate 116 & 117 Rate 119 Total Current Rates Rate of Return Class to Total 0.9% 0.9 -0.3% -0.2 -12.3% -11.7 4.2% 4.0 -5.4% -5.1 1.4% 1.3 -4.4% -4.2 4.2% 4.0 2.5% 2.3 -1.0% -0.9 0.3% 0.3 -2.1% -2.0 -0.8% -0.8 0.1% 0.1 -5.7% -5.4 145.0% 137.8 1.05% 1.0 Proposed Rates Rate of Return Class to Total 7.8% 1.0 6.8% 0.9 1.2% 0.2 10.8% 1.4 0.8% 0.1 7.9% 1.0 0.6% 0.1 10.7% 1.4 9.0% 1.2 5.4% 0.7 4.2% 0.5 4.2% 0.5 5.1% 0.7 5.6% 0.7 0.5% 0.1 147.2% 19.0 7.74% 1.0Page 29 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-730 Page 1 of 1 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (ACOSS) Refer to Exh. CLP-ACOS-2. Using the most granular data available, please provide the following statistics for individual customer maximum demand for each customer class: a. Minimum annual customer demand for the class b. 25th percentile annual customer demand for the class c. 50th percentile annual customer demand for the class d. 75th percentile annual customer demand for the class e. Maximum annual customer demand for the class Response: The approximate minimum, 25th percentile, 50th percentile, 75th percentile, and maximum demand for each rate class is shown in the table below. The kilowatt demand values presented in the table below are derived from a sample of monthly customer billing records for Test Year 2025. Customer Demand (KW) Minimum 25th Percentile 50th Percentile 75th Percentile Maximum Rate Class Rate 27 Rate 27A Rate 30 Rate 30A Rate 35 Rate 37 Rate 41 Rate 55 Rate 56 Rate 57 Rate 58 Rate EV-S 0.0 0.0 50.0 0.0 0.1 0.0 0.0 0.0 0.0 12.6 7.2 0.0 31.0 26.8 57.4 8.5 52.4 98.6 147.1 334.1 280.3 1003.3 841.0 6.8 88.1 88.4 68.4 15.3 80.8 148.6 215.6 408.2 359.8 1198.6 1158.1 10.3 148.5 152.7 88.4 29.4 108.9 197.8 309.3 531.7 464.6 1612.8 1662.3 20.7 347.8 379.3 1370.9 197.3 283.8 411.8 774.1 988.6 1030.3 13162.8 13296.0 101.7 Rate EV-M 0.5 100.0 116.7 147.4 341.8 Rate EV-L 134.4 436.0 528.5 645.8 1301.8Page 30 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-731 Page 1 of 1 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (ACOSS) Refer to Exh. CLP-ACOS-1. Please confirm that residential customers do not receive service at primary voltages. Response: This is confirmed. Residential customers who receive service under Rates 1, 5 or 7 are secondary voltage customers and do not receive service at primary voltage.Page 31 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-732 Page 1 of 1 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (ACOSS) Refer to Exh. CLP-ACOS-1. Does the Company have the data needed to calculate customer-related unit costs separately for multi-family and single-family customers? If so, please provide the data and calculation in a live, unlocked Excel format with all formulas intact, including a breakdown of the costs by FERC account. If not, please specify what additional data would be necessary to perform the calculation. Response: The Company does not have the data to separately calculate customer-related unit costs for single vs multi-family customers.Page 32 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-733 Page 1 of 2 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (MCOSS) Refer to Exh. CLP-MCOS-1, at 17-18. In a live, unlocked Excel format with all links and formulas intact, please provide the Company’s probability of peak analysis and all underlying workpapers and data. Response: The Company’s probability of peak analysis was performed with Python and therefore a workpaper is not available for computation of the probability of peak (PoP) analysis. However, the input data used in the Python code is included in OCC-733, Attachment 1. Additionally, an explanation of the main steps followed in calculating the PoP in Python is provided below. 1. The sum of historical hourly Substation Loads from January 2022, to December 2025 across all the distribution substations provided by the Company were grouped by hour type, where each hour defined by month, hour beginning, and weekday vs. weekend/holiday. 2. For each historical year, each hourly load was divided by the average hourly load in that same year. This allows filtering out year-to-year customer growth impacts on load for comparable analyses across years. A delimiter based on the average of the four historical year ratios (for 2022-2025) of the maximum hourly load in the year to the same year’s average hourly load was calculated. This ratio is used later in the analysis to determine a simulated hour’s weight in the PoP calculation. 3. For each hour by day type and month, a Kernel Density Estimation was used to create representative distributions of future gross hourly distribution substation loads, which back into the PV impacts. In particular, the model simulated hourly load distributions 500 times using a truncated version of Gaussian Kernel density estimation (KDE). KDE with a gaussian kernel is a non-parametric method that forms a small probability density function (PDF). The final distribution for a given hour is obtained from adding the sum of these point-based PDFs. 4. To factor in the expected impact of BTM PV generation on near-term load profiles, the analysis considers the cumulative forecasted additions of BTM PV capacity in
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.