Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Text of OCC Set 15_COMBINED.pdf
Extracted from the file · 31 pages · 65,747 characters
Page 26 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-729 Page 1 of 3 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (ACOSS) Refer to Exh. CLP-ACOS-1, Exh. CLP-ACOS-2, and Exh. CLP-RATES-1. In a live, unlocked Excel format with all links and formulas intact, please provide an alternate version of the ACOSS and of Table 1 under Exh. CLP-RATES-1, for each of the following scenarios: a. In which FERC Accounts 364-368 are classified as 100% demand-related; b. In which the primary distribution portion of FERC Accounts 364-368 are classified as 100% demand-related. Response: These scenarios conflict with, and do not reflect the use of, well-established methodologies that have been applied by the Company and approved by PURA. In response to this request, the Company is providing the results of the allocations requested under each scenario, and further has replicated the process in developing Table 1 in its Application to prepare an illustrative Table 1 for each scenario. The Company does not support or endorse these cost analyses or tables provided in response to parts a. or b. a. Please refer to OCC-729, Attachment 1 CONFIDENTIAL, for the modified ACOS study with FERC Accounts 364-368 classified as 100% demand-related. The resulting unit costs are included in tab T.0 Summary Unit Costs.Page 27 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-729 Page 2 of 3 Below is an illustrative Table 1 for this scenario: Table 1: Rates of Return at Current and Proposed Rates Rate Codes Rate 1 & 7 Rate 5 Rate 18 Rate 27, 27A, 30, 30A & EV-S Rate 29 Rate 35, 37 & EV-M Rate 39 Rate 40 Rate 41 Rate 55 Rate 56 & EV-L Rate 57 Rate 58 Rate 115 Rate 116 & 117 Rate 119 Total Current Rates Rate of Return Class to Total 1.2% 1.1 -0.3% -0.3 -12.4% -11.8 3.8% 3.6 -5.6% -5.3 0.9% 0.8 -4.4% -4.2 3.7% 3.5 1.9% 1.8 -1.2% -1.1 -0.1% -0.1 -2.2% -2.1 -1.1% -1.0 0.4% 0.4 -5.6% -5.3 145.0% 137.8 1.05% 1.0 Proposed Rates Rate of Return Class to Total 7.9% 1.0 6.7% 0.9 2.1% 0.3 10.6% 1.4 0.3% 0.0 7.8% 1.0 0.5% 0.1 10.5% 1.4 8.7% 1.1 5.1% 0.7 5.6% 0.7 4.0% 0.5 4.7% 0.6 6.1% 0.8 0.6% 0.1 147.2% 19.0 7.74% 1.0 b. Please refer to OCC-729, Attachment 2 CONFIDENTIAL, for the modified ACOS study with the primary distribution portion of FERC accounts 364-368 classified as 100% demand-related. The resulting unit costs are included in tab T.0 Summary Unit Costs.Page 28 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-729 Page 3 of 3 Below is an illustrative Table 1 for this scenario: Table 1: Rates of Return at Current and Proposed Rates Rate Codes Rate 1 & 7 Rate 5 Rate 18 Rate 27, 27A, 30, 30A & EV-S Rate 29 Rate 35, 37 & EV-M Rate 39 Rate 40 Rate 41 Rate 55 Rate 56 & EV-L Rate 57 Rate 58 Rate 115 Rate 116 & 117 Rate 119 Total Current Rates Rate of Return Class to Total 0.9% 0.9 -0.3% -0.2 -12.3% -11.7 4.2% 4.0 -5.4% -5.1 1.4% 1.3 -4.4% -4.2 4.2% 4.0 2.5% 2.3 -1.0% -0.9 0.3% 0.3 -2.1% -2.0 -0.8% -0.8 0.1% 0.1 -5.7% -5.4 145.0% 137.8 1.05% 1.0 Proposed Rates Rate of Return Class to Total 7.8% 1.0 6.8% 0.9 1.2% 0.2 10.8% 1.4 0.8% 0.1 7.9% 1.0 0.6% 0.1 10.7% 1.4 9.0% 1.2 5.4% 0.7 4.2% 0.5 4.2% 0.5 5.1% 0.7 5.6% 0.7 0.5% 0.1 147.2% 19.0 7.74% 1.0Page 29 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-730 Page 1 of 1 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (ACOSS) Refer to Exh. CLP-ACOS-2. Using the most granular data available, please provide the following statistics for individual customer maximum demand for each customer class: a. Minimum annual customer demand for the class b. 25th percentile annual customer demand for the class c. 50th percentile annual customer demand for the class d. 75th percentile annual customer demand for the class e. Maximum annual customer demand for the class Response: The approximate minimum, 25th percentile, 50th percentile, 75th percentile, and maximum demand for each rate class is shown in the table below. The kilowatt demand values presented in the table below are derived from a sample of monthly customer billing records for Test Year 2025. Customer Demand (KW) Minimum 25th Percentile 50th Percentile 75th Percentile Maximum Rate Class Rate 27 Rate 27A Rate 30 Rate 30A Rate 35 Rate 37 Rate 41 Rate 55 Rate 56 Rate 57 Rate 58 Rate EV-S 0.0 0.0 50.0 0.0 0.1 0.0 0.0 0.0 0.0 12.6 7.2 0.0 31.0 26.8 57.4 8.5 52.4 98.6 147.1 334.1 280.3 1003.3 841.0 6.8 88.1 88.4 68.4 15.3 80.8 148.6 215.6 408.2 359.8 1198.6 1158.1 10.3 148.5 152.7 88.4 29.4 108.9 197.8 309.3 531.7 464.6 1612.8 1662.3 20.7 347.8 379.3 1370.9 197.3 283.8 411.8 774.1 988.6 1030.3 13162.8 13296.0 101.7 Rate EV-M 0.5 100.0 116.7 147.4 341.8 Rate EV-L 134.4 436.0 528.5 645.8 1301.8Page 30 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-731 Page 1 of 1 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (ACOSS) Refer to Exh. CLP-ACOS-1. Please confirm that residential customers do not receive service at primary voltages. Response: This is confirmed. Residential customers who receive service under Rates 1, 5 or 7 are secondary voltage customers and do not receive service at primary voltage.Page 31 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-732 Page 1 of 1 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (ACOSS) Refer to Exh. CLP-ACOS-1. Does the Company have the data needed to calculate customer-related unit costs separately for multi-family and single-family customers? If so, please provide the data and calculation in a live, unlocked Excel format with all formulas intact, including a breakdown of the costs by FERC account. If not, please specify what additional data would be necessary to perform the calculation. Response: The Company does not have the data to separately calculate customer-related unit costs for single vs multi-family customers.Page 32 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-733 Page 1 of 2 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (MCOSS) Refer to Exh. CLP-MCOS-1, at 17-18. In a live, unlocked Excel format with all links and formulas intact, please provide the Company’s probability of peak analysis and all underlying workpapers and data. Response: The Company’s probability of peak analysis was performed with Python and therefore a workpaper is not available for computation of the probability of peak (PoP) analysis. However, the input data used in the Python code is included in OCC-733, Attachment 1. Additionally, an explanation of the main steps followed in calculating the PoP in Python is provided below. 1. The sum of historical hourly Substation Loads from January 2022, to December 2025 across all the distribution substations provided by the Company were grouped by hour type, where each hour defined by month, hour beginning, and weekday vs. weekend/holiday. 2. For each historical year, each hourly load was divided by the average hourly load in that same year. This allows filtering out year-to-year customer growth impacts on load for comparable analyses across years. A delimiter based on the average of the four historical year ratios (for 2022-2025) of the maximum hourly load in the year to the same year’s average hourly load was calculated. This ratio is used later in the analysis to determine a simulated hour’s weight in the PoP calculation. 3. For each hour by day type and month, a Kernel Density Estimation was used to create representative distributions of future gross hourly distribution substation loads, which back into the PV impacts. In particular, the model simulated hourly load distributions 500 times using a truncated version of Gaussian Kernel density estimation (KDE). KDE with a gaussian kernel is a non-parametric method that forms a small probability density function (PDF). The final distribution for a given hour is obtained from adding the sum of these point-based PDFs. 4. To factor in the expected impact of BTM PV generation on near-term load profiles, the analysis considers the cumulative forecasted additions of BTM PV capacity inPage 33 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-733 Page 2 of 2 Eversource’s CT service area (based on ISO-NE projections through the mid-point of the period 2026 through 2031). Capacity factors from NREL’s National Solar Radiation Database (NSRD) are then applied to annual BTM PV capacity forecasts to yield hourly PV generation projections. The hourly PV data for each hour type is then subtracted from the simulated hourly gross loads to yield hourly distribution net loads. 5. For a given hour and day type, any hour in the simulation with a load > delimeter calculated in step 2 is given a weight of 1 for PoP; other hours are given a weight of zero. The percent of hours of a given type with loads at or above the delimiter across the simulations provides a vector of hourly probabilities for each month. These hourly probabilities are divided by the sum of the probabilities across all hours such that they add up to 1. The resulting PoPs are stated by hour, day type and month.Page 34 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-734 Page 1 of 1 Date Filed: September 28, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (Residential Customer Charge) Refer to Exh. CLP-RATES-2.13, and Exhibit CLP-RATES-1, at 17, which states “The Company completed the MRCC calculation, as provided in Exhibit CLPRATES-2 2.13. This calculation produced a customer charge of $12.36 for Rate 1.” Please explain why the value of $12.36 differs from the value of $11.09, as shown in row 65 of tab “Exh 2.13, 1 of 19.” Response: Please refer to OCC-735, Attachment 1, for an updated version of the MRCC Exhibit shown in CLP-RATES-2.13. In preparing this response, the Company discovered that when formatting the original document for filing purposes, one of the inputs to the calculation shown on page 12 of 19 was inadvertently deleted. The full corrected detail of the calculation of Current Income Tax is provided in OCC735, Attachment 1, where the calculation begins on Line 18, with Total Gross Plant in Service in the amount of $577,005.Page 35 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-735 Page 1 of 1 Date Filed: September 28, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (Residential Customer Charge) Refer to Exh. CLP-RATES-2.13, tab “Exh 2.13, 12 of 19” row 44. Refer also to Exh. CLP-RATES-2.13, tab “Exh 2.13, 1 of 19” row 65. Please explain why the total values on these rows differ. Response: The two values cited should be the same. In preparing the response to this data request, the Company identified three corrections that need to be made in the MRCC Exhibit shown in CLPRATES-2.13: 1. In preparing this response, the Company discovered that when formatting the original document for filing purposes, one of the inputs to the Current Income Tax calculation shown on Page 12 of 19 was inadvertently deleted. The calculation should begin on Line 18 with Total Gross Plant in Service in the amount of $577,005. The omission of this figure reduced the following figures now shown on Page 1 of 19: Current Income Taxes (Line 61), Gross Receipts Tax (Line 62), Total Taxes (Line 64) and the total MRCC (Line 66). 2. The Total Accumulated Depreciation shown on Page 12 of 19 should have been a negative value in the calculation. This change reduces the Total Rate Base. 3. Page 1 of 19 omitted Account 935 in the amount of $4,000. The impact to the MRCC charge is small ($0.00031 per month), however, for the revenue requirement shown on Page 1 to match the revenue requirement shown on Page 12, it must be included. The result of the changes detailed above reduces the calculated MRCC to $11.62 per month from the $12.36 per month figure shown in the Company’s initial filing. Please refer to OCC-735, Attachment 1, for an updated version of the MRCC Exhibit shown in CLP-RATES-2.13.
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.