Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

Files6

Search terms highlighted
Eversource rate increase is on 10 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match

Text of OCC Set 15_COMBINED.pdf

Extracted from the file · 31 pages · 65,747 characters

Text of OCC Set 17_COMBINED.pdf

Extracted from the file · 45 pages · 69,741 characters

Words on different pages
  1. Page 10 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-743 Page 4 of 4 As described in the response to OCC-747, “[t]he Company is currently investigating the technical feasibility, costs, and benefits of an AMI-informed DMS model, including the benefits for voltage optimization. Issues of data latency will be included in this investigation.”
  2. Page 11 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-744 Page 1 of 1 Date Filed: September 28, 2026 Witness: Jared A. Lawrence Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 16-17, “Company concluded that a hybrid approach, utilizing a private wireless “mesh” network coupled with public carrier cellular networks, is the most effective technology for its electric AMI telecommunications network needs”. a. Please describe how the Company intends to use the mesh network vs. public carrier cellular networks including the following: i. Please confirm that public carrier cellular networks will be used to backhaul AMI data to the head end and meter data management system. If so, please describe the interval at which AMI data will be backhauled and the latency of the data transfer. Response: The AMI network uses a combination of mesh network technology and public cellular carriers to create the backhaul path. AMI meters form a mesh network where each meter can relay data for other meters, cost-effectively extending coverage and improving reliability. This mesh provides the local area network for AMI data backhaul. Access Points (APs) are AMI network devices that utilize the mesh network and public cellular carriers. APs aggregate and route traffic between AMI meters and the AMI head-end system using public cellular carriers. Public cellular carriers provide wide area network coverage. AMI meter data is backhauled every 15 minutes. Data latency from a customer’s meter to the head-end system averages less than 10 seconds in the Massachusetts AMI system.
  3. Page 12 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-745 Page 1 of 3 Date Filed: September 28, 2026 Witness: Jared A. Lawrence, Lavelle A. Freeman and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 8, “Figure 1 – Components of AMI Technology”. a. Please describe how the Company intends to leverage AMI to support distribution planning and operations including the following: i. Please describe whether the Company intends to leverage AMI to support the development of 8760 profiles at the substation, circuit and nodal level. ii. Please describe how the Company intends to use AMI to support real-time operations including the latency at which operational systems such as ADMS and DERMS will receive this data? Response: i. The Company intends to leverage AMI to substantially enhance its ongoing efforts to forecast demand at a granular, customer level. The Company has already begun developing customer-level technology adoption propensity models to project the penetration of EVs, heat pumps, and solar across its service territory. Presently, these efforts rely on thirdparty data and assumed load profiles in Connecticut, because the Company lacks observed data on adoption and usage for these customers. AMI would provide the Company with ground-truth data that is more reflective of the CL&P-specific customer base and service territory, thus meaningfully improving the accuracy of near-term forecasts and the Company's confidence in long-term forecasts. AMI would improve upon two specific limitations in the Company's current forecasting capability relevant to distribution planning. First, the Company is presently unable to determine, with a high degree of confidence, which individual customers have already adopted technologies such as EVs or heat pumps. Adoption is inferred through propensity modeling informed by third-party data sources rather than observed directly. AMI interval data would allow the Company to detect the load associated with these technologies at the individual meter, enabling adoption to be identified and validated against the Company's own aggregated system data. This presentday adoption would then be used to forecast future adoption with more accuracy than derived using present-day adoption data.
  4. Page 13 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-745 Page 2 of 3 Second, while the Company has SCADA telemetry, the Company currently has limited data on how these technologies affect granular load curves at a customer level once adopted. Generic or third-party-derived profiles may not accurately reflect the climate, housing types, customer types, rate structures, and adoption patterns specific to the Company's Connecticut service territory. AMI interval data would enable the Company to derive its own localized technology-specific load shapes directly from observed customer usage, vastly improving the accuracy of the inputs used to translate adoption forecasts into load forecasts. Put simply, the Company's ability to forecast the future development of its system is inherently constrained by its limited visibility into the present state of that system, and AMI would directly address that limitation. With regard to the development of 8760 profiles, please refer to the Company’s response to OCC-575 i. ii. Exhibit CLP-AMI-2 at 8, “Figure 1 – Components of AMI Technology” is intended to show AMI systems and their relationships. The arrows between the head end and meter data management systems and the ADMS and DERMS real time systems are intended to show potential future integrations that are not included in the Company’s implementation plan. (Note that the integration with OMS is included in the implementation plan.) As described in the response to OCC-747 ii, “[t]he Company is currently investigating the technical feasibility, costs, and benefits of an AMI-informed DMS model, including the benefits for voltage optimization. Issues of data latency will be included in this investigation.” Prior Referenced Responses: i OCC-575 Question: Refer to Exhibit CLP-TSP-2 at 21-22, “Historical System Load Analysis.” a. Please describe the temporal granularity (i.e hourly etc.) of the historical loading information used to inform the Company’s load forecast and whether this varies depending on location and data availability. b. Please describe the percentage of substations and associated feeders with available 8760 hourly profiles. If some or all of the substations and associated feeders do not have 8760 hourly profiles, please describe whether and when the Company plans to have 8760 profiles available. OCC-575 Response: a. To create the substation peak forecast the Company relies on the peak hour values which are determined from 15 min SCADA data by substation and at the system level. b. Please refer to the Company’s response to information request OCC-587i. The Company currently does not create 8760 load forecast profiles. Where SCADA data is available1, the Company does have historical 8760 “as measured” data. The Company currently has no plans absent approval of requested resources as presented
  5. Page 14 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-745 Page 3 of 3 in the Exhibit CLP-TSP-3 at 138. Here, the Company has outlined a pathway to develop the resources needed for the full capabilities to provide 8760 data within 18 to 24 months. ii OCC-747 Question: Refer to Exhibit CLP-AMI-2 at 38, “Once the VVO control system can accept AMI voltage data directly, the Company will develop an integration between the VVO control system and the MDMS, allowing the VVO system to respond to voltage violations (below or above stated thresholds) automatically.” a. b. Please describe the latency at which the Company’s VVO control system will receive AMI data. Please describe how VVO will be coordinated with the DERMS demonstration on centralized voltage management. OCC-747 Response: a. As noted in CLP-AMI-2 at 38, the integration between the VVO control system and MDMS has not yet been developed. Accordingly, the latency at which the Company’s VVO system will receive AMI data has not yet been determined. The Company’s VVO control system will be an application known as load voltage management (“LVM”) within its distribution management system (“DMS”). The DMS is a real-time application, using real-time telemetry from substations and field devices to provide system operators with as-operated load flow tools. As AMI represents millions of data points, integration of real-time AMI telemetry into DMS/LVM is a technical challenge that will require significant design and testing. The Company expects the use of AMI data to support real-time VVO operations will occur in phases. As described in CLP-AMI-2 at 38, the first phase will be operational dashboards using recent (not real-time) AMI data to support assessments of VVO operations for the purpose of improving use of the DMS/LVM for voltage optimization. Second, AMI data will be used to improve the accuracy of load profiles used to inform DMS load allocation. This will increase the accuracy of the DMS load flow, which will improve the functionality of all DMS applications, including LVM. The third step would be the use of real-time AMI telemetry to inform the DMS model. The Company is currently investigating the technical feasibility, costs, and benefits of an AMI-informed DMS model, including the benefits for voltage optimization. Issues of data latency will be included in this investigation. b. The opportunity to include VVO in the DERMS demonstration (in coordination with the Grid Services Compensation Fund) focuses on the use of DERMS to operate advanced inverters from customer DER, including solar and battery energy storage, via the DERMS to support reactive power management. The objective would be to assess the technical feasibility, costs, and benefits of incorporating customer DER in the Company’s VVO operations, using the DMS/LVM tools described above, to test the hypothesis that use of existing DER to manage voltage will result in net cost savings for customers.
  6. Page 15 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-746 Page 1 of 1 Date Filed: September 28, 2026 Witness: Jared A. Lawrence, Lavelle A. Freeman, Juan F. Martinez and Steven C. Osuch Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 39, “The Company can potentially use this information to identify the locational value of DERs”. a. Please describe whether the Company has developed a methodology to determine the locational value of DERs and if so, please provide this methodology. b. Please provide a timeline for when locational value will be implemented. Response: The locational value of DER is dependent on their ability to defer or avoid infrastructure investments. Said differently, a DER developed on a portion of the distribution system with no constraints, full capacity to support all operations without limitations, and no such constraints within the forecast horizon does not provide any locational value. In this case, the only value is on the bulk system side, (for example to displace conventional generation); a benefit, however, that is not locationally bound. a. The Company uses a standard value of deferral methodology to determine the value of a DER at a specific location see the NWA process BCA Framework. 1 b. The locational value calculation for DER has been implemented first as part of the Company’s NWA Framework and more recently as part of the Authority’s NWA Process. https://www.eversource.com/docs/default-source/doing-business/appendix-13-nws-bca-referencemanual.pdf?sfvrsn=10469df6_2 1
  7. Page 16 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-747 Page 1 of 2 Date Filed: September 28, 2026 Witness: Jared A. Lawrence and Jennifer A. Schilling Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 38, “Once the VVO control system can accept AMI voltage data directly, the Company will develop an integration between the VVO control system and the MDMS, allowing the VVO system to respond to voltage violations (below or above stated thresholds) automatically.” a. Please describe the latency at which the Company’s VVO control system will receive AMI data. b. Please describe how VVO will be coordinated with the DERMS demonstration on centralized voltage management. Response: a. As noted in CLP-AMI-2 at 38, the integration between the VVO control system and MDMS has not yet been developed. Accordingly, the latency at which the Company’s VVO system will receive AMI data has not yet been determined. The Company’s VVO control system will be an application known as load voltage management (“LVM”) within its distribution management system (“DMS”). The DMS is a real-time application, using real-time telemetry from substations and field devices to provide system operators with as-operated load flow tools. As AMI represents millions of data points, integration of real-time AMI telemetry into DMS/LVM is a technical challenge that will require significant design and testing. The Company expects the use of AMI data to support real-time VVO operations will occur in phases. As described in CLP-AMI-2 at 38, the first phase will be operational dashboards using recent (not real-time) AMI data to support assessments of VVO operations for the purpose of improving use of the DMS/LVM for voltage optimization. Second, AMI data will be used to improve the accuracy of load profiles used to inform DMS load allocation. This will increase the accuracy of the DMS load flow, which will improve the functionality of all DMS applications, including LVM. The third step would be the use of real-time AMI telemetry to inform the DMS model. The Company is currently investigating the technical feasibility, costs, and benefits of an AMI-informed DMS model, including the benefits for voltage optimization. Issues of data latency will be included in this investigation.
  8. Page 17 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-747 Page 2 of 2 b. The opportunity to include VVO in the DERMS demonstration (in coordination with the Grid Services Compensation Fund) focuses on the use of DERMS to operate advanced inverters from customer DER, including solar and battery energy storage, via the DERMS to support reactive power management. The objective would be to assess the technical feasibility, costs, and benefits of incorporating customer DER in the Company’s VVO operations, using the DMS/LVM tools described above, to test the hypothesis that use of existing DER to manage voltage will result in net cost savings for customers.
  9. Page 18 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-748 Page 1 of 1 Date Filed: September 28, 2026 Witness: Jared A. Lawrence Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 49 “The Company also plans to run a high impedance detection for distribution intelligence pilot, which will leverage grid-edge data from AMI to identify potential high impedance fault conditions or abnormal system behavior”. a. Please describe what other distributed intelligence capabilities the Company intends to pilot and leverage for planning and operations. Response: Eversource has identified several distributed intelligence capabilities for evaluation which includes load disaggregation, and transformer monitoring. Eversource is currently conducting pilot programs within the Massachusetts program deployment. Load disaggregation provides EV awareness, which monitors consumption, and solar awareness, which monitors generation, in the form of pilot programs. These programs will enable the capability to identify behind the meter EV or solar, and can subsequently provide session data such as power generation, power consumption, peak power, and total power. Transformer monitoring enables real time voltage and load characteristics of distribution transformers. This is calculated instantly by the meters and electrically connected to the same transformer. These applications provide Eversource with granular data that can better understand how behind the meter solar and EV devices affect grid performance. Pending PURA approval, the technology that is currently available in Massachusetts would be available to benefit Connecticut customers.
  10. Page 19 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-749 Page 1 of 1 Date Filed: September 28, 2026 Witness: Jared A. Lawrence Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 16-17, “The latest generation AMI mesh networks enable powerful smart meters with enhanced processing and memory capabilities to run applications and securely share data among peer meters. These enhanced capabilities allow the meters to interpret the scope of a network outage, rapidly sample and interrogate voltage quality, and provide insight into the general health of the electric network. This new AMI architecture has enabled multiple new use cases and enhanced existing ones”. a. Please describe the latency of at which meters can securely share data among peer meters. b. Please describe the latency at which the Company can have insight into the general health of the electric network and respond if there are adverse conditions. c. Please describe what if any new use cases this AMI architecture enables beyond the described distributed intelligence capabilities. Response: a. Meters can communicate across the mesh network instantaneously, with transfer speeds for peer-to-peer communications that can go up to 600kbps. b. Outages or adverse events are detected by AMI meters instantaneously, and the frequency of detection is based on prioritization as dictated by the Company. Responses are managed in the same manner as received. c. At present, distributed intelligence architecture enables the use cases as described in CLPAMI-2. However, a benefit of the distributed intelligence architecture that is deployed as part of the Massachusetts AMI program is that future application development can enable new outcomes which includes the potential for use-cases that are not yet known but will be developed and evolve as meter technology changes. These applications can be deployed over-the-air, at scale quickly and do not require field visits.

As listed on the current system

Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

This filing on the current system (opens in a new tab)