Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Text of OCC Set 15_COMBINED.pdf
Extracted from the file · 31 pages · 65,747 characters
Text of OCC Set 17_COMBINED.pdf
Extracted from the file · 45 pages · 69,741 characters
Page 14 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-745 Page 3 of 3 in the Exhibit CLP-TSP-3 at 138. Here, the Company has outlined a pathway to develop the resources needed for the full capabilities to provide 8760 data within 18 to 24 months. ii OCC-747 Question: Refer to Exhibit CLP-AMI-2 at 38, “Once the VVO control system can accept AMI voltage data directly, the Company will develop an integration between the VVO control system and the MDMS, allowing the VVO system to respond to voltage violations (below or above stated thresholds) automatically.” a. b. Please describe the latency at which the Company’s VVO control system will receive AMI data. Please describe how VVO will be coordinated with the DERMS demonstration on centralized voltage management. OCC-747 Response: a. As noted in CLP-AMI-2 at 38, the integration between the VVO control system and MDMS has not yet been developed. Accordingly, the latency at which the Company’s VVO system will receive AMI data has not yet been determined. The Company’s VVO control system will be an application known as load voltage management (“LVM”) within its distribution management system (“DMS”). The DMS is a real-time application, using real-time telemetry from substations and field devices to provide system operators with as-operated load flow tools. As AMI represents millions of data points, integration of real-time AMI telemetry into DMS/LVM is a technical challenge that will require significant design and testing. The Company expects the use of AMI data to support real-time VVO operations will occur in phases. As described in CLP-AMI-2 at 38, the first phase will be operational dashboards using recent (not real-time) AMI data to support assessments of VVO operations for the purpose of improving use of the DMS/LVM for voltage optimization. Second, AMI data will be used to improve the accuracy of load profiles used to inform DMS load allocation. This will increase the accuracy of the DMS load flow, which will improve the functionality of all DMS applications, including LVM. The third step would be the use of real-time AMI telemetry to inform the DMS model. The Company is currently investigating the technical feasibility, costs, and benefits of an AMI-informed DMS model, including the benefits for voltage optimization. Issues of data latency will be included in this investigation. b. The opportunity to include VVO in the DERMS demonstration (in coordination with the Grid Services Compensation Fund) focuses on the use of DERMS to operate advanced inverters from customer DER, including solar and battery energy storage, via the DERMS to support reactive power management. The objective would be to assess the technical feasibility, costs, and benefits of incorporating customer DER in the Company’s VVO operations, using the DMS/LVM tools described above, to test the hypothesis that use of existing DER to manage voltage will result in net cost savings for customers.Page 15 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-746 Page 1 of 1 Date Filed: September 28, 2026 Witness: Jared A. Lawrence, Lavelle A. Freeman, Juan F. Martinez and Steven C. Osuch Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 39, “The Company can potentially use this information to identify the locational value of DERs”. a. Please describe whether the Company has developed a methodology to determine the locational value of DERs and if so, please provide this methodology. b. Please provide a timeline for when locational value will be implemented. Response: The locational value of DER is dependent on their ability to defer or avoid infrastructure investments. Said differently, a DER developed on a portion of the distribution system with no constraints, full capacity to support all operations without limitations, and no such constraints within the forecast horizon does not provide any locational value. In this case, the only value is on the bulk system side, (for example to displace conventional generation); a benefit, however, that is not locationally bound. a. The Company uses a standard value of deferral methodology to determine the value of a DER at a specific location see the NWA process BCA Framework. 1 b. The locational value calculation for DER has been implemented first as part of the Company’s NWA Framework and more recently as part of the Authority’s NWA Process. https://www.eversource.com/docs/default-source/doing-business/appendix-13-nws-bca-referencemanual.pdf?sfvrsn=10469df6_2 1Page 16 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-747 Page 1 of 2 Date Filed: September 28, 2026 Witness: Jared A. Lawrence and Jennifer A. Schilling Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 38, “Once the VVO control system can accept AMI voltage data directly, the Company will develop an integration between the VVO control system and the MDMS, allowing the VVO system to respond to voltage violations (below or above stated thresholds) automatically.” a. Please describe the latency at which the Company’s VVO control system will receive AMI data. b. Please describe how VVO will be coordinated with the DERMS demonstration on centralized voltage management. Response: a. As noted in CLP-AMI-2 at 38, the integration between the VVO control system and MDMS has not yet been developed. Accordingly, the latency at which the Company’s VVO system will receive AMI data has not yet been determined. The Company’s VVO control system will be an application known as load voltage management (“LVM”) within its distribution management system (“DMS”). The DMS is a real-time application, using real-time telemetry from substations and field devices to provide system operators with as-operated load flow tools. As AMI represents millions of data points, integration of real-time AMI telemetry into DMS/LVM is a technical challenge that will require significant design and testing. The Company expects the use of AMI data to support real-time VVO operations will occur in phases. As described in CLP-AMI-2 at 38, the first phase will be operational dashboards using recent (not real-time) AMI data to support assessments of VVO operations for the purpose of improving use of the DMS/LVM for voltage optimization. Second, AMI data will be used to improve the accuracy of load profiles used to inform DMS load allocation. This will increase the accuracy of the DMS load flow, which will improve the functionality of all DMS applications, including LVM. The third step would be the use of real-time AMI telemetry to inform the DMS model. The Company is currently investigating the technical feasibility, costs, and benefits of an AMI-informed DMS model, including the benefits for voltage optimization. Issues of data latency will be included in this investigation.Page 17 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-747 Page 2 of 2 b. The opportunity to include VVO in the DERMS demonstration (in coordination with the Grid Services Compensation Fund) focuses on the use of DERMS to operate advanced inverters from customer DER, including solar and battery energy storage, via the DERMS to support reactive power management. The objective would be to assess the technical feasibility, costs, and benefits of incorporating customer DER in the Company’s VVO operations, using the DMS/LVM tools described above, to test the hypothesis that use of existing DER to manage voltage will result in net cost savings for customers.Page 18 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-748 Page 1 of 1 Date Filed: September 28, 2026 Witness: Jared A. Lawrence Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 49 “The Company also plans to run a high impedance detection for distribution intelligence pilot, which will leverage grid-edge data from AMI to identify potential high impedance fault conditions or abnormal system behavior”. a. Please describe what other distributed intelligence capabilities the Company intends to pilot and leverage for planning and operations. Response: Eversource has identified several distributed intelligence capabilities for evaluation which includes load disaggregation, and transformer monitoring. Eversource is currently conducting pilot programs within the Massachusetts program deployment. Load disaggregation provides EV awareness, which monitors consumption, and solar awareness, which monitors generation, in the form of pilot programs. These programs will enable the capability to identify behind the meter EV or solar, and can subsequently provide session data such as power generation, power consumption, peak power, and total power. Transformer monitoring enables real time voltage and load characteristics of distribution transformers. This is calculated instantly by the meters and electrically connected to the same transformer. These applications provide Eversource with granular data that can better understand how behind the meter solar and EV devices affect grid performance. Pending PURA approval, the technology that is currently available in Massachusetts would be available to benefit Connecticut customers.Page 19 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-749 Page 1 of 1 Date Filed: September 28, 2026 Witness: Jared A. Lawrence Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 16-17, “The latest generation AMI mesh networks enable powerful smart meters with enhanced processing and memory capabilities to run applications and securely share data among peer meters. These enhanced capabilities allow the meters to interpret the scope of a network outage, rapidly sample and interrogate voltage quality, and provide insight into the general health of the electric network. This new AMI architecture has enabled multiple new use cases and enhanced existing ones”. a. Please describe the latency of at which meters can securely share data among peer meters. b. Please describe the latency at which the Company can have insight into the general health of the electric network and respond if there are adverse conditions. c. Please describe what if any new use cases this AMI architecture enables beyond the described distributed intelligence capabilities. Response: a. Meters can communicate across the mesh network instantaneously, with transfer speeds for peer-to-peer communications that can go up to 600kbps. b. Outages or adverse events are detected by AMI meters instantaneously, and the frequency of detection is based on prioritization as dictated by the Company. Responses are managed in the same manner as received. c. At present, distributed intelligence architecture enables the use cases as described in CLPAMI-2. However, a benefit of the distributed intelligence architecture that is deployed as part of the Massachusetts AMI program is that future application development can enable new outcomes which includes the potential for use-cases that are not yet known but will be developed and evolve as meter technology changes. These applications can be deployed over-the-air, at scale quickly and do not require field visits.Page 20 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-750 Page 1 of 1 Date Filed: September 28, 2026 Witness: Jared A. Lawrence Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 47, “Figure 12 – Proposed CT Meter Deployment Sequence”. a. Has the Company considered prioritizing the deployment of AMI in locations with DER and load constraints so that better data is available to inform solutions? Response: The hybrid mesh technology of the AMI Plan is best deployed by installing meters in concentrated locations and then expanding in adjacent areas, as doing so is the most cost-efficient path to overall stability and full benefits coverage. During its AMI rollout in MA, Eversource identified opportunities to prioritize areas with load constraints that could be accelerated without introducing costly inefficiencies to the deployment. Eversource expects that it would adopt a similarly agile approach for CL&P.Page 21 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-751 Page 1 of 3 Date Filed: September 28, 2026 Witness: Jared A. Lawrence, Edward A. Davis and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 5, “Time-varying rates rely on interval usage data, advanced billing system functionality, customer access to timely consumption information, and robust customer education and engagement programs. AMI provides the technological foundation necessary to support future time-varying rate offerings, including time-of-use, critical peak pricing, and other demand-responsive rate designs. However, these capabilities cannot be fully, equitably realized until AMI meters have been installed and activated for the majority of customers and the supporting data management, communications, and billing systems have been fully integrated and tested”. a. Please explain why TVR cannot be implemented upon commencement of AMI deployment similar to capabilities including power outage restoration, bulk data sharing, energy efficiency and demand management analytics. b. Please explain when the Company intends to develop and file proposals to implement time-ofuse, critical peak pricing, and other demand-responsive rate designs. Response: a. If PURA approves the Company’s proposal to leverage the MA technology platforms for CT, the capabilities will exist upon “go-live” of the foundational systems (CIS, MDMS) and the completion of the AMI network, subject to testing for the CT deployment. However, while the technical capabilities will exist at the start of the AMI meter deployment (subject to testing), the Company is proposing a timeline based on the equally important change management and customer education considerations for a successful TVR launch. Accordingly, the Company recommends the convening of an inclusive stakeholder process once AMI meter installation begins so that actual customer interval usage data can be used to evaluate TVR options and reach consensus conclusions on rate design and effective communications. Further, the Company’s AMI Implementation Plan includes the development of a Rate Comparison Tool that will help customers evaluate their TVR options based on customized analysis and recommendations, which will be reliable only after they amass sufficient interval usage data after receiving their meters. This will allow customers to fully understand their options and make informed selections of the TVR rate that best meets their individual goals. Not only does the Company’s proposed timeline allow for a more positive customer experience based on customizedPage 22 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-751 Page 2 of 3 TVR analyses and recommendations, it also ensures that all customers (who have not opted out off AMI) are eligible to enroll in TVR at the time the broad Marketing, Education and Outreach Plan enters the TVR rollout phase. b. As noted in OCC-422 i, the Company plans to file an opt-out TVR proposal by October 1, 2027, while additionally presenting the merits of an opt-in approach to TVR given the status of AMI implementation at that time. Additionally, as noted above, the Company recommends the convening of an inclusive stakeholder process once AMI meter installation begins so that actual customer interval usage data can be used to evaluate TVR options and reach consensus conclusions on rate design. Based on this recommended stakeholder process, the Company would then file an additional TVR rate proposal during the AMI meter installation period so that PURA approval would be obtained in time to educate customers and launch the rate(s) approximately one year after completion of AMI meter installation. Prior Referenced Response: i OCC-422 Question: Please refer to Exhibit CLP-Rates-1, p. 12, in which the Company states that it developed a time-varying rate (TVR) Outreach, Education, and Engagement plan “in consultation with the OCC.” a. Please confirm that OCC and Eversource only met once, on July 1, 2026, and OCC explained it had not had time to do a complete review of the proposed Outreach, Education, and Engagement Plan. b. Please confirm that in the meeting on July 1, 2026, OCC explained that Public Act Section 20 requires the Company to file an opt-out TVR proposal no later than October 1, 2027. c. Please confirm that in the meeting on July 1, 2026, OCC indicated it had concerns about issuing the Outreach, Education, and Engagement Plan for an opt-in only TVR if the law requires the Company to file an opt-out TVR only months after the current rate case’s decision. d. Please confirm that in the meeting on July 1, 2026, OCC explained that it could not “approve” the Outreach, Education, and Engagement Plan as proposed, without additional information about the types of TVR being implemented. e. Please explain how the Company intends to comply with Public Act Section 20. OCC-422 Response: On June 10, 2026, the Company provided a copy of the draft TVR Customer Engagement Plan to the OCC and DEEP, and requested to meet with both parties to further develop the plan with their consultation, in accordance with Section 21 of Public Act No. 25-173. The Company met with DEEP staff on June 25, 2026, and met with OCC staff on July 1, 2026. Please refer to OCC-422, Attachment 1, and OCC-422, Attachment 2, for the Company’s minutes of the respective meetings. By providing the draft TVR Customer Engagement Plan to both DEEP and OCC on June 10, 2026, and by meeting with both parties to on June 25, 2026, and July 1, 2026, respectively, to solicit and incorporate any feedback they wished to provide, the Company complied with Section 21 of Public Act No. 25-173.Page 23 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-751 Page 3 of 3 In this discovery request, OCC notes that it could not “approve” the TVR Customer Engagement Plan. The Company agrees. Section 21 of Public Act No. 25-173 required the Company to design and file a “comprehensive customer education and engagement program” in CL&P’s pending rate case. Section 21, part (b), indicates any approval of the program required pursuant to Section 21 parts (a) and (b) would come from PURA. Because the Company’s AMI Implementation Plan has not been approved, nor have any AMI-enabled TVR proposals, the TVR Customer Engagement Plan filed in compliance with Section 21 focuses on the existing portfolio of TVR options and necessarily addresses broad AMI-enabled TVR at a high level. Regarding Section 20, which involves different compliance obligations to be completed by October 1, 2027, CL&P will fully comply with the requirement in Section 20 to file an opt-out TVR proposal by October 1, 2027, while additionally presenting the merits of an opt-in approach to TVR given the status of AMI implementation at that time. As noted in Exhibit CLP-AMI-1, at page 11, “AMI, and its ability to track customer usage by the hour (or potentially even smaller increments), is a prerequisite to implementing time-varying rates as envisioned by Public Act No. 25173, as codified in Conn. Gen. Stat. §§ 16-19f and 16-243n.” There, in footnote 1, the Company further explained: The Company must first implement AMI and gain baseline information and learning on its customers use before the advanced TVR as imagined by Conn. Gen. Stat. §§ 16-19f and 16-243n can be implemented. CL&P will undertake a TVR review and analysis once AMI meters are deployed and the Company has been able to collect requisite information, consistent with the requirement in § 16-243n(b) that the design of such rates, including the price differential between on-peak and off-peak time-varying rates, shall be consistent with empirical research conducted by the electric distribution company. Until then, existing TVR and any proposed interim TVR options submitted to be compliant with the October 1, 2027, deadline in § 16-243n will be bridge solutions only. Advanced TVR offerings require the functionalities of AMI, and therefore the Company anticipates that the ultimate AMI meter deployment schedule will dictate the Company’s ability to request approval for advanced TVR offerings for all customers as imagined by Conn. Gen. Stat. §§ 16-19f and 16-243n. As the Company details in its filed AMI Implementation Plan, Exhibit CLP-AMI-2, a comprehensive Customer Outreach and Engagement Framework, based on the actual details of available rate options and the customer engagement technologies developed, will be a critical part of a successful AMI rollout that culminates in the development of TVR capabilities for all customers after AMI meter installation is complete. The Company recommends the convening of an inclusive stakeholder process once AMI meter installation begins so that actual customer interval usage data can be used to evaluate TVR options and reach consensus conclusions. Further, the Company’s AMI Implementation Plan includes the development of a Rate Comparison Tool that will help customers evaluate their TVR options, whether opt-in or opt-out, which will be available as they amass interval usage data after receiving their meters. As the Company’s AMI Implementation Plan proposes that TVR be launched for all customers after they have adequate usage history (e.g., 1 year) to evaluate their TVR options, the updated comprehensive and detailed Customer Outreach and Engagement Framework tied to the future TVR options and customer engagement technologies will be developed over the next 3-5 years.
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.