Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

Files6

Search terms highlighted
Eversource rate increase is on 10 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match

Text of OCC Set 15_COMBINED.pdf

Extracted from the file · 31 pages · 65,747 characters

Text of OCC Set 17_COMBINED.pdf

Extracted from the file · 45 pages · 69,741 characters

Words on different pages
  1. Page 5 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-742 Page 5 of 6 (c) Eversource uses the term "bulk data sharing" to refer to the provision of customer data to authorized entities, such as competitive suppliers for groups of customers rather than through individual customer-by-customer authorization workflows. Eversource anticipates implementing bulk data sharing through a Green Button Connectbased platform that would: a) Maintain approved third-party registrations. b) Receive and process customer enrollment information. c) Establish customer authorizations under an approved opt-out framework. d) Deliver customer data files on a recurring basis. e) Support API-enabled data exchange and retrieval. Bulk data sharing is anticipated to be implemented as a component of the broader Green Button Connect data sharing framework. (d) Eversource anticipates monitoring and reporting operational and performance information, including: a) API transaction activity. b) Data request volumes. c) Request completion status. d) Successful and failed transactions. e) Error reporting and exception tracking. f) User activity and transaction history. (e) Yes. Eversource anticipates designing the platform using standardized Green Button Connect protocols and API-based architecture that can support future expansion and additional use cases. Potential future applications may include: a) Distributed Energy Resource ("DER") programs. b) Demand response programs. c) Energy benchmarking initiatives. d) Load forecasting applications. e) Additional authorized customer energy data services are approved through future regulatory proceedings.
  2. Page 6 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-742 Page 6 of 6 The use of standards-based APIs is intended to facilitate future enhancements while allowing utility systems to remain the authoritative source of customer information. (f) Yes. Eversource anticipates continuing stakeholder engagement throughout implementation of Green Button Connect and related data-sharing capabilities. This engagement may include collaboration with competitive suppliers, customer advocates, technology providers, PURA, and other interested stakeholders. Eversource notes that the Green Button Connect standard was selected following stakeholder consultation, technical review, and regulatory guidance in other jurisdictions. Eversource expects stakeholder input to continue informing implementation activities, operational processes, performance expectations, and future enhancements to the platform.
  3. Page 7 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-743 Page 1 of 4 Date Filed: September 28, 2026 Witness: Jared A. Lawrence, Lavelle A. Freeman and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 3-4, “Several capabilities can be realized with the commencement of AMI meter deployment, including power outage restoration, bulk data sharing, energy efficiency and demand management analytics, load research, transformer load management analytics, unbilled usage detection, VVO analytics, and remote connect/disconnect functionality”. a. Please describe how the Company intends to enable these capabilities with the commencement of AMI including the following: i. Does the Company intend to activate and leverage these capabilities on a region-by-region basis as AMI is deployed? 1. If so, please describe the anticipated phases and cadence of deployment in which capabilities will be iteratively activated? 2. If not, please describe the Company’s approach to realizing capabilities with the commence of deployment. b. Please confirm whether green button connect along with bulk data sharing would be implemented iteratively as AMI deployment occurs. c. As part of implementing transformer load management analytics, does the Company intend to leverage AMI to iteratively develop 8760 hourly profiles at the substation, circuit and nodal level that can be incorporated into distribution planning and operations? Response: a. No, these capabilities are not implemented on a region-by-region basis. These capabilities will be deployed to the meters as soon as all the foundational back-office technology is built. These capabilities will be available to customers as meters are installed and come online. Please refer to page 43 in CLP-AMI-2 for further proposed AMI program timeline on incremental AMI deployment. b. Eversource confirms that Green Button Connect will be implemented iteratively as AMI deployment occurs. We further expect that bulk data sharing capabilities will likewise be implemented on an iterative basis as underlying AMI functionality becomes available and
  4. Page 8 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-743 Page 2 of 4 system integrations are completed during the deployment process, subject to applicable regulatory requirements and approvals. c. The Company intends to use AMI meters and their data to maximize the capabilities thar are available within this technology, which includes creating 8760 profiles. Please refer to the Company’s responses to OCC-587 i and OCC-745 ii for more information regarding this topic. Prior Referenced Responses: i OCC-587 Question: Refer to Exhibit CLP-TSP-3 at 138, “Advancing the Grid, Planning Analytics - Advanced Forecasting Tools.” a. Please describe the milestones and timelines to integrate this tool into distribution planning if approved. b. Please explain why existing forecasting tools cannot generate forecasted 8760 load shapes across all levels: substation, transformer, and at circuit levels OCC-587 Response: a. Based on the Company’s experience, the procurement and deployment process will take 12-18 months from approval, and an addition 6 months to get the tools into full production. b. Historically, time-series profile forecasts were not necessary to review capital projects and the single system peak was the most reliable forecast that could be produced. This is still valid today as the key input to capacity planning remains the magnitude of the peak, regardless of its time or date. As iterated in the Company’s responses to 21-05-15RE03 IDSP, there are also critical questions on the validity and cost benefit of creating an 8760 forecast as an 8760 forecast, by its very nature, not only forecasts the peak load and time of that peak load, but also the weather and load over the entire year. While such profiles are useful for evaluating and sizing certain solutions (e.g., battery storage as an NWA, for which the Company can and does create 24-hour load profiles) they do not provide any incremental value for determining the scope of a substation project, and incur not insignificant incremental effort both on a technology and labor side. The Company has therefore not undertaken the full effort of creating such profiles given the incremental resources needed. The existing tools the Company has in place were never designed nor intended to produce 8760 forecasts. This does not represent an insurmountable barrier but requires additional investments as the Company outlined in its comments to 21-05-15RE03 IDSP, which, without there being any documented proof in either proceeding that 8760 forecasts would quantifiably benefit the customer in a manner offsetting additional costs, requires the Authority to lay out cost recovery pathways for such efforts. ii OCC-745 Question:
  5. Page 9 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-743 Page 3 of 4 Refer to Exhibit CLP-AMI-2 at 8, “Figure 1 – Components of AMI Technology”. a. Please describe how the Company intends to leverage AMI to support distribution planning and operations including the following: i. Please describe whether the Company intends to leverage AMI to support the development of 8760 profiles at the substation, circuit and nodal level. ii. Please describe how the Company intends to use AMI to support real-time operations including the latency at which operational systems such as ADMS and DERMS will receive this data? OCC-745 Response: i. The Company intends to leverage AMI to substantially enhance its ongoing efforts to forecast demand at a granular, customer level. The Company has already begun developing customer-level technology adoption propensity models to project the penetration of EVs, heat pumps, and solar across its service territory. Presently, these efforts rely on third-party data and assumed load profiles in Connecticut, because the Company lacks observed data on adoption and usage for these customers. AMI would provide the Company with ground-truth data that is more reflective of the CL&P-specific customer base and service territory, thus meaningfully improving the accuracy of near-term forecasts and the Company's confidence in long-term forecasts. AMI would improve upon two specific limitations in the Company's current forecasting capability relevant to distribution planning. First, the Company is presently unable to determine, with a high degree of confidence, which individual customers have already adopted technologies such as EVs or heat pumps. Adoption is inferred through propensity modeling informed by third-party data sources rather than observed directly. AMI interval data would allow the Company to detect the load associated with these technologies at the individual meter, enabling adoption to be identified and validated against the Company's own aggregated system data. This present-day adoption would then be used to forecast future adoption with more accuracy than derived using present-day adoption data. Second, while the Company has SCADA telemetry, the Company currently has limited data on how these technologies affect granular load curves at a customer level once adopted. Generic or third-party-derived profiles may not accurately reflect the climate, housing types, customer types, rate structures, and adoption patterns specific to the Company's Connecticut service territory. AMI interval data would enable the Company to derive its own localized technology-specific load shapes directly from observed customer usage, vastly improving the accuracy of the inputs used to translate adoption forecasts into load forecasts. Put simply, the Company's ability to forecast the future development of its system is inherently constrained by its limited visibility into the present state of that system, and AMI would directly address that limitation. With regard to the development of 8760 profiles, please refer to the Company’s response to OCC-575. ii. Exhibit CLP-AMI-2 at 8, “Figure 1 – Components of AMI Technology” is intended to show AMI systems and their relationships. The arrows between the head end and meter data management systems and the ADMS and DERMS real time systems are intended to show potential future integrations that are not included in the Company’s implementation plan. (Note that the integration with OMS is included in the implementation plan.)
  6. Page 10 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-743 Page 4 of 4 As described in the response to OCC-747, “[t]he Company is currently investigating the technical feasibility, costs, and benefits of an AMI-informed DMS model, including the benefits for voltage optimization. Issues of data latency will be included in this investigation.”
  7. Page 11 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-744 Page 1 of 1 Date Filed: September 28, 2026 Witness: Jared A. Lawrence Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 16-17, “Company concluded that a hybrid approach, utilizing a private wireless “mesh” network coupled with public carrier cellular networks, is the most effective technology for its electric AMI telecommunications network needs”. a. Please describe how the Company intends to use the mesh network vs. public carrier cellular networks including the following: i. Please confirm that public carrier cellular networks will be used to backhaul AMI data to the head end and meter data management system. If so, please describe the interval at which AMI data will be backhauled and the latency of the data transfer. Response: The AMI network uses a combination of mesh network technology and public cellular carriers to create the backhaul path. AMI meters form a mesh network where each meter can relay data for other meters, cost-effectively extending coverage and improving reliability. This mesh provides the local area network for AMI data backhaul. Access Points (APs) are AMI network devices that utilize the mesh network and public cellular carriers. APs aggregate and route traffic between AMI meters and the AMI head-end system using public cellular carriers. Public cellular carriers provide wide area network coverage. AMI meter data is backhauled every 15 minutes. Data latency from a customer’s meter to the head-end system averages less than 10 seconds in the Massachusetts AMI system.
  8. Page 12 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-745 Page 1 of 3 Date Filed: September 28, 2026 Witness: Jared A. Lawrence, Lavelle A. Freeman and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 8, “Figure 1 – Components of AMI Technology”. a. Please describe how the Company intends to leverage AMI to support distribution planning and operations including the following: i. Please describe whether the Company intends to leverage AMI to support the development of 8760 profiles at the substation, circuit and nodal level. ii. Please describe how the Company intends to use AMI to support real-time operations including the latency at which operational systems such as ADMS and DERMS will receive this data? Response: i. The Company intends to leverage AMI to substantially enhance its ongoing efforts to forecast demand at a granular, customer level. The Company has already begun developing customer-level technology adoption propensity models to project the penetration of EVs, heat pumps, and solar across its service territory. Presently, these efforts rely on thirdparty data and assumed load profiles in Connecticut, because the Company lacks observed data on adoption and usage for these customers. AMI would provide the Company with ground-truth data that is more reflective of the CL&P-specific customer base and service territory, thus meaningfully improving the accuracy of near-term forecasts and the Company's confidence in long-term forecasts. AMI would improve upon two specific limitations in the Company's current forecasting capability relevant to distribution planning. First, the Company is presently unable to determine, with a high degree of confidence, which individual customers have already adopted technologies such as EVs or heat pumps. Adoption is inferred through propensity modeling informed by third-party data sources rather than observed directly. AMI interval data would allow the Company to detect the load associated with these technologies at the individual meter, enabling adoption to be identified and validated against the Company's own aggregated system data. This presentday adoption would then be used to forecast future adoption with more accuracy than derived using present-day adoption data.
  9. Page 13 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-745 Page 2 of 3 Second, while the Company has SCADA telemetry, the Company currently has limited data on how these technologies affect granular load curves at a customer level once adopted. Generic or third-party-derived profiles may not accurately reflect the climate, housing types, customer types, rate structures, and adoption patterns specific to the Company's Connecticut service territory. AMI interval data would enable the Company to derive its own localized technology-specific load shapes directly from observed customer usage, vastly improving the accuracy of the inputs used to translate adoption forecasts into load forecasts. Put simply, the Company's ability to forecast the future development of its system is inherently constrained by its limited visibility into the present state of that system, and AMI would directly address that limitation. With regard to the development of 8760 profiles, please refer to the Company’s response to OCC-575 i. ii. Exhibit CLP-AMI-2 at 8, “Figure 1 – Components of AMI Technology” is intended to show AMI systems and their relationships. The arrows between the head end and meter data management systems and the ADMS and DERMS real time systems are intended to show potential future integrations that are not included in the Company’s implementation plan. (Note that the integration with OMS is included in the implementation plan.) As described in the response to OCC-747 ii, “[t]he Company is currently investigating the technical feasibility, costs, and benefits of an AMI-informed DMS model, including the benefits for voltage optimization. Issues of data latency will be included in this investigation.” Prior Referenced Responses: i OCC-575 Question: Refer to Exhibit CLP-TSP-2 at 21-22, “Historical System Load Analysis.” a. Please describe the temporal granularity (i.e hourly etc.) of the historical loading information used to inform the Company’s load forecast and whether this varies depending on location and data availability. b. Please describe the percentage of substations and associated feeders with available 8760 hourly profiles. If some or all of the substations and associated feeders do not have 8760 hourly profiles, please describe whether and when the Company plans to have 8760 profiles available. OCC-575 Response: a. To create the substation peak forecast the Company relies on the peak hour values which are determined from 15 min SCADA data by substation and at the system level. b. Please refer to the Company’s response to information request OCC-587i. The Company currently does not create 8760 load forecast profiles. Where SCADA data is available1, the Company does have historical 8760 “as measured” data. The Company currently has no plans absent approval of requested resources as presented
  10. Page 14 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-745 Page 3 of 3 in the Exhibit CLP-TSP-3 at 138. Here, the Company has outlined a pathway to develop the resources needed for the full capabilities to provide 8760 data within 18 to 24 months. ii OCC-747 Question: Refer to Exhibit CLP-AMI-2 at 38, “Once the VVO control system can accept AMI voltage data directly, the Company will develop an integration between the VVO control system and the MDMS, allowing the VVO system to respond to voltage violations (below or above stated thresholds) automatically.” a. b. Please describe the latency at which the Company’s VVO control system will receive AMI data. Please describe how VVO will be coordinated with the DERMS demonstration on centralized voltage management. OCC-747 Response: a. As noted in CLP-AMI-2 at 38, the integration between the VVO control system and MDMS has not yet been developed. Accordingly, the latency at which the Company’s VVO system will receive AMI data has not yet been determined. The Company’s VVO control system will be an application known as load voltage management (“LVM”) within its distribution management system (“DMS”). The DMS is a real-time application, using real-time telemetry from substations and field devices to provide system operators with as-operated load flow tools. As AMI represents millions of data points, integration of real-time AMI telemetry into DMS/LVM is a technical challenge that will require significant design and testing. The Company expects the use of AMI data to support real-time VVO operations will occur in phases. As described in CLP-AMI-2 at 38, the first phase will be operational dashboards using recent (not real-time) AMI data to support assessments of VVO operations for the purpose of improving use of the DMS/LVM for voltage optimization. Second, AMI data will be used to improve the accuracy of load profiles used to inform DMS load allocation. This will increase the accuracy of the DMS load flow, which will improve the functionality of all DMS applications, including LVM. The third step would be the use of real-time AMI telemetry to inform the DMS model. The Company is currently investigating the technical feasibility, costs, and benefits of an AMI-informed DMS model, including the benefits for voltage optimization. Issues of data latency will be included in this investigation. b. The opportunity to include VVO in the DERMS demonstration (in coordination with the Grid Services Compensation Fund) focuses on the use of DERMS to operate advanced inverters from customer DER, including solar and battery energy storage, via the DERMS to support reactive power management. The objective would be to assess the technical feasibility, costs, and benefits of incorporating customer DER in the Company’s VVO operations, using the DMS/LVM tools described above, to test the hypothesis that use of existing DER to manage voltage will result in net cost savings for customers.

As listed on the current system

Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

This filing on the current system (opens in a new tab)