Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (0CC Set 16).

Files2

Search terms highlighted
Eversource rate increase is on 13 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
13 pages match
  1. Page 105 of 148Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-680 Page 2 of 2 ii OCC-333 Question: Payroll. For each of the new positions that the Company is requesting recovery of in the Rate Year, state whether the hiring of the positions are conditioned on their approval in this case. OCC-333 Response: The Company is providing an update for the Full Time Equivalent (“FTE”) counts included in the request for recovery in the Rate Year in this response as OCC-333, Attachment 1 (note that this is an update of Exhibit CLP-REVREQ-2, Work Paper C-3.5, page 3). The Company will update the payroll expense and other affected costs as part of its next cost of service update. The number of FTEs included in the original filing was fifty-eight (58). This number was a preliminary number and included FTEs contemplated in the Advancing the Grid plan that is above and beyond the Targeted System Plan (“TSP”) requested for review and approval in this application. The updated number of incremental FTEs to be included in the Rate Year of the Company’s cost of service is forty-one (41). Included in the forty-one (41) full-time positions are twenty-one (21) in Vegetation Management, five (5) Power Quality positions, two (2) in Distribution Planning & Forecasting and one (1) Asset Health, these are contingent on PURA’s approval in this case. In addition, for Grid Modernization there are seven (7) for Control Room Operations, three (3) for Data Innovation, and two (2) for Field Communications that the Company will consider hiring based on business needs and changing requirements as necessary, but most likely not all requested. The Vegetation Management positions allow the Company the opportunity to improve the system’s reliability and improve cost-efficiency by transitioning more work in-house to restructure vegetation management performance for the benefit of our customers. While the twenty-one (21) Vegetation Management positions appear to be incremental, in reality there is only 1 incremental resource. Of the twenty-one (21), eight (8) of the FTEs are the result of 16 employees who currently split their time 50%/50% between O&M and capital work shifting to solely working on the proposed combined O&M program, if approved, results in the equivalent of 8 incremental employees working on the O&M program; twelve (12) resources would be converted from contracted resources to internal resources of which the Company’s proposed vegetation management expenses in Exhibit CLP-REVREQ-2, Work Paper C-3.31 reflect the reduction in outside contractor services; and one (1) resource would be truly incremental. The Grid Modernization positions are needed to support large-scale distributed energy resource (“DER”) integration and clean-energy advancement; develop and deploy advanced tools and analytics for integrated distribution system planning and grid modernization; and drive increased innovation and application of GenAI, LLM and machine learning capabilities. The Company is also providing as OCC-333, Attachment 2, which is a corrected Exhibit CLP-TSP-3, page 43 of 149 that has been updated with the corrected number of FTEs in the parenthesis in the text boxes on the right.
  2. Page 106 of 148Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-681 Page 1 of 2 Date Filed: September 24, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Refer to the response to OCC-359 explain why the Rate Year amount should be escalated since the costs declined each year from 2021-2025. Response: The Rate Year amount is a representative level of expense that the Company expects to incur during the Rate Year for temporary staffing. With labor costs continuing to increase, the use of the GDP-PI as a proxy for cost in the Rate Year is lower than the merit increases over the same period. Further, the 5-year and 2-year average for temporary staffing exceed the Rate Year amount, providing evidentiary support that the use of the GDP-PI is reasonable. While the Company has noted it is relying more on internal staffing, there continues to be a business need to utilize temporary staffing in various parts of the Company, as noted in the Company’s response to EOE-125 i. Further, these resources are considered staff augmentation meaning that a decrease in temporary staffing would be offset by an increase in full time FTEs. The reverse would also be true in the case the Company has a decrease in full time FTEs and needed to augment with temporary staffing. Prior Referenced Response: i EOE-125 Question: (EXTERNAL STAFFING) Provide an unlocked Excel spreadsheet detailing the Company’s ‘external’ average staffing levels for each year starting from 2018 through present, along with the overall gross costs. To the clear, this request is looking to identify the roles, counts, applicable external vendors, costs, and any other relevant details that could assist in minimizing follow-up interrogatories. This request is applicable to all types of external staffing including, but not limited to, vendors supporting line crew activities, customer service activities, IT development activities, etc. EOE-125 Response: The Company began tracking external staffing counts on a systematic, reportable basis starting in 2023. As a result, the system has data as of December 2023, and December 2024 and then by month starting in 2025 and 2026. Please refer to EOE-125, Attachment 1, for a headcount by Business Area using the respective December counts. Please note that external staffing counts are not associated with a specific operating company. Therefore, in EOE-125, Attachment 1, the Company provides the requested data in relation to any business area that could potentially support
  3. Page 107 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-681 Page 2 of 2 CL&P. This includes Shared Services Organizations such as CFO and Customer Group, as well as operational organizations such as Engineering and Safety, Training, and Fleet. “External Staffing” referenced above is generally held to mean short-term temporary staffing that can include administrative/clerical, accounting/financial, technological, and project support. External staffing is hired through staffing agencies (i.e., temp agencies) or can been contracted directly with firms. During the period requested, the Company had two outside vendor companies that acted as staffing agencies, Randstad and Allegis Global Solutions. During the requested period, the Company directly contracted with 30 outside vendor companies. These vendors are Burns & McDonnell, TRC Engineers, Progressive Global Energy, United Utility Power Services, CHA Consulting, Capital Staffing Solutions, Leidos, RLC Engineering, Plant Forward Energy Services, Qualus, Ironhouse, Qualus Consulting, AI Engineers, ESPii, EN Specialty Services, PMA Consultants, Watkins Strategies, Airswift, WunderlichMalec, Power Engineers, Cascade, RCM Technologies, Global Technical Talent, Shermco Industries, EPST-A Voltyx Company, Parsons, Asplundh Engineering Services, BHI Energy, Saybrook Associates Inc., and Control Point Technologies. The Overhead Line Department has kept internal reporting on counts for CL&P Distribution Overhead Line crews, as shown in EOE-125, Attachment 2. This includes headcounts by vendor with the averages from 2018 to June 2026. The Company does not track staffing counts for any other types of Contractors. “Contractors” are vendors used to supplement the Company’s internal work force for specific functions and projects to respond to the increase of work during peak need times including the seasonal demand of the work plan, repairs, and project management. The gross costs on all Outside Services are included in EOE-125, Attachment 3, including all Outside Services provided to the Company by vendor. This includes the External Staffing, CL&P Overhead Line Crews and all other Contractors, as described above.
  4. Page 108 of 148Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-682 Page 1 of 2 Date Filed: September 28, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Environmental Remediation Expense. Refer to WP C-3.13. Provide documentation supporting the Rate Year increases. (bids, quotes, contracts, invoices) Response: The Clean Up & Disposal of Waste Material Rate Year adjustment of $378,000 is driven by the adoption of Regulations of Connecticut State Agencies § 22a-134tt-1 et seq. (the Release Based Cleanup Regulations or “RBCRs”). The RBCRs were adopted pursuant to Conn. Gen. Stat. § 22a134tt, and became effective on March 1, 2026. The Company estimated spend of $1.3 million from 2026 through 2028 to comply with the new regulations. See the table below for the Company’s Rate Year Adjustment of $378,000 for Clean Up & Disposal of Waste Material calculation. Calendar Year 2027 2028 Amount 545,000 210,000 $ 755,000 $ Months 12 12 $ Monthly 45,417 17,500 Rate Year Period Mos 6 6 Rate Year Adjustment $ 272,500 105,000 $ 377,500 The Company identified an inadvertent error in the Rate Year adjustment calculation for the Manholes & Vaults costs. The Manholes & Vaults Rate Year adjustment is revised to $48,000 from $65,000, driven by percentage increases in pricing for Clean Harbors Environmental Services, Inc. and NRC East Environmental Services Inc. Refer to the table below for the revised Rate Year Adjustment for Manholes & Vaults costs. Clean Harbors NRC East Environmental Environmental Services, Inc. Services, Inc. Test Year Charges $ 467,204 $ 28,243 $ % Increase 10.0% 4.0% Rate Year Adjustment 46,720 1,130 Rate Year Ending $ 513,924 $ 29,373 $ Rate Year Amount Other 4,861 $ 500,308 0.0% 47,850 4,861 $ 548,158
  5. Page 109 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-682 Page 2 of 2 Refer to OCC-682, Attachment 1 CONFIDENTIAL, for Clean Harbors contract agreement. Refer to Appendix PS-4 of Exhibit D – Pricing Schedule for the Year 4 increase percentage. Refer to OCC-682, Attachment 2 CONFIDENTIAL, for NRC East contract agreement. Refer to the NRC East’s Exhibit D Pricing Schedule. Refer to Attachment 2a for the Year 4 increase percentage.
  6. Page 110 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-683 Page 1 of 1 Date Filed: September 24, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Industry Dues. Refer to the response to OCC-073. Do any of the organizations listed engage in advertising? If so, provide the amounts related to advertising included in the Rate Year. Response: Of the organizations listed in OCC-073, the Edison Electric Institute (EEI) does engage in advertising activities. Note that such advertising activities are not paid for by the Company. Henceforth, no amounts related to advertising are included in the Rate Year.
  7. Page 111 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-684 Page 1 of 1 Date Filed: September 24, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, John P. DiPaola-Tromba, Sean D. Redding and Jenna M. Turner Request from: Office of Consumer Counsel Question: Arbor Day Celebration. Refer to the response to OCC-100. Provide the amount of Arbor Day Celebration costs included for recovery in the rate year by category. Response: The Company included $11,500 for the Arbor Day Foundation Energy Saving Trees program and $8,000 for Arbor Day Celebrations (school seedlings) in the Rate Year. Both costs are included in the Other category of Schedule C-3.31 in cost of service. As noted in Exhibit CLP-VMP-3 at page 1 (Electric Power Systems Research by the Department of Civil Environmental Engineering, University of Connecticut, Storrs, CT, USA), “urban forests change microclimate conditions, by decreasing the temperature during hot summer days and improving air quality, and also provide a more pleasant and comfortable living environment.” As such, the Company’s investment into programs such as the Arbor Day celebration and Arbor Day Foundation Energy Saving Trees program provide a direct benefit to customers and are appropriately included in the Company’s cost of service.
  8. Page 112 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-685 Page 1 of 1 Date Filed: September 24, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, John P. DiPaola-Tromba, Sean D. Redding and Jenna M. Turner Request from: Office of Consumer Counsel Question: Arbor Day Foundation. Refer to the response to OCC-100. Provide the amount paid to the Arbor Day Foundation included for recovery in the rate year. Response: Please refer to the Company’s response to interrogatory OCC-684 i. Prior Referenced Response: i OCC-684 Question: Arbor Day Celebration. Refer to the response to OCC-100. Provide the amount of Arbor Day Celebration costs included for recovery in the rate year by category. OCC-684 Response: The Company included $11,500 for the Arbor Day Foundation Energy Saving Trees program and $8,000 for Arbor Day Celebrations (school seedlings) in the rate year. Both costs are included in the Other category of Schedule C3.31 in cost of service. As noted in Exhibit CLP-VMP-3 at page 1 (Electric Power Systems Research by the Department of Civil Environmental Engineering, University of Connecticut, Storrs, CT, USA), “urban forests change microclimate conditions, by decreasing the temperature during hot summer days and improving air quality, and also provide a more pleasant and comfortable living environment.” As such, the Company’s investment into programs such as the Arbor Day celebration and Arbor Day Foundation Energy Saving Trees program provide a direct benefit to customers and are appropriately included in the Company’s cost of service.
  9. Page 113 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-686 Page 1 of 1 Date Filed: September 24, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: VMP. Refer to the response to OCC-101(a). Provide the name of the contactor used for the current contract and the prior two contracts. Response: The Company’s VMP utilizes multiple vendors across the different programs and is not restricted to a single vendor in the contracts. Please refer to OCC-101, Attachment 1 CONFIDENTIAL, for a list of vendors utilized on the four-year contract covering the term 2023-2026. Please refer to EOE-153, Attachment 1, for a list of the distribution vegetation management vendors used in years 2018-2025.
  10. Page 114 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-687 Page 1 of 1 Date Filed: September 24, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: VMP. Refer to the response to OCC-102 Attachment 1. Provide the amounts by category for each year 2021, 2022, 2023, 2024, 2025 and the rate year. Response: Please refer to EOE-142, Attachment 1, for the VMP actuals for years 2018-2025. The Rate Year is provided in OCC-102, Attachment 1.

As listed on the current system

Corres. 10/01/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (0CC Set 16).

This filing on the current system (opens in a new tab)