  1. Page 131 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-699 Page 1 of 1 Date Filed: September 25, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Denise Cosentino Request from: Office of Consumer Counsel Question: Insurance. Refer to the response to OCC-376 Attachment 3. Provide the premium percentage increases for each year 2021, 2021, 2022, 2023, 2024 and 2025.Explain why accruals for uncollectible claims are included in insurance Expense. Response: Please refer to OCC-699, Attachment 1, for the Company’s year-over-year premium increases for years 2021 through 2025. Please note that the All-Risk Property is based upon replacement cost of insurable property. During the period of 2020 through 2023, COVID and a resulting global supply chain crisis significantly raised the replacement cost of insurable property. Other increases and decreases are movements because of the insurance market experiencing catastrophic losses or evolving exposures such as cyber. The Company clarifies that the uncollectible claims included in the insurance expense SFR are separate and distinct from the uncollectible expense included in Exhibit CLP-REVREQ-2, Schedule C-3.30 which reflects the uncollectible expense associated with normal customer billing. The accrual for uncollectible claims included in the insurance SFR is a reserve against damage to the Company’s infrastructure such as poles and underground lines by third parties. Third parties are billed for the costs to repair such property and this accrual accounts for the uncollectible portion of the amount billed. The Company estimates the likelihood of recovery through the third party’s insurance, settlement, legal action, or other means, and records the associated uncollectible expense. The Company makes a good faith effort to organize the SFRs with the corresponding costs associated with them. In this instance, because these are property damage claims that the Company is unable to collect from third parties, including the third party’s insurance, settlement, legal action, or other means, the Company includes these costs in the insurance SFR.
  2. Page 132 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-700 Page 1 of 1 Date Filed: September 24, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Christopher Leigh Request from: Office of Consumer Counsel Question: Credit Monitoring Costs. Refer to the response to OCC-20. Provide the amount of credit monitoring costs included for recovery in the Rate Year associated with this and other attacks. Response: The Company has no credit monitoring costs included for recovery in the Rate Year associated with any cyber security attacks.
  3. Page 133 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-701 Page 1 of 1 Date Filed: September 24, 2026 Witness: Douglas P. Horton, Brendan J. O' Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Non Catastrophic Storm Costs. Refer to OCCC-383. Provide the historical uninflated amounts. Response: Please refer to the table below for the Company’s non-catastrophic event costs in thousands of dollars in years 2021 through 2025 prior to accounting for inflation: Year Non-Catastrophic Costs (Thousands of Dollars) 2021 2022 $39,693 $24,114 2023 $31,419 2024 $30,361 2025 $33,696 Please refer to OCC-701, Attachment 1, Page 1 for the calculation showing how the uninflated amounts were inflated to the Rate Year. Page 2 provides the raw data and information used to derive the applicable inflation factors on OCC-701, Attachment 1, Page 1, line 15.
  4. Page 134 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-702 Page 1 of 2 Date Filed: September 29, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Legal Expense. Refer to the response to OCC-309. Provide an explanation of the increase in 2025 expense over the prior years shown. Response: Reviewing OCC-309, Attachment 1, please note that the payment in calendar year 2025 of $249,938 to PricewaterhouseCoopers LLP (“PwC”) should be eliminated from the total recurring cost for 2025. The Company has determined that this amount pertains to the attestation that PwC performed in relation to storm costs reviewed by PURA in Docket No. 25-12-13. The Company has made no request to recover the cost of PwC’s attestation in this case or any other case. Coincident with the decision to eliminate the PwC charges from recovery, the amount charged to the legal department in 2025 should have been removed from this schedule. The Company will make an adjustment to the proposed revenue requirement in the first update. Deducting this amount changes the 2025 total of recurring legal costs to $4,935,254 ($5,185,192 minus $249,938). In addition, there is a difference of approximately $504,071 in the category of “Miscellaneous Accounting Other” between 2024 and 2025. The differential shown in this line pertains to timing of accruals and associated invoicing, which resulted in a negative adjustment across the four historical years, as compared to a positive adjustment of $268,985 in 2025. These accounting adjustments are normally recurring and result from the application of generally accepted accounting principles. The Company expects the remainder of the itemized legal costs to be recurring following the Test Year 2025, particularly in the aggregate. Like other categories of expenses, the Company expects to experience an “ebb and flow” of legal matters, with the overall work requirements and associated costs remaining in the same range. A major driver of external legal costs is the fact that regulatory requirements have fundamentally changed since the 2020-2021 timeframe, with additional layers of complexity and new obligations for regulatory proceedings, as well as a broader range of regulatory proceedings requiring substantial work effort by the Company. The Company does not control these factors, although it must respond to meet its new obligations and requirements. The primary reason for an increase in cost in 2025 is the cost of legal work associated with collection activities that doubled between 2024 and 2025, from $882,201 in 2024 to $1,632,968,
  5. Page 135 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-702 Page 2 of 2 for a difference of $750,767. Increased collections activity occurred in 2025 -- and is continuing to occur -- due to PURA’s extended suspension of collection activities between 2020 and 2024, which ended with PURA’s decision dated November 6, 2024, in Docket No. 24-05-01, Order No. 3, restarting the arrearage collection practices. Excluding this $750,767 increase in the cost of legal process for arrearage collections in 2025, the annual legal expense would be comparable across all five years, ranging from $2,287,868 to $4,184,487 in the years 2021 through 2025, or approximately $3,508,583 annually on average. With the substantial increase in collection activities excluded, the recurring legal costs for the Test Year 2025 are only slightly above the five-year average, commensurate with increased regulatory requirements for the Company’s regulatory proceedings. As a result, the Company fully expects that the Test Year legal expense is recurring and representative of going-forward legal costs.
  6. Page 136 of 148Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-703 Page 1 of 3 Date Filed: September 24, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Outside Services. Refer to the response to OCC-315. Provide the Rate Year amount by vendor. Provide support for Rate Year increases (quotes, contracts, invoices) as originally requested. Response: There was a system error in filing the original response with PURA. The full response that should have been filed with PURA is: Please refer to OCC-315, Attachment 1, for O&M Outside Services by vendor for years 2021, 2022, 2023, 2024, 2025. The Company does not prepare the cost of service by reviewing each line item and the associated contract to support the Rate Year amounts as there are millions of line items entries within the Company’s general ledger. The Company has bucketed its costs into the standard filing requirements schedules and adjusted the Test Year expenses for either known and measurable changes, or by the GDP-PI based on historical trends. The Company has provided the contracts associated with outside services in the Company’s responses to EOE-005 i, OCC-044 ii, and EOE-014 iii. i EOE-005 Question: (VENDOR CONTRACTS) Provide a list of third-party vendors utilized by the Company during the Test Year. For each vendor please include: a. A brief description of the work performed; and b. The fully executed contract with each third-party vendor including all amendments and supporting schedules. Additionally, provide any historical versions of the contract since the last rate case. EOE-005 Response: Please refer to EOE-005, Attachment 1, for a listing of all third-party vendors utilized in the Test Year. The contract documentation associated with EOE-005, Attachment 1, is provided in EOE-005, Attachment 2 CONFIDENTIAL, through EOE-005, Attachment 42 CONFIDENTIAL. For any contracts not provided in EOE-005, Attachment 1, please refer to OCC-044, Attachment 2 CONFIDENTIAL, and EOE-014, Attachment 2 CONFIDENTIAL. Contracts identified as “Legacy Agreement” within EOE-005, Attachment 1, represent purchase orders that were migrated from a legacy system. Those legacy agreements may have been supported by a governing contract maintained in a separate system with terms and conditions more specific to the material or service purchased by the Company –
  7. Page 137 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-703 Page 2 of 3 or may have served as standalone agreements. In those instances, documentation consists of either agreements that are managed outside of the system or individual purchase orders that served as the agreement with the associated terms. All of the relevant charges are supported by purchase orders, which represent a form of contract, containing the Company’s terms and conditions, pricing and a description of the goods or services supported. Although purchase orders are generally not dually executed, a supplier’s acceptance of those terms and delivery of materials or services constitutes consent. For transactions involving low risk materials or services, or those not typically subject to negotiation, the purchase order and its associated terms are the typical mode to support the transactions. The Company is compiling a brief description of the work performed for the approximate 559 contracts provided in EOE-005, Attachment 1, and will supplement this response as soon as practicable. ii OCC-044 Question: (Contracts) For all external line crews and vegetation contractors whose costs are reflected in the storms in this docket and for all current external line crews, please provide all contracts and addendums thereto in effect from January 1, 2024, to the present. OCC-044 Response: Please refer to OCC-044, Attachment 1, for a listing of external line crew and vegetation contractors whose services were utilized in the storms under review in this docket and all current external line crews. Attachment 1 includes page number references to the associated contracts, which are provided as OCC-044, Attachment 2 CONFIDENTIAL. iii EOE-014 Question: (STORM 3rd PARTY INVENTORY/CONTRACTS) Respond to the following: a. Provide a complete listing of all outside contractors and vendors used in support of storm remediation, including a brief explanation of the work performed by each contractor and vendor. b. Provide complete copies of all executed contracts for each vendor listed in (a) above, inclusive of pricing schedules. c. Cite the specific documents and applicable pages that support the pricing for each contractor/vendor for each storm event for which the Company is seeking recovery in this docket. EOE-014 Response: a. Please refer to OCC-044, Attachment 1, for a listing of external line crew and vegetation contractors whose services were utilized in the storms under review in this docket, as well as associated contract documents. For external vendors utilized in the storms under review in this docket (and not related to line crews or vegetation management), please refer to EOE-014, Attachment 1, which lists all other contractors and vendors with a brief explanation of work performed. EOE-014, Attachment 1, includes page number references to the associated contracts provided in EOE-014, Attachment 2 CONFIDENTIAL. Contracts identified as “Legacy Agreement” within EOE-014, Attachment 1, represent purchase orders that were migrated from a legacy system. Those legacy agreements may have been supported by a governing contract maintained in a separate system with terms and conditions more specific to the material or service purchased by the Company – or may have served as standalone agreements. In those instances,
  8. Page 138 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-703 Page 3 of 3 documentation consists of either agreements that are managed outside of the system or individual purchase orders that served as the agreement with the associated terms. b. The contracts provided in OCC-044, Attachment 1, and EOE-014, Attachment 2 CONFIDENTIAL, all pertain to vendors providing services to the Company on storm events in 2024 and 2025, as filed in this docket. Each contract may be applicable to each storm event. Exhibit CLP-ACCT-2 (CLP-1) through Exhibit CLP-ACCT-2 (CLP-14) include a detailed listing of the vendor-invoice charges applicable to each particular storm event.
  9. Page 139 of 148Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-704 Page 1 of 1 Date Filed: September 29, 2026 Witness: Brendan J. O’Brien, John G. Griffin, Garrett J. Murray, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Payroll. Refer to the response to OCC-319 Attachment 1. a. Update Attachment 1 to include information for 2018, 2019 and 2020. b. Explain why the Company’s O&M expense payroll has not reached $129.285 million authorized in Docket No. 17-10-46 each of the years 2021-2025. Response: a. Please refer to OCC-704, Attachment 1, which has been updated from OCC-319, Attachment 1, to include budgeted payroll for operating expense and capitalized work for 2018, 2019, 2020. b. OCC-704, Attachment 1, presents an estimated budget perspective. The actual operations and maintenance (“O&M”) expense for base payroll is updated in OCC-704, Attachment 2, at Line 1. OCC-704, Attachment 2, is revised from EOE-123, Attachment 1, to disaggregate deferred storm payroll and non-deferred storm payroll and to provide total O&M base payroll expense on Line 1. As shown in the attachments, the Company’s total O&M payroll expense exceeded the amount allowed in rates in Docket No. 17-10-46 for each of the years 2021 through 2025, with the exception of 2021 and 2022. In these years, the total payroll was less than the actual allowed in rates primarily due to an increased level of capital work performed and fluctuations in the overhead costs due to COVID-19 impacts. In total over the 5-year period, labor costs were in excess of the amount in rates by over $30 million.
  10. Page 140 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-705 Page 1 of 1 Date Filed: September 25, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Payroll. Refer to the responses to OCC-322 and OCC-325. Explain why the 6/2026 CLP and EESCO FTEs have declined from 12/31/2025 amounts. Response: The Company is unclear of the conclusion drawn by this question that CL&P and ESC FTEs have declined from 12/31/2025 to 6/30/2026. To clarify, the Company is providing the table below which shows that the Service Company (“EESCO”) FTEs increased 75 FTEs and CL&P FTEs decreased from December 31, 2025 to June 2026. The change in CL&Ps FTEs during the first half of 2026 is primarily driven by 30 retirements, 16 terminations and 20 new hires. Please refer to the table below for FTE comparison. Source December 31, 2025 OCC-322 June 30, 2026 OCC-325 Change in FTEs CL&P FTEs 1,417 1,401 (16) EESCO FTEs 4,493 4,568 75 Total FTEs 5,910 5,969 59

As listed on the current system

Corres. 10/01/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (0CC Set 16).

This filing on the current system (opens in a new tab)