Discovery Compilation (0CC Set 16).

Files2

Search terms highlighted
Eversource rate increase is on 13 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
13 pages match
  1. Page 15 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-615 Page 2 of 3 Prior Referenced Response: i NECTA-016 Question: (Pole Management & SPA) Refer to Exhibit CLP-ADDITIONS-1 at p. 64 (“Replacements are based on annual inspections”). Provide the following: a. b. Describe the Company’s annual inspection process, including the number of poles inspected each year, the data collected during the inspection, the criteria used to determine the integrity of the pole, who performs the inspections, and how the information collected during the inspections is used. Provide all data collected during the most recent annual inspection. NECTA-016 Response: a. The Company performs its routine and annual pole inspection to its custodial wooden poles following a 15year inspection cycle which ended in 2025. This cycle ensured that every custodial pole across 157 towns in Connecticut was inspected at least once within the time frame. Approximately 29,000 to 32,000 poles were inspected using the 15-year cycle. In 2025, the Company reviewed its wood-pole inspection standards and decided to shorten the inspection cycle from 15 years to 10 years. By adopting a more frequent inspection schedule, the Company aims to evaluate each custodial pole every 10 years, allowing issues to be identified earlier and addressing them more proactively. Under the revised 10-year cycle, approximately 41,000 to 42,500 poles will be inspected starting in 2026 and moving forward. The inspection process is based on the age of the pole. A visual inspection is completed for poles with less than 20 years of service. For poles with more than 20 years in service the inspection will include a visual, sound and bore, resistograph testing also known as IML testing, and the application of preservatives “treatment” required to maintain the structural integrity of the pole, and ensure continuous serviceability until the subsequent inspection interval. The number of poles replaced each year due to age, structural deterioration, damage, or end-of-life conditions varies based on the number of rejected poles identified through the annual pole inspection program. Poles classified as “Rejects” cannot remain in service because their remaining strength has fallen below 67% of their original strength or because they exhibit structural or mechanical damage that compromises safe operation. These poles are scheduled for replacement within one year of identification. Poles classified as “Priority Rejects” represent the most critical conditions and cannot remain in service because their remaining strength has fallen below 25% of their original strength and/or they exhibit severe structural or mechanical deterioration that presents an immediate public safety risk and reliability. Priority Reject poles are made safe within 48 hours of identification and are replaced as soon as practicable. Poles classified as “Leaning” are poles that are susceptible to failure and may pose risks to public safety and electric system reliability. Leaning poles occur when soil disturbances, loading from pole attachments, or other external forces alter the pole’s original alignment. These conditions are commonly caused by soil saturation and moisture accumulation, excessive structural loading, vehicle impacts, severe weather, or storm-related damage. Depending on the severity of the condition, findings from the pole inspection process
  2. Page 16 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-615 Page 3 of 3 are communicated to the Company on a daily, weekly, or immediate basis to ensure appropriate corrective actions are taken. Currently, GeoForce Utility Technologies is the contractor responsible for performing all pole inspections throughout Connecticut during the 2024-2026 period. The selection of pole inspection contractors follows a competitive bidding process, with the successful bidder typically awarded a three-year inspection cycle contract. b. Please refer to NECTA-009i for the data collected during the most recent pole inspection.
  3. Page 17 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-616 Page 1 of 1 Date Filed: September 24, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Consumer Counsel Question: (MS24E - Allocation) Please refer to the Response to EOE-13, Attachment 1. Please explain how the Company determined how to allocate costs between MS24E and MN24F011. Response: The Company does not allocate costs between storm events. All storm-related costs are directly charged to specific work orders established for each specific event and recorded within the duration of the event occurrence. This includes both internal costs and any outside services procured to directly support response and restoration activities associated with the event. In the course of subsequent review of EOE-13, Attachment 1, a clerical error was identified in the storm event date ranges. The dates for Storms MN24F011 and MS24E011 do not overlap. The corrected information is provided below to ensure the record accurately reflects the applicable storm periods: • Storm MN24F011 occurred from March 9, 2024, through March 10, 2024 • Storm MS24E011 occurred from March 11, through March 13, 2024
  4. Page 18 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-617 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 1. Please explain the work associated with this invoice and why the work occurred more than one month after the event. Response: Referring to Exhibit ACCT-2 (CLP-5)(MS4E), Outside Line Contractors, at Line 33, Artisan Outdoor Installations LLC, in the amount of $1,194.00. While preparing the data for this response, it was determined that this charge is related to the MS24D event. The Company will supplement Exhibit ACCT-2(CLP-5)(MS4E) to remove line 33 in the amount of $1,194. In addition, the Company will supplement Exhibit ACCT-2(CLP-4)(MS24D) to include this invoice in the amount of $1,194. The invoice reflects a billing date of April 14, 2024, while the Summary of Costs identifies the date of work as March 12, 2024. During the storm event, a tree caused damage to equipment on the property. The Company engaged Artisan Outdoor Installations LLC to return to the site and repair lawn damage caused by the storm event and the associated restoration activities. Please refer to OCC-617, Attachment 1, for the OMS details related to the outage event that occurred during the MS24D event.
  5. Page 19 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-618 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E - Standby) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 19. Please confirm that the workers on this invoice charged for being on standby from 6:00am through 10:00pm on March 11, 2024, and did not perform any work associated with this event. Response: The Asplundh crews referred to on page 19 should have billed the Company for “Work Time” for their hours on March 11, 2024, and incorrectly charged “Standby” instead. They had been directed to report to work at 6:00am for storm restoration, which triggers an automatic transition to “Work Time”. The crews in question were Service Crews. The storm did not materialize as expected, so Service Crews were not needed. However, since these crews are local to Central Connecticut, they were retained longer than other crews in case additional storm damage occurred to the system.
  6. Page 20 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-619 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 20. The times allocated in the “Work Distribution” section of the form overlap and cannot apply to all workers. Please explain how the Company verified that all workers listed on this form worked for 12 hours. Response: Please refer to Exhibit ACCT-2 (CLP-5) (MS24E), Outside Line Contractors, at Line 34, Asplundh Construction Corp, in amount of $259,165. A general foreman or similar position is responsible for a complement of workers who are often split into multiple crews. The general foreman coordinates the work of the group, aligning disciplines, qualifications, and equipment to address assigned events. In some cases, crews may work independently in two or three-person crews or otherwise combined to tackle larger, more complicated and time-consuming assignments. This can shift throughout the restoration event. Assignment by assignment details for each individual employee are not maintained in the Company’s systems. The External Resource Field Coordinator is in constant communication with the foreman or lead to keep track of restoration assignments and progress. They review each timesheet and, by signing off, confirms that the tasks performed and hours reported are accurate.
  7. Page 21 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-620 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 21. The description of the 10 hours of work performed by 8 workers and 7 trucks is “Transfer FTR set pole install new st light.” a. Please explain how this work is related to the storm and why the number of vehicles and number of workers was necessary. b. Please explain why the workers/vehicles billed for 10 hours but the start time was 6:30 and the end time was 11:00. If work was not performed at this location/job for the entire 10 hours, please explain what occurred for the remaining 5 ½ hours billed. Response: a. This work was performed under OMS event 5274974. A 911 ticket was received for a tree that fell during the storm, breaking a Frontier pole and bringing down primary wire. The Company’s crew assisted both with the tree removal and with the replacement of Frontier’s pole. When multiple spans of primary are down, this level of resources and coordinated effort is necessary to safely restore the system. b. The timesheet should be dated 3/11/2024, not 3/12/2024 as that was when the event described above in part (a) was addressed. Based on the Company’s review, the amount of work performed by this contractor during this time period is not accurately reflected on the timesheet. The tasks performed, including the one described above, as well as the time necessary to secure and clean-up the worksite, indicate that the 10 hours of billable time is reasonable and appropriate. Moreover, the work was overseen by the Company’s Field Resource Coordinator, who signed-off on this timesheet.
  8. Page 22 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-621 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 22-23. a. Please explain if “Car Vs pole Frontier pole…” was considered work associated with the storm and is included in the requested recovery. b. Please provide the cost associated with the “Car Vs. pole Frontier pole…” entries. Response: Referring to Exhibit ACCT-2 (CLP-5) (MS24E), Outside Line Contractors, at Line 34, Asplundh Construction Corp, in the amount of $259,165. a. The referenced vehicle accident occurred during the storm. The work associated with this incident was not included in the recovery request. b. The cost associated with this event is $6,738.
  9. Page 23 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-622 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 22. The times allocated in the “Work Distribution” section of the form overlap and cannot apply to all workers. Please explain how the Company verified that all workers listed on this form worked for 11 hours. Response: Referring to Exhibit ACCT-2 (CLP-5) (MS24E), Outside Line Contractors, at Line 34, Asplundh Construction Corp, in amount of $259,165. A general foreman or similar position is responsible for a complement of workers who are often split into multiple crews. The general foreman coordinates the work of the group, aligning disciplines, qualifications, and equipment to address assigned events. In some cases, crews may work independently in two or three-person crews or otherwise combined to tackle larger, more complicated and time-consuming assignments. This can shift throughout the restoration event. Assignment by assignment details for each individual employee are not maintained in the Company’s systems. The External Resource Field Coordinator is in constant communication with the foreman or lead to keep track of restoration assignments and progress. They review each timesheet and, by signing off, confirm that the events performed and hours reported are accurate.
  10. Page 24 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-623 Page 1 of 2 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 25. a. The start time indicated in box 6 is 5:30 am, however, the start time indicated in box 24 is 13:30. Further, the crew billed for 7 hours of standby and 10.5 hours of work time (two crew members billed for 9 hours of work time). Please reconcile the start times and the total work time. b. Please confirm that the only work performed during the 17.5 hours billed was the work from 17:00 to 12 am. Response: a. The crews were on standby from 05:30am until 12:30pm. The crews then went to their first call around 13:30 and the crews did not finish up their tickets until midnight. b. No, it is not accurate that the only work performed during the 17.5 hours billed was the work reflected from 17:00 to 12am. The crew received its first assignment at approximately 13:30. Upon responding to that assignment, the crew was unable to identify an outage or other issue requiring corrective work and immediately made itself available to Eversource for additional assignments. From that point forward, the crew remained mobilized, dedicated to Eversource restoration activities and available for dispatch as directed by the Company. The timesheet reflects an active field restoration associated with a specific ticket beginning at 17:00; however, the absence of other reference to a particular ticket during the intervening period does not mean that the crew was not working or was off duty and relieved of obligations to Eversource. Work is routinely performed that is not recorded with a particular ticket reference. The time descriptions reflected on the timesheet are intended to document the crew’s activity or status in relation to individual tickets and do not capture every activity occurring between assignments. Accordingly, the periods appearing as unaccounted for time between tickets cannot be interpreted to mean that the crew was not working or that such time should be billed at a standby rate. Standby rates do not apply during the workshift when the crews are actively

As listed on the current system

Corres. 10/01/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (0CC Set 16).