Discovery Compilation (0CC Set 16).
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation October 1 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 1 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 1 2026.pdf
OCC Set 16_COMBINED.pdf
PDF · 1.2 MB · 148 pagesText searchable
Download OCC Set 16_COMBINED.pdfRead the text of OCC Set 16_COMBINED.pdf
Search terms highlighted
Eversource rate increase is on 13 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 19 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-618 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E - Standby) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 19. Please confirm that the workers on this invoice charged for being on standby from 6:00am through 10:00pm on March 11, 2024, and did not perform any work associated with this event. Response: The Asplundh crews referred to on page 19 should have billed the Company for “Work Time” for their hours on March 11, 2024, and incorrectly charged “Standby” instead. They had been directed to report to work at 6:00am for storm restoration, which triggers an automatic transition to “Work Time”. The crews in question were Service Crews. The storm did not materialize as expected, so Service Crews were not needed. However, since these crews are local to Central Connecticut, they were retained longer than other crews in case additional storm damage occurred to the system.Page 20 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-619 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 20. The times allocated in the “Work Distribution” section of the form overlap and cannot apply to all workers. Please explain how the Company verified that all workers listed on this form worked for 12 hours. Response: Please refer to Exhibit ACCT-2 (CLP-5) (MS24E), Outside Line Contractors, at Line 34, Asplundh Construction Corp, in amount of $259,165. A general foreman or similar position is responsible for a complement of workers who are often split into multiple crews. The general foreman coordinates the work of the group, aligning disciplines, qualifications, and equipment to address assigned events. In some cases, crews may work independently in two or three-person crews or otherwise combined to tackle larger, more complicated and time-consuming assignments. This can shift throughout the restoration event. Assignment by assignment details for each individual employee are not maintained in the Company’s systems. The External Resource Field Coordinator is in constant communication with the foreman or lead to keep track of restoration assignments and progress. They review each timesheet and, by signing off, confirms that the tasks performed and hours reported are accurate.Page 21 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-620 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 21. The description of the 10 hours of work performed by 8 workers and 7 trucks is “Transfer FTR set pole install new st light.” a. Please explain how this work is related to the storm and why the number of vehicles and number of workers was necessary. b. Please explain why the workers/vehicles billed for 10 hours but the start time was 6:30 and the end time was 11:00. If work was not performed at this location/job for the entire 10 hours, please explain what occurred for the remaining 5 ½ hours billed. Response: a. This work was performed under OMS event 5274974. A 911 ticket was received for a tree that fell during the storm, breaking a Frontier pole and bringing down primary wire. The Company’s crew assisted both with the tree removal and with the replacement of Frontier’s pole. When multiple spans of primary are down, this level of resources and coordinated effort is necessary to safely restore the system. b. The timesheet should be dated 3/11/2024, not 3/12/2024 as that was when the event described above in part (a) was addressed. Based on the Company’s review, the amount of work performed by this contractor during this time period is not accurately reflected on the timesheet. The tasks performed, including the one described above, as well as the time necessary to secure and clean-up the worksite, indicate that the 10 hours of billable time is reasonable and appropriate. Moreover, the work was overseen by the Company’s Field Resource Coordinator, who signed-off on this timesheet.Page 22 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-621 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 22-23. a. Please explain if “Car Vs pole Frontier pole…” was considered work associated with the storm and is included in the requested recovery. b. Please provide the cost associated with the “Car Vs. pole Frontier pole…” entries. Response: Referring to Exhibit ACCT-2 (CLP-5) (MS24E), Outside Line Contractors, at Line 34, Asplundh Construction Corp, in the amount of $259,165. a. The referenced vehicle accident occurred during the storm. The work associated with this incident was not included in the recovery request. b. The cost associated with this event is $6,738.Page 23 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-622 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 22. The times allocated in the “Work Distribution” section of the form overlap and cannot apply to all workers. Please explain how the Company verified that all workers listed on this form worked for 11 hours. Response: Referring to Exhibit ACCT-2 (CLP-5) (MS24E), Outside Line Contractors, at Line 34, Asplundh Construction Corp, in amount of $259,165. A general foreman or similar position is responsible for a complement of workers who are often split into multiple crews. The general foreman coordinates the work of the group, aligning disciplines, qualifications, and equipment to address assigned events. In some cases, crews may work independently in two or three-person crews or otherwise combined to tackle larger, more complicated and time-consuming assignments. This can shift throughout the restoration event. Assignment by assignment details for each individual employee are not maintained in the Company’s systems. The External Resource Field Coordinator is in constant communication with the foreman or lead to keep track of restoration assignments and progress. They review each timesheet and, by signing off, confirm that the events performed and hours reported are accurate.Page 24 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-623 Page 1 of 2 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 25. a. The start time indicated in box 6 is 5:30 am, however, the start time indicated in box 24 is 13:30. Further, the crew billed for 7 hours of standby and 10.5 hours of work time (two crew members billed for 9 hours of work time). Please reconcile the start times and the total work time. b. Please confirm that the only work performed during the 17.5 hours billed was the work from 17:00 to 12 am. Response: a. The crews were on standby from 05:30am until 12:30pm. The crews then went to their first call around 13:30 and the crews did not finish up their tickets until midnight. b. No, it is not accurate that the only work performed during the 17.5 hours billed was the work reflected from 17:00 to 12am. The crew received its first assignment at approximately 13:30. Upon responding to that assignment, the crew was unable to identify an outage or other issue requiring corrective work and immediately made itself available to Eversource for additional assignments. From that point forward, the crew remained mobilized, dedicated to Eversource restoration activities and available for dispatch as directed by the Company. The timesheet reflects an active field restoration associated with a specific ticket beginning at 17:00; however, the absence of other reference to a particular ticket during the intervening period does not mean that the crew was not working or was off duty and relieved of obligations to Eversource. Work is routinely performed that is not recorded with a particular ticket reference. The time descriptions reflected on the timesheet are intended to document the crew’s activity or status in relation to individual tickets and do not capture every activity occurring between assignments. Accordingly, the periods appearing as unaccounted for time between tickets cannot be interpreted to mean that the crew was not working or that such time should be billed at a standby rate. Standby rates do not apply during the workshift when the crews are activelyPage 25 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-623 Page 2 of 2 engaged in the restoration effort over a range of support activities. The crew remained under Eversource’s direction and available to support restoration operations through the applicable billing period beginning at 05:30.Page 26 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-624 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E - Standby) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 27. This crew billed for only standby. Where did the standby occur? Response: The standby occurred at 364 Old Turnpike Rd., Southington, CT.Page 27 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-625 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 29. Please explain why the second entry did not have a ticket. Response: OMS tickets are generated when customers report outages or other issues. Additionally, damage in the field may require repairs even if no ticket was called in. In this case, the contractor saw a broken crossarm and damaged pole and called into the Company’s dispatch to fix the issue. The contractor was then instructed to make repairs and complete the work.Page 28 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-626 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E - Timesheets) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 45-48. Please explain why these timesheets differ from the template and how the Company verified the number of hours worked by each employee on each work order. Response: Please refer to Exhibit ACCT-2 (CLP-5) (MS24E), Outside Line Contractors, at Line 35, Asplundh Construction Corp, in amount of $6,988. Asplundh Construction Corp was tasked with performing post-storm follow-up work to address known issues in the field caused by the MS24E event. Even if the Company has resumed “normal operations,” the Company may need to keep storm contractors engaged to address potentially hazardous conditions, temporary fixes made during the storm to restore power to customers, and other activities necessary to return the system to its pre-storm condition. When dock crew contractors, like Asplundh Construction Corp, perform post-storm follow-up work after the ERP has been lifted, they follow the blue-sky billing process and charge the storm work order on a time and material basis. The blue-sky billing process does not have the same timesheet requirements as those applicable during the ERP. The work is assigned by the Area Work Center Management team and during the invoice review process, the work details are reviewed by the Operations Manager to ensure accuracy of billing.
As listed on the current system
Corres. 10/01/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (0CC Set 16).