Discovery Compilation (0CC Set 16).
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation October 1 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 1 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 1 2026.pdf
OCC Set 16_COMBINED.pdf
PDF · 1.2 MB · 148 pagesText searchable
Download OCC Set 16_COMBINED.pdfRead the text of OCC Set 16_COMBINED.pdf
Search terms highlighted
Eversource rate increase is on 13 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 24 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-623 Page 1 of 2 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 25. a. The start time indicated in box 6 is 5:30 am, however, the start time indicated in box 24 is 13:30. Further, the crew billed for 7 hours of standby and 10.5 hours of work time (two crew members billed for 9 hours of work time). Please reconcile the start times and the total work time. b. Please confirm that the only work performed during the 17.5 hours billed was the work from 17:00 to 12 am. Response: a. The crews were on standby from 05:30am until 12:30pm. The crews then went to their first call around 13:30 and the crews did not finish up their tickets until midnight. b. No, it is not accurate that the only work performed during the 17.5 hours billed was the work reflected from 17:00 to 12am. The crew received its first assignment at approximately 13:30. Upon responding to that assignment, the crew was unable to identify an outage or other issue requiring corrective work and immediately made itself available to Eversource for additional assignments. From that point forward, the crew remained mobilized, dedicated to Eversource restoration activities and available for dispatch as directed by the Company. The timesheet reflects an active field restoration associated with a specific ticket beginning at 17:00; however, the absence of other reference to a particular ticket during the intervening period does not mean that the crew was not working or was off duty and relieved of obligations to Eversource. Work is routinely performed that is not recorded with a particular ticket reference. The time descriptions reflected on the timesheet are intended to document the crew’s activity or status in relation to individual tickets and do not capture every activity occurring between assignments. Accordingly, the periods appearing as unaccounted for time between tickets cannot be interpreted to mean that the crew was not working or that such time should be billed at a standby rate. Standby rates do not apply during the workshift when the crews are activelyPage 25 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-623 Page 2 of 2 engaged in the restoration effort over a range of support activities. The crew remained under Eversource’s direction and available to support restoration operations through the applicable billing period beginning at 05:30.Page 26 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-624 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E - Standby) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 27. This crew billed for only standby. Where did the standby occur? Response: The standby occurred at 364 Old Turnpike Rd., Southington, CT.Page 27 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-625 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 29. Please explain why the second entry did not have a ticket. Response: OMS tickets are generated when customers report outages or other issues. Additionally, damage in the field may require repairs even if no ticket was called in. In this case, the contractor saw a broken crossarm and damaged pole and called into the Company’s dispatch to fix the issue. The contractor was then instructed to make repairs and complete the work.Page 28 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-626 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E - Timesheets) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 45-48. Please explain why these timesheets differ from the template and how the Company verified the number of hours worked by each employee on each work order. Response: Please refer to Exhibit ACCT-2 (CLP-5) (MS24E), Outside Line Contractors, at Line 35, Asplundh Construction Corp, in amount of $6,988. Asplundh Construction Corp was tasked with performing post-storm follow-up work to address known issues in the field caused by the MS24E event. Even if the Company has resumed “normal operations,” the Company may need to keep storm contractors engaged to address potentially hazardous conditions, temporary fixes made during the storm to restore power to customers, and other activities necessary to return the system to its pre-storm condition. When dock crew contractors, like Asplundh Construction Corp, perform post-storm follow-up work after the ERP has been lifted, they follow the blue-sky billing process and charge the storm work order on a time and material basis. The blue-sky billing process does not have the same timesheet requirements as those applicable during the ERP. The work is assigned by the Area Work Center Management team and during the invoice review process, the work details are reviewed by the Operations Manager to ensure accuracy of billing.Page 29 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-627 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 52. Please explain why standby work performed at the Torrington WC on March 28, 2024, was charged to the MS24E event. Response: MS24E brought widespread heavy rain that saturated the soil and was immediately followed by strong northwest wind gusts, causing trees to uproot and damage to occur across the Company’s service territory. The specific work performed by this vendor was a post-storm patrol tasked with identifying and repairing any remaining storm-related damage. The tasks performed by this contractor in furtherance of this objective included replacing multiple severed crossarms, removing large limbs off of the power lines, replacing lightning arrestors and re-hanging primary that was floated to temporarily restore power. The contractor was engaged and dispatched by the Company to perform these specific tasks and should have billed the Company at the applicable working rate. Instead, the contractor inadvertently billed the Company at the standby rate.Page 30 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-628 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 53-63. The work associated with this invoice was performed on March 18-20, 2024. Please explain how the Company verified the work resulted from event MS24E. Response: Please refer to Exhibit ACCT-2 (CLP-5)(MS24E), Outside Line Contractors, at Line 37, Asplundh Construction Corp, in amount of $5,521. The charges on this invoice are related to post storm repairs after post storm patrols were completed. Repairs included replacing cross arms and vice tops. Please refer to OCC-628, Attachment 1, for the results of the patrol findings in the western region of the state that include the job locations associated with the Asplundh Construction Corp invoice.Page 31 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-629 Page 1 of 1 Date Filed: September 24, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 65-66. Please confirm that this crew was on standby throughout March 11 and March 12, 2024, performed no work, and was paid overtime. Response: The tree crew worked a 16-hour overnight shift which was billed as work time at the overtime rate as it was outside the standard work schedule hours. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.Page 32 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-630 Page 1 of 1 Date Filed: September 24, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-01) (MS24E) p. 67-72. The timesheets were corrected to reflect time billed to MS24E rather than MN24F. Please explain: a. Who corrected the timesheets? b. On what basis (what evidence) were the timesheets corrected to bill these crews who incurred nothing but standby expenses on March 12 to MS24E? Response: a. The Eversource Arborist corrected the timesheet. b. The Arborist corrected the timesheet based on their knowledge of what day the tree crew worked and the associated storm event FWO. The tree crew was placed on storm shift at the direction of Eversource Operations.Page 33 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-631 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to the Response to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 218-254. a. Did the vendor Central Connecticut Cable Company perform any work or did they bill for standby for the two days? b. If they billed for work, please indicate where the work was noted on their timesheets. Response: a. During restoration events, the Company relies on underground contractors to assist with direct buried issues as well as major underground cable outages. Their expertise can help significantly reduce outage times when underground issues occur. For this storm specifically, the Company (fortunately) did not experience any major cable faults or underground issues that required Connecticut Cable to be deployed. Accordingly, Connecticut Cable charged standby for the duration of the storm. b. N/A.
As listed on the current system
Corres. 10/01/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (0CC Set 16).