Discovery Compilation (0CC Set 16).
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation October 1 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 1 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 1 2026.pdf
OCC Set 16_COMBINED.pdf
PDF · 1.2 MB · 148 pagesText searchable
Download OCC Set 16_COMBINED.pdfRead the text of OCC Set 16_COMBINED.pdf
Search terms highlighted
Eversource rate increase is on 13 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 51 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-639 Page 3 of 3 beginning their first job of the day, the crews eat a meal, conduct safety briefings, perform U.S. Department of Transportation mandated pre-trip inspections on their trucks, and restock their trucks as necessary with material needed for their day. This takes time and the crews are methodical because they don’t want to get out into the field without the right equipment or materials. The crews start the work shift by driving from their hotel rooms to the job site and depending on the availability of hotel rooms, that can add an additional 30 minutes or more. At the end of their last job of the day, the crews are required to clean up their job site, properly store all equipment and tools, eat a meal after performing physical labor all day in situations where their personal safety is continually at risk and often in unforgiving conditions; and drive back to their hotel rooms, which again, could be 30 minutes or more away from the jobsite. Therefore, intervals of time at the start and end of the work shift and between restoration “events” is an expected and necessary part of the work shift, for which the crews are paid. Within a work shift, the crews do not get paid differently for different types of work. Therefore, from a field perspective, the start and stop time is the critical datapoint for the timesheet. b. Refer to p. 4495 of OCC-044, Attachment 2 CONFIDENTIAL, Exhibit A - Pricing Schedule. Emergency Response Working Rates for Labor are defined as the agreed labor rates payable from the commencement of applicable Emergency Response Work through to termination of such Emergency Response Work, excluding rest time during the Emergency Response Work. The crews were not in a period of rest or otherwise unavailable to perform work. Accordingly, the Company considers this time to constitute payable Working Time, consistent with the contractual definition of Emergency Response Working Rates, rather than standby time.Page 52 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-640 Page 1 of 2 Date Filed: September 24, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (Storm MN25K – Tree Crews) Refer to Exhibits ACCT-2 (CLP-13A-9) (MN25K), ACCT-2 (CLP-13A-10) (MN25K), and ACCT-2 (CLP-13A-11) (MN25K). The following pertains to invoices from Lewis Tree Service Inc: a. Exhibits ACCT-2 (CLP-13A-9) (MN25K), ACCT-2 (CLP-13A-10) (MN25K), and ACCT2 (CLP-13A-11) (MN25K) - Several invoices (ex. invoice #445493p. 154 Exhibit ACCT2 (CLP-13A-10) (MN25K)) note hours recorded within the Tree Contractor Work Location report on days that were not charged per the invoice and weekly operations summary report. How did the Company validate the work performed by these crews and the hours charged given inconsistency between the reports? b. Exhibits ACCT-2 (CLP-13A-9) (MN25K) and ACCT-2 (CLP-13A-10) (MN25K) - Several invoices (ex. invoice #445115 p. 80 on Exhibit ACCT-2 (CLP-13A-10) (MN25K)) indicated standby time for the hours charged by the crew. Per review of the vendor contract provided as part of OCC-044, Attachment 2 CONFIDENTIAL, p. 3228, “Standby Rates apply to labor resources only”. Given this information, explain the reason for allowing equipment to be charged for the time crews were on standby when the contract allows for only labor. If additional information was considered at the time of the invoice and related to the equipment hours, please provide. How did the Company track the hours held on standby for those crews that only recorded a portion of their time to standby? c. Exhibit ACCT-2 (CLP-13A-11) (MN25K) – Per review of invoices (ex. invoice #446544 p. 56), hours were charged for work performed 5-16 days after the storm event had occurred per Exhibit CLP-STORM-IMT-3 (Event 13-MN25K). How did the Company ensure that the hours charged, and work performed by these crews were related to the storm event? If additional information was provided at the time of deployment or receipt of invoice to validate the work performed in relation to storm MN25K, please provide. Response: a. Tree Contractor Emergency Response Work Location sheets are used to document field locations for storm-related utility tree work. Crews may record multiple days, work activities, or storm-related assignments on a single sheet, as there is no requirement to maintain separate location sheets by day, work type, or storm event. Company arborists oversee storm tree work activities and have the operational knowledge necessary to associate documented work with the applicable storm event. When reviewed alongsidePage 53 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-640 Page 2 of 2 timesheets, these location sheets provide sufficient documentation to accurately identify, verify, and allocate storm-related work and costs. b. The applicable Vegetation Management contract does not establish a separate billing rate for “Standby Time.” Rather, the contract provides that compensation for Emergency Response Work is in accordance with the Agreement rates for Work. The Special Conditions part of vegetation management contract outlines what work will be billable under various circumstances. The applicable Emergency Response Work provisions require the Contractor to provide qualified resources and equipment upon issuance of an Emergency Response Work Release. The contract further provides that, during emergency restoration, “all crews and equipment shall remain on the property during emergency restoration, unless released by the Owner’s Representative.” The contract also states that resources working on the system are expected to remain available for storm and emergency response for the entire system. Because the Vegetation Management contract does not establish a separate “Standby” billing rate, the premise that equipment was charged under a standby rate applicable only to labor resources does not apply to this contract. c. Company arborists track post-storm vegetation damage locations through customer and municipal notifications, field observations, and post-storm patrols. Storm-damaged trees are documented, assessed, and scheduled for remediation based on priority, site conditions, resource availability, equipment requirements, and any necessary planned outages. The Company arborist is responsible for verifying that the work is associated with documented storm-related vegetation damage and occurred at an identified post-storm location. Approval of the contractor timesheet by the Company arborist confirms that the work was attributable to the storm event and eligible for storm-related accounting. This review process ensures that post-storm vegetation work is appropriately tracked, validated, and charged to the applicable storm event.Page 54 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-641 Page 1 of 1 Date Filed: September 24, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (Storm MN25K – Tree Crews) Refer to Exhibit ACCT-2 (CLP-13A-8) (MN25K). The following pertains to invoices from Distinctive Gardens & Tree Care LLC (p. 31-52): a. Per review of the vendor contract provided as part of OCC-044, Attachment 2 CONFIDENTIAL p. 1000-1127, the contract indicates different rates for 2025 than those applied on the invoices. Provide context on whether any additional factors or considerations were applied in calculation of the rates. b. The hours charged per invoices did not align to the hours recorded per the Tree Crew Time Sheet reports. Was the differential attributable to standby time or another non-work function? Were the time sheets completely properly by the crew/vendor? How did the Company validate the work performed by these crews and the hours charged? Response: a. The Distinctive Gardens and Tree Care LLC crews that supported this Connecticut storm response had been working under the transmission vegetation management program in Connecticut. The rates match the contracted transmission rates for this vendor for 2025. Please refer to OCC-641, Attachment 1. b. Yes, time sheets were completed properly by the vendor. The Tree Crew Time Sheet was used in lieu of the Eversource Connecticut Emergency Restoration Tree Contractor Work Location form as these were transmission system tree crews. Similar to outsource tree crews, they are not required to use the distribution specific Eversource Connecticut Emergency Restoration Tree Contractor Work Location form. The billable hours are the ones listed on the Eversource Connecticut Weekly Operations Report which is the timesheet. The Eversource Arborist supervising these crews confirmed the timesheet information was correct when they signed the timesheet.Page 55 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-642 Page 1 of 1 Date Filed: September 24, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Consumer Counsel Question: (STORM MN25K – Food & Lodging) Refer to Exhibit ACCT-2 (CLP-13A-17) (MN25K). Invoice #7690, p. 244-245, noted food for the date 2/18/24. Please confirm if this is correct. If the date is correct, why was it included in the storm event MN25K? Response: Upon review, it was identified that Paul Gregory’s submitted an invoice with an incorrect service date. Please refer to OCC-642, Attachment 1, for documentation validating the request for services performed on February 18, 2025.Page 56 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-643 Page 1 of 1 Date Filed: September 24, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Consumer Counsel Question: (STORM MN25K – Food & Lodging) Refer to Exhibit ACCT-2 (CLP-13A-17) (MN25K). Invoice #00401, p. 247, noted an order date of 2/18/25 and invoice date of 2/20/25, however a payment due date of 12/31/24. Please confirm which dates are correct. If the payment due date is correct, why was this invoice included in the storm event MN25K? Response: Please refer to Exhibit ACCT-2 (CLP-13A-17) (MN25K). Invoice #00401, p. 247, upon further review of Invoice #00401 submitted by Perk on Main, LLC, it was confirmed with the vendor that the payment due date of 12/31/2024 listed on the invoice was incorrect. The vendor verified that the correct date associated with the service request is the order date of 2/18/2025. Please refer to OCC-643, Attachment 1, which provides supporting documentation confirming the Company’s request for the vendor services referenced on the invoice.Page 57 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-644 Page 1 of 2 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MN25K – Civil Crews) Refer to Exhibits ACCT-2 (CLP-13A-6) (MN25K), and ACCT-2 (CLP-13A-7) (MN25K). The following pertains to invoices from Charter Oak Utility Constructors Inc.: a. Several invoices and Excavation Job Forms documents work performed under work order #RPEU0011 (ex. Invoice #39513). Provide additional context and explain how this work order relates to storm MN25K. If this work order number does not relate to the storm event, why was this included within the storm recovery costs? b. Per review of invoice #39459, the Excavation Job Form was submitted on 2/18/25, however, the work was performed on 1/23/25. Explain how the work performed within this form relates to storm MN25K given the work was performed prior to the start of the storm event. c. Per review of invoice #39677 and #39990, the work performed was after the storm event. Explain and provide additional support to indicate that the work performed per these invoices related to storm MN25K given the dates documented per the Excavation Job Forms. d. Per review of invoice #40098, the Excavation Job Form indicated this work was performed under work order #RPEU0011 and was performed on 6/13/25. Provide additional context and explain how this work order relates to storm MN25K. e. Per review of invoice #40260, the Excavation Job Form has handwritten notes indicating the work performed was related to storm MN25K. Provide additional context and explain how the Eversource approver verified that the work performed related to storm MN25K. Is there any additional information logged that noted the delay by Cox and Frontier as to why this crew was deployed in June to fix the pole? Response: Referring to Exhibit ACCT-2 (CLP-13)(MN25K), Outside Line Contractors, lines 206-228, Charter Oak Utility Constructors Inc, in the total amount of $67,314.Page 58 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-644 Page 2 of 2 a. If the vendor isn’t given a specific work order to charge their costs to, they will use one of the generic expense work orders the Company has provided in the past. When the vendor submits their invoice, the Administration Group that processes them assigns the correct accounting to the invoices, which would be MN25K in this case. b. While preparing this response, it was determined that this charge under invoice #39459 is not related to the storm event. The Company will supplement Exhibit ACCT-2 (CLP13)(MN25K), to remove line 217 in the amount of $2036. c. Invoice #39990 relates to post-storm follow-up work performed to re-seed a property on Adna Road, Bristol, CT, associated with outage Event 5604323, which originated during the MN25K event on February 17, 2025. Please refer to OCC-644, Attachment 1 CONFIDENTIAL, for the OMS details supporting these charges. Invoice #39677 relates to restoration of a work area following restoration activities performed on March 6, 2025, during the MN25M event. Please refer to OCC-644, Attachment 2 CONFIDENTIAL, for the OMS details associated with the MN25M event. Upon further review, the Company determined that the $4,146 charge currently included on line 225 of Exhibit ACCT-2 (CLP13)(MN25K), is attributable to the MN25M event. Accordingly, the Company will supplement Exhibit ACCT-2 (CLP-13)(MN25K), to remove the $4,146 charge and will supplement Exhibit ACCT-2 (CLP-14)(MN25M), to include the $4,146 charge under the appropriate storm event. d. While preparing this response, it was determined that this charge under invoice #40098 is not related to the storm event. The Company will supplement Exhibit ACCT-2 (CLP13)(MN25K), to remove line 227, in the amount of $293. e. The customer at 133 School St., is fed from a pole line coming from another street behind the property into the backyard of house 133. The pole with the transformer feeding the house broke during the storm, requiring the Company to drive across the customer’s lawn to access the location and replace the pole. While all electric repairs were completed at that time, as the custodian of the pole, the Company is required to access the property again to remove the remnants of the old pole. In accessing the property, the lawn suffered damage (ruts) that required remediation. Due to the amount of restoration that would be needed after each utility accessed the location, it was determined that the best course of action was to wait until all work was completed to make repairs. The Company at several points reached out to Cox and Frontier between the storm date and June to shift their facilities to the new pole.Page 59 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-645 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MN25K – Civil Crews) Refer to Exhibit ACCT-2 (CLP-13A-8) (MN25K). The following pertains to invoices from HI Stone & Son, Inc. Per review of these invoices, there is no submission date, work date, work completion date, signature by the contractor, or signature by the Eversource approver. Explain how the Company verified the invoices and work performed by these crews without reviewing the work or having a reference date. If additional support or information is to be considered regarding this work, please provide. Response: Referring to Exhibit ACCT-2 (CLP-13) (MN25K), Outside Contractors, lines 269 through 278, vendor HI Stone & Son, Inc, invoices totaling in the amount of $3,719. Upon further review in drafting this response, the Company determined that these costs are not associated with the event. The Company will supplement ACCT-2 (CLP-13) (MN25K), to remove lines 269 through 278 in the amount of $3,719.Page 60 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-646 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MN25K - Civil Crews) Refer to Exhibit ACCT-2 (CLP-13A-8) (MN25K). The following pertains to invoices from Henkels & McCoy Inc. a. Per review of invoice #402951, the scope of work section of the Excavation Job Form notes ‘2/14/25 callout for hand digging crew to expose secondary fault 2/15/25 backfill and clean up site after completed splice’ indicating that the work performed per this form was on 2/14/25 and 2/15/25 prior to the start of the storm. Why was the work documented on this form considered as part of storm MN25K if the work was performed on 2/14/25 and 2/15/25? b. Per review of invoice #414259, the scope of work section of the Excavation Job Form notes ‘5/6/25 loam and hydroseed restoration from callout to expose secondary fault on 2/24’. Explain how this work is related to MN25K and if not, why was this considered part of storm MN25K? Response: Please refer to Exhibit CLP-13 (MN25K), Outside Contractors-Vendors, lines 30 and 32, vendor Henkels & McCoy Inc, two invoices totaling in the amount of $2,757. Upon further review in drafting this response for subsection a and b, the Company determined that these charges are not related to MN25K. The Company will supplement Exhibit CLP-13 (MN25K) to remove lines 30 and 32 in the amount of $2,757.
As listed on the current system
Corres. 10/01/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (0CC Set 16).