Discovery Compilation (0CC Set 16).
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation October 1 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 1 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 1 2026.pdf
OCC Set 16_COMBINED.pdf
PDF · 1.2 MB · 148 pagesText searchable
Download OCC Set 16_COMBINED.pdfRead the text of OCC Set 16_COMBINED.pdf
Search terms highlighted
Eversource rate increase is on 13 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 61 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-647 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MN25K - Civil Crews) Refer to Exhibit ACCT-2 (CLP-13A-9) (MN25K). The following pertains to invoices from KTI Utility Construction & Maintenance LLC. Provide additional evidence indicating approval of the work by an Eversource representative to confirm that the work was actually performed on these dates by the crews or evidence indicating deployment of these crews. How was the Company comfortable with the work performed per these invoices? Did the Company keep track of the deployment of these crews and their assignments throughout the storm? If so, would you provide that evidence? Response: Please refer to Exhibit ACCT-2 (CLP-13) (MN25K), Outside Line Contractors, at Lines 88-96, KTI Utility Construction & Maintenance LLC, in amount of $110,886. The Company has a record of trouble calls in its Outage Management System (OMS). Specific to KTI Utility Construction & Maintenance, their timesheets reflect work performed between 2/25/2025 and 2/27/2025 on events covered by the storm code MN25K. 32 Lauder Lane in Greenwich corresponds to Event 5608180, which contains completion remarks indicating a contractor set a pole and repaired electrical facilities in response to a broken pole 80186 on Lauder Lane. This information matches the work described as completed on their timesheet. 6 School House Road in Roxbury corresponds to Event 5609319, which contains completion remarks indicating an issue involving primary wire and a transformer in a right of way, which aligns with the remarks on the contractor’s timesheet. Schoolhouse Road intersects with Tophet Road, where the trouble event is identified to originate from. 3 Council Drive in Oxford corresponds to event 5604706 which indicates a pole was found to be broken near the base due to a tree limb falling on the line and was temporarily braced during the storm. This timesheet covers the permanent repairs made after the storm was completed to hand dig and set a new pole and anchor.Page 62 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-648 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MN25K - Civil Crews) Refer to Exhibits ACCT-2 (CLP-13A-12) (MN25K) and ACCT-2 (CLP-13A-14) (MN25K). The following pertains to invoices from McAllen Construction Inc. a. Per review of invoice #222025, the amount related to work order #MN25K011 was $1456.08, however, $2,548 was recorded per Exhibit ACCT-2 (CLP-13) (MN25K) Confidential). Please help to reconcile the balance between the two amounts and if additional support should be considered related to this invoice, provide that support. b. Per review of invoices #212025 and #282025, there is no work order number that relates to storm MN25K. Explain how these invoices relate to the storm event MN25K and if additional support should be considered related to these invoices, provide that support. Response: a. Referring to Exhibit ACCT-2 (CLP-13A-12) (MN25K), Outside Contractors, line 532, vendor McAllen Construction Inc, invoices totaling in the amount of $2,548.00. Upon further review in drafting this response, the Company determined that these costs are not associated with the event. The Company will supplement ACCT-2 (CLP-13) (MN25K), to remove lines 532 in the amount of $1,092.06. b. Please refer to OCC-648, Attachment 1, for the OMS details related to MN25K on invoice #212025. In addition, please refer to OCC-648, Attachment 2, for the OMS detail related to MN25K on invoice #282025. The Company hired McAllen Construction Inc. to perform repairs during the storm event for both invoices.Page 63 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-649 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MN25K - Civil Crews) Refer to Exhibit ACCT-2 (CLP-13A-1) (MN25K). The following pertains to invoices from AJ Penna & Son: a. Per review of invoice #23637, a portion of the invoice was for work performed on 2/11/25 prior to the start of the storm event. How does the Company consider this work to be a part of the storm MN25K? b. For invoice #23637, provide the excavation job form for the dates work was performed. If no excavation job form, provide additional evidence indicating the Company requested a deployment of these civil crews on the dates work was performed. Who was responsible for the deployment of these crews for snow plowing and how was the work tracked by the Company? c. Per review of invoice #23687, a request was made for the work performed on the excavation job form, however, the work was not approved by an Eversource approver. How did the Company gain comfort over the work performed by this civil crew? Response: a. Please refer to Exhibit ACCT-2 (CLP-13A-1) (MN25K), Outside Contractors, line 33, vendor A J Penna & Son, invoices totaling in the amount of $14,415. Upon further review in drafting this response, the Company determined that these costs are not associated with the event. The Company will supplement ACCT-2 (CLP-13) (MN25K), to remove lines 33 in the amount of $14,415. b. Please refer to the response to part a. above. c. Event 5592688 occurred during MN25K (2/16/2025) where a large tree came down and broke a pole, handhole, and took down wires in a customer’s driveway. AJ Penna was hired after the storm to replace this broken handhole. This is directly from the storm damage.Page 64 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-650 Page 1 of 2 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MN25K – Line Crew) The following pertains to the responses provided as part of OCC409 and the respective invoice #IN0001536-R3 for Atlantic Power Constructors LLC. a. Considering the response provided in subpart (c) of OCC-409 and invoice #IN0001536-R3 and that the crew’s final job for the day ended at 5:00 PM, explain the time spent traveling back to the hotel for the day and the time taken to have the evening meal. Did the Company record this information given the crew was released earlier than the end of the workday? How did the Company ensure the time charged related to this timesheet and invoice was appropriately considered work time and not standby time? Please explain how the crew had continued use for the equipment once it arrived at the hotel location and how those hours spent at the hotel before the end of the workday should not be considered standby time. If the definition of work time is included within the contract provided in OCC-44, provide reference. b. Considering the response provided in subpart (e) of OCC-409, is breakfast, communication and coordination with Company Dispatcher, safety briefings, and stocking of trucks before the first assignment considered work time or standby time? If the definition of this work is documented within the vendor contract provided in OCC-044, provide reference. If these activities are held at the hotel or AWC, please explain how the equipment had yet been utilized for the day and why the time spent on these activities should not be considered standby time. Response: a. This question was addressed during the Tier 3 review process and the response given by the Contractor to account for the additional working time from 5pm to 10pm was broken down as follows: Crews did not receive hotel information until around 7pm (5pm to 7pm). The hotels were almost 2 hours away from last job site location and they stopped for dinner on the way (7pm – 8pm dinner) then (8pm-10pm drive). As per the applicable contract, once the crew has received the first ticket, the crew is no longer subject to being put on “Standby.” Therefore all hours after the first ticket are “Working” hours.Page 65 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-650 Page 2 of 2 Please refer to OCC-044, Attachment 2 CONFIDENTIAL, at page 636, where “Emergency Response Working Rates for Labor” is defined as “the agreed upon labor rates payable from the commencement of applicable Emergency Response Work through the termination of such Emergency response Work, excluding rest time during that Emergency Response Work.” b. The Company does not interpret “Standby” as a description of every period during which a contractor resource or piece of equipment is not actively performing a specific field task. Rather, “standby” is a contractual rate classification that applies under the circumstances established by the applicable agreement. In this instance, the contractor had received notification to begin the workday, and the resources were mobilized and committed to Company operations. Accordingly, activities associated with preparing for and supporting those assignments, including communication and coordination with the Company Dispatcher, required safety briefings, preparation or stocking of trucks, and meal periods occurring within or between assigned work activities, were treated as part of the contractor’s active workday and compensated at the applicable working rates. A meal period does not, by itself, place the crew or associated equipment into standby status where the resources remain mobilized, committed to Company work, and are continuing or preparing to continue assigned activities. Similarly, the fact that certain activities may occur at a hotel, Area Work Center (“AWC”), staging location, or other location before the crew reaches a specific field assignment does not, by itself, place the personnel or equipment into a contractual standby status. Once assigned and mobilized, the equipment is committed to the Company’s work and may be required for pre-job preparation, transportation of personnel and materials, safety activities, mobilization to the work location, and execution of assignments. Equipment therefore does not need to be physically operating during all work activities in order for the applicable working rate to apply. Here, because the contractor had received assignments to begin Company work, the time was treated under the applicable working rates rather than the contractual standby.Page 66 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-651 Page 1 of 2 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Consumer Counsel Question: (Storm MN25K – Line Crew) The following pertains to the responses provided as part of OCC411 and the respective invoice #250012 for Conexus Energy Group LLC. Considering the response provided in subpart (a) of OCC-411, if the workday started at 12:00 PM and the crew did not receive their first job until 2:00 PM, wouldn’t this time be considered standby time? Explain how the 2 hours before deployment to the first job should be considered work time. If the definition of this time is documented within the vendor contract provided in OCC-044, provide reference. Response: The crews are in “working” status for the entire duration of their shift – from start to finish. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet. Once a contractor has begun their day and is ready to work at a Eversource-designated location, the contractor is compensated at the applicable working rate. This remains the case even if the contractor is temporarily “standing by” while waiting for a work assignment/work ticket. The contractor is paid at standby rates only when they have not yet been directed to report to an Eversource-designated location and remain at their hotel or home show-up location because circumstances prevent restoration efforts from beginning (e.g., high wind, additional adverse weather conditions, etc). In other words, once a contractor has reported to the designated work location and is available to perform work, any time awaiting dispatch is compensated at the working rate. It is rare that Eversource would have a contractor remain in their hotel or home show-up location without a release.Page 67 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-651 Page 2 of 2 Refer to OCC-044, Attachment 2 CONFIDENTIAL, p.880, Exhibit A-Pricing Schedule, which defines Emergency Response Working Rates as “the agreed labor rates payable from the commencement of applicable Emergency Response Work through the termination of such Emergency Response Work, excluding rest time during that Emergency Response Work.”Page 68 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-652 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Consumer Counsel Question: (Storm MN25K – Line Crew) The following pertains to the responses provided as part of OCC412 and the respective invoice #250011 v1 for Conexus Energy Group LLC. a. Considering the response provided in subpart (a) of OCC-412, explain how the time allocated to safety briefing, onboarding, and meal is considered travel and not considered standby time and cite to all specific applicable contractual provisions. b. Considering the response provided in subpart (f) of OCC-412, please cite to applicable contract provisions and explain why the crew’s time being retained until the end of their shift without any scheduled work is considered work time instead of standby time. If the definition of this work is documented within the vendor contract provided in OCC-044, provide reference. Response: a. In this instance these hours were billed at Working Rates, not Travel/Standby Response Rates, however, the contractor provided the Mobilization Time sheet, not the Working Time sheet, which was an administrative error. The applicable Travel/Mobilization and Standby activities are compensated under a combined Travel/Standby Time Rate, such that the applicable rate for travel and standby periods is the same. This is reflected in OCC-044, Attachment 2 CONFIDENTIAL, p. 884. Please refer to OCC-044, Attachment 2 CONFIDENTIAL, p. 881, which defines Travel/Mobilization as the time Contractor crews leave the Contractor's point of origin (staging area) and arrive at the Company's designated location, including processing at a Company receiving center, if required. The provision further addresses mobilization to a restoration event and circumstances in which crews are requested to stand by at the Contractor's base or hotel, providing that travel hours are paid at the Travel/Standby Time Rate applicable to the job classification in Schedule A. The Company considers Standby Time to be the period during which crews have been requested to remain available for deployment but have not yet been activated and assigned work. The company recognizes that this is not explicitly defined in the governing contract, butPage 69 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-652 Page 2 of 2 past practice has been for crews who are completing safety briefings or general onboarding prior to any work being assigned would be on Standby Time, however, if emergency response work has been assigned or the crews have been otherwise activated these activities would be classified as Working Time. b. The crews were retained through the end of their scheduled shift because the Company determined that maintaining the crews' availability was necessary given the circumstances of the emergency restoration event. Please refer to OCC-044, Attachment 2 CONFIDENTIAL, p. 877, Section 8-Schedule, which provides that Emergency Response Work shall begin as specified in each Emergency Response Work Release and shall end when the Company releases the Contractor from restoration work through the Owner's Representative. In this instance, the Company did not release the crews from the Emergency Response Work prior to the end of their scheduled shift. The crews therefore remained engaged and available to perform restoration work until they were released by the Company. Accordingly, the time was treated as Work Time rather than Standby Time. The decision to retain the crews reflected the Company's operational determination during the emergency event that their continued availability was warranted.Page 70 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-653 Page 1 of 2 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Consumer Counsel Question: (Storm MN25K – Line Crew) The following pertains to the responses provided as part of OCC413 and the respective invoice #J002315 for Holland Power Services Inc. Considering the response provided in subpart (a) of OCC-413, should the activities described be considered standby time? If the crews are performing these tasks without the need for equipment, please explain why that should not be considered standby time instead of work time. Please explain and cite to the applicable contract provisions regarding whether work time begins when the crew is assigned to the first job of the day. Response: No, the activities should not be described as “standby” time. Please refer to page 8 of OCC-653, Attachment 1, Exhibit A-Pricing Schedule. The contract defines Emergency Response Working Rates for Labor as the agreed labor rates payable from the commencement of applicable Emergency Response Work through the termination of such Emergency Response Work, excluding rest time during the Emergency Response Work. The Pricing Schedule referenced in this response was inadvertently omitted from the Company’s OCC-044 submission. The corresponding contract, CW2292858, begins on pp. 2714 of OCC-044, Attachment 2. In this instance, the crews arrived at an Eversource staging area and were ready, willing and able to begin Emergency Response Work upon instruction. The crews were not in a period of rest or otherwise unavailable to perform work. Accordingly, this time is payable Working Time, consistent with the contractual definition of Emergency Response Working Rates, rather than standby time. Standby Time is a period during which crews are directed to remain available pending deployment or further instruction and are not actively engaged in Emergency Response Work. In contrast, the activities at issue occurred after the crews reported to the designated staging location and were participating in the emergency response process in a ready and available status. Accordingly, this time is Standby Time.
As listed on the current system
Corres. 10/01/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (0CC Set 16).