Discovery Compilation (0CC Set 16).
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation October 1 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 1 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 1 2026.pdf
OCC Set 16_COMBINED.pdf
PDF · 1.2 MB · 148 pagesText searchable
Download OCC Set 16_COMBINED.pdfRead the text of OCC Set 16_COMBINED.pdf
Search terms highlighted
Eversource rate increase is on 13 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 74 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-654 Page 3 of 3 b. The timesheets are not a contemporaneous record of every minute, task, or discrete activity undertaken by a crew in the course of performing its work. Nor is the timesheet the method by which the Company manages the crews or assures that the crew is working how and where they are supposed to be. The timesheets are used to document the time worked and general nature of the work performed. Timesheets are typically completed at the end of each workday, with time allotted to the major work assignments completed that day. Given the nature of storm restoration work, it would be impractical and inconsistent with the crews’ primary responsibility of safely and efficiently restoring electric service to require personnel to contemporaneously record every minute task or discrete activity performed throughout the workday. The Company manages the crews through the oversight of the employee dispatching the crews and the External Field Resource Coordinator (EFRC), who is physically in the field with the crews, ensuring that the crews are properly engaged and assigned work to restore the system from storm damage. The linemen who are filling out the timesheets are primarily focused on ensuring that their crews are working safely in a dynamic environment that is full of potentially lethal hazards. The EFRC is the Company representative that is responsible for signing the timesheets and they have personal knowledge of the work that the crews have performed and the activities they have engaged in, particularly in relation to the hours stated in boxes 6 and 7. Importantly, the crews are in “working” status, for the entire duration of their shift – from start to finish. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet.Page 75 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-655 Page 1 of 2 Date Filed: September 24, 2026 Witness: Christopher E. Colorio and Mark P. Baldwin Request from: Office of Consumer Counsel Question: (Storm MN25K – Line Crew) The following pertains to the responses provided as part of OCC417 and the respective invoice associated with that interrogatory. a. Considering the response provided to OCC-417, how did the Company decide to acquire additional restoration resources from Chicago instead of locally based resources for a quicker response to assist with the storm? If certain factors were considered and locally based resources were fully allocated, provide evidence to supporting the unavailability of local crews and the necessity to bring in the crew from Chicago. Response: During this event, as noted in the Company’s response to OCC-417 i, the region was experiencing severe weather, causing shortages in crew availability. It was necessary for Eversource to procure crews from outside the region in order to have sufficient crews available to restore power to customers. The Company negotiated a 10-hour mobilization interval and leverages the use of the Eversource Storm fleet to obtain this resource on a cost-efficient basis. Prior References Response: i OCC-417 Question: (STORM) Please refer to Exhibit ACCT-2 (CLP-13A-18) (MN25K), Invoice #4023-01, p. 69-84. Explain the reason for deploying a crew from Chicago, IL and justify the hours allocated for this crew to travel and be on standby. Were there any additional charges billed regarding this crew, such as flights? OCC-417 Response: Referring to Exhibit ACCT-2 (CLP-13) (MN25K), Outside Line Contractors, at Line 608, vendor Support Operations Services LLC, invoice in the amount of $609,293. The MN25K storm system began to impact Connecticut on Saturday, February 15th, with snow falling across the state. Snow accumulation varied by region, with higher totals in the northern areas. As the event progressed, conditions transitioned from snow to sleet and subsequently to freezing rain. From February 16th through February 17th, the region experienced sustained winds, with gusts in the 40 to 60-mph range. The combined effects of ice loading and high winds caused damage to electric distribution infrastructure and resulted in significant power outages. Based on the extent of the damage to the electric distribution system, the Company secured additional restoration resources to support the safe and efficient restoration of power.Page 76 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-655 Page 2 of 2 Regarding standby time, maintaining supplemental resources on standby enables the Company to keep crews available and strategically positioned to respond quickly and efficiently as needed. This approach avoids having to release resources and incur additional time and expense to remobilize them as conditions change. Accordingly, keeping this out-of-state resource on standby was a reasonable and prudent decision because it ensured that the Company maintained access to this resource and could promptly dispatch crews as restoration needs arose. Regarding travel time, the decision to mobilize an out-of-state contractor using air travel was necessary given the need to make additional resources available in Connecticut as quickly as practicable, based on the Company’s assessment of the conditions that existed at the time the decision was made. The contractor’s crews were located in the Chicago area, and transporting those crews and their equipment by ground would have required approximately 18.5 hours, each way for mobilization and demobilization. Given the extent of the storm damage and the expected need for additional resources, waiting for crews to travel by ground would have delayed their availability at a time when the Company determined that additional restoration resources were needed as quickly as possible to commence restoration. Air transportation allowed the Company to reduce the time required to position this out-of-state crew in Connecticut and made those resources available for dispatch sooner. During this storm event, the existing contracts did not specify a “Fly-In” Rate. However, the Contractor and the Company agreed to 10 hours of travel for both Mobilization and Demobilization. There were no additional costs beyond those stated in the invoice. Currently, an established “Fly-In” Rate is in place for contractors to utilize.Page 77 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-656 Page 1 of 2 Date Filed: September 25, 2026 Witness: John DiPaola-Tromba, Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Consumer Counsel Question: (Storm MN25K – Equipment Rentals) Refer to Exhibits ACCT-2 (CLP-13A-18) (MN25K). The following pertains to invoices from Sunbelt Rentals Inc: a. Per review of the invoices, generators were provided per contract. Please provide the contract with Sunbelt Rentals Inc. b. Per review of several invoices, additional labor charges were incurred at certain locations. Explain what additional information/factors were considered in determining the need for additional labor at certain job sites. If additional documentation was considered to support the labor charges, please provide. c. Several invoices (ex. Invoice #165329892-0002, p. 57) noted a longer outage date (34 days). What factors would have caused the increased outage duration and subsequently the additional labor hours? Was the Company informed that a particular job site was taking longer than expected and, if so, how was this documented? If additional information was considered to support the extended outage duration, please provide. d. Invoice #165441789-0002 (p. 62) - The outage date period for this invoice was 1/18/2025 to 1/19/2025. Explain why this invoice is related to storm event MN25K if the storm didn’t occur until February of 2025. Response: a. Please refer to OCC-656, Attachment 1, for a listing of contracts associated with the invoices in question. Please refer to OCC-656, Attachment 2, for the contracts and purchase order for these invoices. b. Eversource Company policy states that any generator installed on the system requires an employee of the generator company to remain with the generator while actively powering customers to monitor it. The setup/breakdown charge includes 8.5 hours of labor. Any time beyond that results in additional labor charges. There is no additional documentation that corresponds with this invoice. The Company evaluated the duration for which the generator remained in service, the associated outage event, and the need to maintain temporary power to customers untilPage 78 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-656 Page 2 of 2 permanent repairs could be completed. The additional labor charges reflected the continued monitoring and support required while the generator remained connected and operating. c. Invoice 165329892-0002 corresponds with Event 5588775 in the Company’s Outage Management System (OMS). Generation was ordered to provide temporary power for a secondary cable fault that occurred shortly after 5:45PM on 2/15/2025. In the immediate hours subsequent to that, the Company began to take on considerable customer outages and priority / E911 calls, resulting in this secondary cable fault becoming a lower priority issue for resolution. d. Invoice 165441789-0002 corresponds with Event 5605311 in the Company’s Outage Management System (OMS). It appears that the “1/18-1/18 2025” date referenced on the invoice was a typographical error, as the Company’s records show a secondary cable fault impacting address 507 Firetown Road in Simsbury on 2/18/2025. The customer was put on generation to provide temporary power while the faulted cable was located, exposed, and repaired.Page 79 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-657 Page 1 of 1 Date Filed: September 24, 2026 Witness: Ned W. Allis Request from: Office of Consumer Counsel Question: Referring to OCC-89 Interrogatory Response. Why does an R0.75 IOWA Survivor Curve not exist? Response: The R0.75 curve is not a curve type in the standard set of Iowa curves of Iowa curves developed at Iowa State University and widely used for utility property. The original set of R curves were the whole mode curves -- R1, R2, R3, R4 and R5. The set was expanded over time to include the half-mode curves (e.g., R1.5), for which each point is calculated to be halfway between the points on the adjacent whole-mode curves (i.e., each point on the R1.5 is the average of the points on the R1 and R2 curve). The R0.5 curve is the average of the O1 and R1 curves. Because the Iowa curves have already been interpolated from the original set and because the half mode curves are relatively close to the adjacent whole mode curves already, the set of Iowa curves has not been commonly expanded further to include quarter-mode curves.Page 80 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-658 Page 1 of 1 Date Filed: September 24, 2026 Witness: Ned W. Allis Request from: Office of Consumer Counsel Question: Referring to OCC-89 Interrogatory Response. What is the minimum R number value your depreciation software can plot onto an IOWA Survivor Curve? Response: The R0.5 is the lowest-mode R curve in the standard set of Iowa curves and the lowest mode R curve included in Gannett Fleming’s depreciation software.Page 81 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-659 Page 1 of 1 Date Filed: September 24, 2026 Witness: Ned W. Allis Request from: Office of Consumer Counsel Question: Referring to OCC-89 Interrogatory Response. What is the maximum R number value your depreciation software can plot onto an IOWA Survivor Curve? Response: The R5 is the highest-mode R curve in the standard set of Iowa curves and the highest mode R curve included in Gannett Fleming’s depreciation software.Page 82 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-660 Page 1 of 1 Date Filed: September 24, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, John P. Dipaola-Tromba, Sean D. Redding, Jenna Turner and Mark P. Baldwin Request from: Office of Consumer Counsel Question: Referring to OCC-245 Interrogatory Response. Provide a list of dates and geographic locations were “bombogenesis” occurred in CL&P service territory. Response: The NWS uses the term “bombogenesis” when a midlatitude storm system rapidly intensifies within a 24-hour period. This intensification is represented by a drop in barometric pressure between 18-24 millibars, depending on the latitude location of the storm. For a storm over the CT’s latitude location, that would be a drop of 18 millibars within 24 hours. Accordingly, based on this definition, the most notable storms that have met or came very close to these criteria were: • • • • • February 23, 2026 December 11, 2024 January 28-29, 2022 October 16-17, 2019 January 3-5, 2018Page 83 of 148
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-661 Page 1 of 2 Date Filed: September 24, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, John P. Dipaola-Tromba, Sean D. Redding, Jenna Turner and Mark P. Baldwin Request from: Office of Consumer Counsel Question: Referring to OCC-245 Interrogatory Response. Did a Hurricane impact CL&Ps service territory during the Test Year or the four years prior to the Test Year? Response: The Company’s CL&P service territory did not experience any hurricanes during the Test Year or within four years of the Test Year. However, CT did experience indirect impacts from remnants of tropical systems during the Test Year and the four years prior. 2021 Tropical Storm Elsa (MS21G011/MS21H011/MN21F011) • July 9, 2021 • Brought heavy rain, flooding, washed-out roads, power outages, and localized wind damage across Connecticut. Hurricane Henri (MS21K011) • August 22-23, 2021 • Made landfall in Rhode Island as a tropical storm and directly impacted Connecticut with heavy rain, flooding, coastal flooding, power outages, and wind damage. FEMA issued an emergency declaration for Connecticut. Remnants of Hurricane Ida (MN21K011) • September 1-2, 2021 • Produced historic flash flooding across Connecticut. The state's first Flash Flood Emergency was issued for portions of Fairfield and New Haven Counties. 2022 Remnants of Hurricane Nicole (MS22H011) • November 11-12, 2022 • Produced widespread rain, gusty winds (locally over 40-50 mph), and scattered power outage concerns across Connecticut.
As listed on the current system
Corres. 10/01/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (0CC Set 16).