  1. Page 78 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-656 Page 2 of 2 permanent repairs could be completed. The additional labor charges reflected the continued monitoring and support required while the generator remained connected and operating. c. Invoice 165329892-0002 corresponds with Event 5588775 in the Company’s Outage Management System (OMS). Generation was ordered to provide temporary power for a secondary cable fault that occurred shortly after 5:45PM on 2/15/2025. In the immediate hours subsequent to that, the Company began to take on considerable customer outages and priority / E911 calls, resulting in this secondary cable fault becoming a lower priority issue for resolution. d. Invoice 165441789-0002 corresponds with Event 5605311 in the Company’s Outage Management System (OMS). It appears that the “1/18-1/18 2025” date referenced on the invoice was a typographical error, as the Company’s records show a secondary cable fault impacting address 507 Firetown Road in Simsbury on 2/18/2025. The customer was put on generation to provide temporary power while the faulted cable was located, exposed, and repaired.
  2. Page 79 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-657 Page 1 of 1 Date Filed: September 24, 2026 Witness: Ned W. Allis Request from: Office of Consumer Counsel Question: Referring to OCC-89 Interrogatory Response. Why does an R0.75 IOWA Survivor Curve not exist? Response: The R0.75 curve is not a curve type in the standard set of Iowa curves of Iowa curves developed at Iowa State University and widely used for utility property. The original set of R curves were the whole mode curves -- R1, R2, R3, R4 and R5. The set was expanded over time to include the half-mode curves (e.g., R1.5), for which each point is calculated to be halfway between the points on the adjacent whole-mode curves (i.e., each point on the R1.5 is the average of the points on the R1 and R2 curve). The R0.5 curve is the average of the O1 and R1 curves. Because the Iowa curves have already been interpolated from the original set and because the half mode curves are relatively close to the adjacent whole mode curves already, the set of Iowa curves has not been commonly expanded further to include quarter-mode curves.
  3. Page 80 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-658 Page 1 of 1 Date Filed: September 24, 2026 Witness: Ned W. Allis Request from: Office of Consumer Counsel Question: Referring to OCC-89 Interrogatory Response. What is the minimum R number value your depreciation software can plot onto an IOWA Survivor Curve? Response: The R0.5 is the lowest-mode R curve in the standard set of Iowa curves and the lowest mode R curve included in Gannett Fleming’s depreciation software.
  4. Page 81 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-659 Page 1 of 1 Date Filed: September 24, 2026 Witness: Ned W. Allis Request from: Office of Consumer Counsel Question: Referring to OCC-89 Interrogatory Response. What is the maximum R number value your depreciation software can plot onto an IOWA Survivor Curve? Response: The R5 is the highest-mode R curve in the standard set of Iowa curves and the highest mode R curve included in Gannett Fleming’s depreciation software.
  5. Page 82 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-660 Page 1 of 1 Date Filed: September 24, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, John P. Dipaola-Tromba, Sean D. Redding, Jenna Turner and Mark P. Baldwin Request from: Office of Consumer Counsel Question: Referring to OCC-245 Interrogatory Response. Provide a list of dates and geographic locations were “bombogenesis” occurred in CL&P service territory. Response: The NWS uses the term “bombogenesis” when a midlatitude storm system rapidly intensifies within a 24-hour period. This intensification is represented by a drop in barometric pressure between 18-24 millibars, depending on the latitude location of the storm. For a storm over the CT’s latitude location, that would be a drop of 18 millibars within 24 hours. Accordingly, based on this definition, the most notable storms that have met or came very close to these criteria were: • • • • • February 23, 2026 December 11, 2024 January 28-29, 2022 October 16-17, 2019 January 3-5, 2018
  6. Page 83 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-661 Page 1 of 2 Date Filed: September 24, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, John P. Dipaola-Tromba, Sean D. Redding, Jenna Turner and Mark P. Baldwin Request from: Office of Consumer Counsel Question: Referring to OCC-245 Interrogatory Response. Did a Hurricane impact CL&Ps service territory during the Test Year or the four years prior to the Test Year? Response: The Company’s CL&P service territory did not experience any hurricanes during the Test Year or within four years of the Test Year. However, CT did experience indirect impacts from remnants of tropical systems during the Test Year and the four years prior. 2021 Tropical Storm Elsa (MS21G011/MS21H011/MN21F011) • July 9, 2021 • Brought heavy rain, flooding, washed-out roads, power outages, and localized wind damage across Connecticut. Hurricane Henri (MS21K011) • August 22-23, 2021 • Made landfall in Rhode Island as a tropical storm and directly impacted Connecticut with heavy rain, flooding, coastal flooding, power outages, and wind damage. FEMA issued an emergency declaration for Connecticut. Remnants of Hurricane Ida (MN21K011) • September 1-2, 2021 • Produced historic flash flooding across Connecticut. The state's first Flash Flood Emergency was issued for portions of Fairfield and New Haven Counties. 2022 Remnants of Hurricane Nicole (MS22H011) • November 11-12, 2022 • Produced widespread rain, gusty winds (locally over 40-50 mph), and scattered power outage concerns across Connecticut.
  7. Page 84 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-661 Page 2 of 2 2023 Hurricane Lee (MS23G011) • September 15-17, 2023 • Stayed offshore, but Connecticut experienced rough surf, coastal impacts, and gusty winds due to Lee's large circulation. 2024 Remnants of Tropical Storm/Hurricane Debby (MS24J0011) • August 9-10, 2024 • One of the more significant tropical-related events of the year for Connecticut. Produced heavy rain, flooding concerns, strong winds, and even tornado watch conditions in parts of the state.
  8. Page 85 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-662 Page 1 of 1 Date Filed: September 24, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, John P. Dipaola-Tromba, Sean D. Redding, Jenna Turner and Mark P. Baldwin Request from: Office of Consumer Counsel Question: Referring to OCC-245 Interrogatory Response. What was the last hurricane that had minimum sustained wind speed of 74 mph or higher inside CL&P’s service territory? Response: The last hurricane that had minimum sustained wind speed of 74 mph or higher inside CL&P’s service territory was Hurricane Gloria on September 27, 1985.
  9. Page 86 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-663 Page 1 of 1 Date Filed: September 24, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, John P. Dipaola-Tromba, Sean D. Redding, Jenna Turner and Mark P. Baldwin Request from: Office of Consumer Counsel Question: Referring to OCC-245 Interrogatory Response. Does the Company track tornadoes that impact the Company’s assets? Response: The Company tracks damage to the electric distribution system, although there is no specific damage cause code for tornadoes. In practice, attributing damage specifically to a tornado is challenging during real-time storm response because tornado occurrence, intensity, and track are typically not confirmed until after the event through formal post-storm assessments conducted by trained meteorological damage survey teams. As a result, field damage is generally recorded based on observed asset impacts rather than a definitive tornado designation at the time of restoration. Even if a tornado-specific cause code existed, accurate classification would often require subsequent review and correlation with official weather assessments and documented tornado tracks.
  10. Page 87 of 148

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-664 Page 1 of 1 Date Filed: September 24, 2026 Witness: Theresa Hopkins-Staten, Brendan J. O'Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Referring to OCC-262 Interrogatory Response. Why does the Company consider Eversource’s Foundation as independent? Response: The Eversource Energy Foundation, Inc., (“Foundation”) is a separate nonprofit corporation that is closely affiliated with Eversource Energy (“Eversource”). While the Foundation is funded by Eversource shareholders, governed by directors selected by Eversource, and supported by Eversource resources, it is a separate legal entity. Its assets are not assets of Eversource, Eversource cannot reclaim contributions once made, and the Foundation's directors have fiduciary duties to act in the best interests of the Foundation and its charitable purposes.