Utility Dockets and Filings

Discovery Compilation (NECTA Set 2).

Files2

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 8 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-02 Date Issued September 14, 2026 NECTA-094 Page 1 of 1 Date Filed: September 28, 2026 Witness: David L. Gladey, Jeffrey Richard, Leanne M. Landry and Jeffrey D. Turano Request from: New England Cable and Telecommunications Association Inc Question: (Make-Ready Costs – Comcast) Referring to OCC-150, Attachment 5 (2023 Owed Make Ready True Ups), Comcast Cable is listed with one entry for $1,866.91 (Last Bill Date: 3/20/2023). Provide the following: a. Identify the specific make-ready work, including the pole number(s) and location(s), associated with this charge. b. State whether the make-ready work has been fully completed, partially completed, or not yet commenced. If partially completed, identify what work remains outstanding. Response: a. The amount identified in OCC-150, Attachment 5, represents a make ready true up charge in a moment of time and is associated with a completed pole attachment project. The accounts receivable aging report does not identify the associated pole number(s) or location(s). b. The make-ready work associated with the true up charge was fully completed prior to issuance of the invoice. The Company does not issue make ready true up invoices for work that is only partially completed.
  2. Page 9 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-02 Date Issued September 14, 2026 NECTA-095 Page 1 of 1 Date Filed: September 28, 2026 Witness: David L. Gladey, Jeffrey Richard, Leanne M. Landry and Jeffrey D. Turano Request from: New England Cable and Telecommunications Association Inc Question: (Make-Ready Costs – Comcast) Referring to OCC-150, Attachment 9 (2025 Owed Make Ready True Ups), Comcast Cable is listed with numerous entries totaling a substantial portion of the $1,156,888.67 total, with bill dates in October and November 2025 and amounts ranging from $63.39 to $33,167.76. For each Comcast Cable line item in Attachment 9: a. Identify the specific make-ready work, including the pole number(s) and location(s), associated with each charge. b. Has the make-ready work been fully completed, partially completed, or not yet commenced? c. For each entry, provide the associated work order number. Response: a. The Comcast Cable entries identified in OCC-150, Attachment 9, represent make ready true up charges in a moment of time associated with completed pole attachment projects. The accounts receivable aging report does not identify the associated pole number(s) or location(s). As of September 1st, 2026, the amount of Owed Make Ready True Ups owed by Comcast Cable is $557,547.99 1. b. The make ready work associated with each true up charge was fully completed prior to issuance of the invoice. The Company does not issue make ready true up invoices for work that is only partially completed or not yet commenced. c. The accounts receivable aging report does not identify or maintain associated work order numbers for the listed balances. The Company continues to receive payments for Make Ready True Ups that have not posted to our financial systems when this response was drafted. 1
  3. Page 10 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-02 Date Issued September 14, 2026 NECTA-096 Page 1 of 1 Date Filed: September 28, 2026 Witness: David L. Gladey, Jeffrey Richard, Leanne M. Landry and Jeffrey D. Turano Request from: New England Cable and Telecommunications Association Inc Question: (Make-Ready Costs – Comcast) For each Comcast Cable entry in OCC-150, Attachments 5, and 9, state whether the charge is associated with make-ready work that was classified as billable pursuant to the Company’s billable/non-billable determination process described in Exhibit CLP-ADDITIONS-1, at pp. 69–71. If any charge relates to an NESC non-compliance condition identified in OCC-190, Attachment 1, identify the corresponding work order number. Response: Yes, the Comcast Cable entries identified in OCC-150, Attachment 5, and OCC-150, Attachment 9, represent make ready true up charges in a moment of time and are associated with completed pole attachment projects. The associated make ready work was classified as billable pursuant to the Company’s billable/non-billable determination process described in Exhibit CLPADDITIONS-1, at pp. 69-71. Please refer to OCC-190, Attachment 1, for the Non-Compliance issue determination, including NESC non-compliance conditions, and the associated work order numbers.
  4. Page 11 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-02 Date Issued September 14, 2026 NECTA-097 Page 1 of 2 Date Filed: September 28, 2026 Witness: David L. Gladey, Jeffrey Richard, Leanne M. Landry and Jeffrey D. Turano Request from: New England Cable and Telecommunications Association Inc Question: (Make-Ready Costs – Cox) Referring to OCC-150, Attachment 9 (2025 Owed Make Ready True Ups), Cox Communications is listed with one entry for $10,662.32 (Last Bill Date: 11/21/2025). Provide the following: a. Identify the specific make-ready work, including the pole number(s) and location(s), associated with this charge. b. Identify all cost components included in the $10,662.32 amount. c. State whether the make-ready work has been fully completed, partially completed, or not yet commenced. d. Provide the associated work order number. Response: a. The billable make ready work associated with this true up charge to Cox Communications for the amount of $10,662.32 is listed in Alden One under the associated conversation number 1774643. The following table has been exported from Alden One and shows the Pole Owner(s), Power Pole Number, Address, City, Billable status, and Comments that identify the work to be done:
  5. Page 12 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-02 Date Issued September 14, 2026 NECTA-097 Page 2 of 2 b. Cost components resulting in a balance due of $10,662.32. c. The make-ready work associated with the true up charge was fully completed prior to issuance of the invoice. The Company does not issue make ready true up invoices for work that is only partially completed. d. The associated Work Order Number is 19935086. Additionally, the corresponding FWO is 80244434, and the Alden One Conversation number is 1774643.
  6. Page 13 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-02 Date Issued September 14, 2026 NECTA-098 Page 1 of 1 Date Filed: September 28, 2026 Witness: David L. Gladey, Jeffrey Richard, Leanne M. Landry and Jeffrey D. Turano Request from: New England Cable and Telecommunications Association Inc Question: (Make-Ready Costs – Cox) For each Cox entry in OCC-150, Attachment 9, state whether the charge is associated with make-ready work that was classified as billable pursuant to the Company’s billable/non-billable determination process described in Exhibit CLPADDITIONS-1, at pp. 69–71. If any charge relates to an NESC non-compliance condition identified in OCC-190, Attachment 1, identify the corresponding work order number. Response: Yes, the make-ready work that is referenced in OCC-150 Attachment 9, is billable according to the billable/non-billable determination process.
  7. Page 14 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-02 Date Issued September 14, 2026 NECTA-099 Page 1 of 1 Date Filed: September 28, 2026 Witness: David L. Gladey, Jeffrey Richard, Leanne M. Landry and Jeffrey D. Turano Request from: New England Cable and Telecommunications Association Inc Question: (Non-Billable Cost Allocation – General) Referring to the Company’s response to OCC-179, and Exhibit CLP-REVREQ-4 (Make-Ready Pole Work), the Company identified seven categories of non-billable make-ready reason codes. For each of the following non-billable reason codes: state the total dollar amount of costs incurred by the Company in each year from 2022 through 2025 and identify the FERC accounts to which the costs were assigned and the amounts assigned to each account: Make Ready – Correct pre-existing condition/violation – Clearance Make Ready – Correct pre-existing condition/violation – Loading Pole Replacement – Actions to Address Pole Clearance (pre-existing condition/violation) Pole Replacement – Actions to Address Defective Pole (pre-existing condition/violation) Pole Replacement – Actions to Address Pole Loading (pre-existing condition/violation) Pole Replacement – Actions to Address Make Ready at Adjacent Pole (5 foot rule) Other Response: The Company does not track costs by reason code. To be responsive to this question, the Company has broken Exhibit CLP-REVREQ-4, out by year, see Table 1 below. Within CLP-REVREQ-4, all the FERC accounts that have charges are identified across the header on page 1, and all Work Orders are tied to reason codes, starting on page 26, of CLP-REVREQ-4. Table 1: Make Ready O&M Deferral by Year Sum by Year of CLP-REVREQ-4 2022 2023 2024 2025 Total $ $ $ $ $ 1,048,267 3,345,735 5,446,836 6,740,030 16,580,868
  8. Page 15 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-02 Date Issued September 14, 2026 NECTA-100 Page 1 of 4 Date Filed: September 28, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Cable and Telecommunications Association Inc Question: (Non-Billable Cost Allocation – Pole Replacements) Referring to the Company’s response to OCC-179, four of the seven non-billable reason codes involve pole replacements (Pole Clearance, Defective Pole, Pole Loading, and Make-Ready at Adjacent Pole (5 foot rule)). For pole replacements classified as non-billable in each year from 2022 through 2025, provide the following: a. The total number of pole replacements and the total cost, broken down by reason code. b. For each pole replacement, state whether the replaced pole would have been scheduled for replacement under the Company’s Pole Integrity Program or Right of Way Program absent the third-party attachment application. c. To the extent not answered in response to NECTA-099, identify the FERC accounts to which the costs were assigned and the amounts assigned to each account. Response: a. The Company does not track the quantity of pole replacements by reason code. To be responsive to this question, the Company has broken down the number of pole replacements classified as non-billable in response to third party make-ready, by year, in Table 1 below. Table 1 Poles Replaced by Eversource 2022 2023 2024 # of Poles 388 300 163 2025 177 b. Please refer to NECTA-016 i, for a description of the Company’s annual pole inspection process. Please also refer to NECTA-049 ii, for an explanation of how the Company identifies all work. The Company is unable to determine whether or not a replaced pole due to a third-party application would have been replaced due to the Company’s Pole Integrity or Right of Way Program because of the timing differences between a pole integrity review and when a third-party survey review occurs. There are a number of circumstances in a given year that would remove poles from the Pole Integrity inspection lists, including, but not limited to, storms, motor vehicle accidents, and new service
  9. Page 16 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-02 Date Issued September 14, 2026 NECTA-100 Page 2 of 4 projects that make it difficult to determine if a pole would have been identified outside the make ready process. c. Please refer to NECTA-99 iii. Prior Referenced Responses: i NECTA-016 Question: (Pole Management & SPA) Refer to Exhibit CLP-ADDITIONS-1, at p. 64 (“Replacements are based on annual inspections”). Provide the following: a. b. Describe the Company’s annual inspection process, including the number of poles inspected each year, the data collected during the inspection, the criteria used to determine the integrity of the pole, who performs the inspections, and how the information collected during the inspections is used. Provide all data collected during the most recent annual inspection. NECTA-016 Response: a. The Company performs its routine and annual pole inspection to its custodial wooden poles following a 15year inspection cycle which ended in 2025. This cycle ensured that every custodial pole across 157 towns in Connecticut was inspected at least once within the time frame. Approximately 29,000 to 32,000 poles were inspected using the 15-year cycle. In 2025, the Company reviewed its wood-pole inspection standards and decided to shorten the inspection cycle from 15 years to 10 years. By adopting a more frequent inspection schedule, the Company aims to evaluate each custodial pole every 10 years, allowing issues to be identified earlier and addressing them more proactively. Under the revised 10-year cycle, approximately 41,000 to 42,500 poles will be inspected starting in 2026 and moving forward. The inspection process is based on the age of the pole. A visual inspection is completed for poles with less than 20 years of service. For poles with more than 20 years in service the inspection will include a visual, sound and bore, resistograph testing also known as IML testing, and the application of preservatives “treatment” required to maintain the structural integrity of the pole, and ensure continuous serviceability until the subsequent inspection interval. The number of poles replaced each year due to age, structural deterioration, damage, or end-of-life conditions varies based on the number of rejected poles identified through the annual pole inspection program. Poles classified as "Rejects" cannot remain in service because their remaining strength has fallen below 67% of their original strength or because they exhibit structural or mechanical damage that compromises safe operation. These poles are scheduled for replacement within one year of identification. Poles classified as "Priority Rejects" represent the most critical conditions and cannot remain in service because their remaining strength has fallen below 25% of their original strength and/or they exhibit severe structural or mechanical deterioration that presents an immediate public safety risk and reliability. Priority Reject poles are made safe within 48 hours of identification and are replaced as soon as practicable.
  10. Page 17 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-02 Date Issued September 14, 2026 NECTA-100 Page 3 of 4 Poles classified as "Leaning" are poles that are susceptible to failure and may pose risks to public safety and electric system reliability. Leaning poles occur when soil disturbances, loading from pole attachments, or other external forces alter the pole's original alignment. These conditions are commonly caused by soil saturation and moisture accumulation, excessive structural loading, vehicle impacts, severe weather, or storm-related damage. Depending on the severity of the condition, findings from the pole inspection process are communicated to the Company on a daily, weekly, or immediate basis to ensure appropriate corrective actions are taken. Currently, GeoForce Utility Technologies is the contractor responsible for performing all pole inspections throughout Connecticut during the 2024-2026 period. The selection of pole inspection contractors follows a competitive bidding process, with the successful bidder typically awarded a three-year inspection cycle contract. b. ii Please refer to NECTA-009i for the data collected during the most recent pole inspection. NECTA-049 Question: (Make Ready Work & Related Costs) Reference Exhibit CLP REV-REQ-4. When tracking non-billable make-ready costs, explain how the Company identifies and attributes all pole capital and maintenance work required to be performed by Eversource in its ordinary course of business to its own service requirements. NECTA-049 Response: The Company identifies and attributes non-billable make-ready costs through its established work management and work order processes. Work orders are created based on the specific project or work type being performed, with defined scopes that distinguish whether the work is customer-driven, make-ready activities (billable or non-billable), capital improvement, etc. from work required by the Company to meet its own service, safety, reliability, and operational obligations. During project development, engineering personnel review the required work and assign activities to the appropriate work order based on the nature and purpose of the work. Work that is necessary to accommodate a third-party attachment request is tracked separately from work that would be performed by the Company in the ordinary course of business to maintain, replace, or enhance its electric distribution infrastructure. The Company's work order structure, estimating process, and project oversight practices are designed to ensure that only work directly related to the applicable project scope is charged to that work order. Throughout project execution, the scope of work is monitored and managed to minimize scope creep and to ensure that Company-initiated capital or maintenance activities are appropriately identified and attributed to separate work orders. This approach helps maintain the integrity of cost tracking and supports the accurate allocation of make-ready costs between attachers and the Company's own service requirements. As a result, non-billable make-ready costs are identified through the Company's project scoping, engineering review, and work order management processes, which are intended to segregate work performed for Company operational needs from work performed in support of attachment-related make-ready activities.

As listed on the current system

Corres. 10/05/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (NECTA Set 2).