Discovery Compilation (EOE Set 5 and UCONN Set 2)
Files3
Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
EOE Set 5_COMBINED.pdf
PDF · 1.3 MB · 169 pagesText searchable
Download EOE Set 5_COMBINED.pdfRead the text of EOE Set 5_COMBINED.pdf
UCONN Set 2_COMBINED.pdf
PDF · 372 KB · 19 pagesText searchable
Download UCONN Set 2_COMBINED.pdfRead the text of UCONN Set 2_COMBINED.pdf
Page 105 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-235 Page 2 of 2 hotel rooms that are closer to their physical work location (the Company focuses on locating crews as close as possible to their assigned restoration jobs to minimize the need for travel, thus freeing them up for actual restoration work). The Company must meet its contractual obligations with each hotel to pay for rooms reserved post the cancellation time frame. It is also important to note that, in times of service outages, there are other demands on hotel space from displaced residents that are experiencing service outages. As a result, the Company needs to be able to have adequate facilities to house the crews that are required to be on-site at the outset of an event, and the Company does that through contractual and logistical commitments made ahead of the event. In preparation for the storm event, the Company had booked rooms at the Madison Lakota Oaks for Wednesday, January 10, 2024 and Thursday, January 11, 2024 nights and ordered all meals as noted previously. On January 8, 2024, the Madison Lakota Oaks confirmed that food had been ordered to accommodate all meals and could not be cancelled. Due to changes in food and lodging needs for the storm event, the Company had to cancel the rooms. The cancellation notification was sent via email on Wednesday, January 10, 2024, at 11:37am. The Company did not incur any charges for the cancelled rooms, but did incur the cost of the ordered food.Page 106 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-236 Page 1 of 2 Date Filed: October 01, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE; WIRE GUARDS) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 214-225. The Company reported four incremental charges in the combined amount of $60,030 for the Maverick Construction Corp vendor for Wire Guards. Respond to the following: a. Confirm that the wire guards were not utilized for remediation services (i.e., guarding downed wires). If not confirmed, cite the supporting documents demonstrating the actual services that were rendered. b. Identify the billings attributed to mobilization, demobilization, and standby. If response to subsection (a) identifies actual remediation, please also include the billings attributed to work. c. Referring to pp. 216, 219, 222, and 225, the Company provided Eversource Contractor Storm Mobilization & Demobilization Time Reports that billed eight hours of mobilization and four hours of demobilization for every vendor employee with a general location reference of “Various locations throughout the northeast, NY, PA, Boston MA”. Explain how vendor employees could have mobilized/demobilized from “various locations” but were permitted to bill the same number of hours. Additionally, explain how the Company was able to validate the accuracy of the billed hours given the lack of locations for each billed individual. d. Provide documentation to support the specific efforts performed by the Company to obtain local wire down guard crews in lieu of those “throughout the northeast”. e. Cite the location of the specific contract and pricing schedule supporting the rates charged for the services (i.e., wire down guards) provided. Response: a. Wire Guards procured from Maverick Construction Corp were hired to perform wire guard functions exclusively. Due to the storm not materializing as forecasted, Maverick resources were not deployed to the field. The associated charges were related to mobilization, time awaiting potential deployment and demobilization. b. All charges are attributed to mobilization, demobilization, and standby.Page 107 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-236 Page 2 of 2 c. The contractors are hired from a specific hiring location. The agreements pay for mobilization from that location. The individual resources are not paid for their specific locations. For this invoice the contractor mobilized from Boston MA to be staged in CT and traveled during a weather event. d. Eversource seeks to secure the most commercially competitive suppliers with the closest available qualified wire down guard resources to support storm response activities. The resource acquisition process begins with outreach to available local and regional resources and expands geographically as necessary to satisfy forecasted staffing requirements, with priority given to qualified suppliers under existing agreements. Resource availability is often impacted by the geographic scope of the weather event and competing demand across affected utilities. Accordingly, Eversource attempts to utilize local resources where available and supplements those resources with regional crews when local availability is insufficient to meet operational needs. For MS24A, the Company contacted available resources within the region and expanded its requests as necessary to obtain the required staffing levels. Due to storm-related demand and resource availability constraints, regional resources were utilized to supplement locally available wire down guard personnel. e. The rates charged for the Wire Down Guard services are supported by the Maverick Construction Corp. Agreement for Wires Down Guards for Electric Utility Distribution Emergency Response Program Work, provided in OCC-044, Attachment 2, Page 3982.Page 108 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-237 Page 1 of 3 Date Filed: September 29, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-17, pp. 41-64. The Company reported an incremental charge of $97,518 for the McPhee Electric LTD vendor. Respond to the following: a. Explain why the vendor billed at DT rates from 6:00am on January 10, 2024, when it didn’t receive its first work assignment until 10:00am, four after the vendor’s start time. As part of the response, identify the incremental impact of billing four hours at DT rates in lieu of OT rates applicable during standby. b. Referring to pp. 50-58 and 60-64, the documents appear to be corrupt (i.e., too small to inspect). Please provide legible copies of the referenced documents. c. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC-044, Att.2 (Confidential), starting at p. 3989 includes a List of Exhibits at d. p. 3995 which references the Pricing Schedule as Exhibit B which could not be located in the document. e. Referring to pp. 46-47, explain why the equipment was charged during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount ($) of equipment that was charged for standby. (Note, please assess all invoices to include the illegible ones referenced in subsection b.) Response: Please refer to Exhibit ACCT-2 (CLP-1)(MS24A), Outside Line Contractors, at Line 453, McPhee Electric LTD, in the amount of $97,518. a. Based on the Company’s review of the specified timesheets, there is no significant missing information within the “Work Distribution” section. The timesheets are not intended to be an exhaustive record of every minute, task or discrete activity undertaken by a crew in the course of performing its work. Nor is the timesheet the method by which the Company manages the crews or assures that the crew is working in the manner and location that they are supposed to be. The timesheets are used to document the time worked and general nature of the work performed. Given the nature of storm restoration work, it would be impractical and inconsistent with the crews’ primary responsibility of safely and efficientlyPage 109 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-237 Page 2 of 3 restoring electric service to require personnel to record every work task or discrete activity performed throughout the workday. The Company manages the crews through the oversight of the employee dispatching the crews and the External Field Resource Coordinator (EFRC), who is physically in the field with the crews, ensuring that the crews are properly engaged and assigned work to restore the system from storm damage. The linemen who are filling out the timesheets are primarily focused on working safely in a dynamic environment that is full of potentially lethal hazards. The EFRC is the Company representative who is responsible for signing the timesheets and they have personal knowledge of the work that the crews have performed and the activities they have engaged in, particularly in relation to the hours stated in Boxes 24 and 25. Importantly, the crews are in “working” status for the entire duration of their shift – from start to finish. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another, precisely segmenting the day from an “event” perspective. All activities, whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet. b. Please refer to EOE-237, Attachment 1 CONFIDENTIAL, for legible copies of expense receipts from McPhee invoice number 21327RR. c. The vendor’s contractual Exhibit B Pricing Schedule was inadvertently omitted from the materials originally submitted due to a clerical error during the submission process. The Exhibit B Pricing Schedule is now being provided as EOE-237, Attachment 2 CONFIDENTIAL. d. The vendor’s contractual Exhibit B Pricing Schedule is provided as EOE-237, Attachment 2 CONFIDENTIAL. e. Under the applicable Master Service Agreement, contractors are entitled to payment for equipment at 50% of the applicable equipment rate while on standby, as provided in Section 3.6, page 5 of EOE-237, Attachment 2 CONFIDENTIAL, (Exhibit B Pricing Schedule). Accordingly, the equipment charges during standby were billed pursuant to the applicable contractual standby provisions. In addition, the total amount of $3,857.28 was charged for equipment.Page 110 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-237 Page 3 of 3 With respect to field crew timekeeping, a field crew may characterize time during a shift as “standby,” reflecting the physical status of the crew at a particular point in time. However, this characterization does not indicate that the crew or associated equipment was inactive or demobilized. During these periods, contractor resources may remain fully mobilized at the designated work or staging location, with personnel and equipment committed to Company operations and prepared to perform work immediately upon assignment. For example, resources may be awaiting the next ticket or work assignment, further direction from the Company, or otherwise transitioning between assignments, while supporting ongoing operations. Although the field crew may characterize this time as “standby” on its timesheet, the resources remain deployed and available only to Eversource for work purposes. Therefore, the working rate contractually applies.Page 111 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-238 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-OTHER) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT2 CLP-1A-17, p. 68. The Company reported an incremental charge of $75 for the Michael Bryggare vendor for photography services. Explain why photography services were a necessary incremental storm cost. Response: Please refer to Refer to Exhibit ACCT-2 CLP-1 (MS24A), Outside Contractors-Vendors, line 455, vendor Michael Bryggare, invoice totaling in the amount of $75. The Company’s use of external photography and content-gathering services during major storm events is necessary to support essential storm response, stakeholder communications, and post-event evaluation functions while preserving internal resources for restoration-related activities. During significant storm events, Company personnel are principally dedicated to critical operational responsibilities, including damage assessment, outage restoration, system operations, public safety coordination, customer communications, and incident management. Reassigning these personnel to photography and content-collection duties would reduce the resources available to perform restoration activities and could adversely impact the efficiency of the Company’s response efforts. Although the Company has enhanced its internal capabilities by training employees with photography experience and utilizing available personnel when practicable, the scale, geographic scope, and resource demands associated with major storm events frequently exceed the capacity of internal resources alone. The use of external photographers provides additional coverage and flexibility, enabling the Company to document conditions across multiple locations simultaneously without diverting personnel from restoration and emergency response functions. The photographic documentation obtained through these services serves a legitimate business purpose and is an integral component of the Company’s storm response process. The photographs provide contemporaneous visual records of storm conditions, infrastructure damage, field operations, and restoration activities. These records support the Company’s communications with customers, municipalities, state and local officials, news media, and other stakeholders by providing accurate and timely information regarding storm impacts and restoration challenges. Such documentation also assists in managing customer expectations, particularly in heavily impacted areas where visual evidence of damage conditions helps explain restoration timelines and operational constraints.Page 112 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-238 Page 2 of 2 Additionally, the photographic records are utilized for post-event analysis, lessons-learned reviews, emergency preparedness assessments, and the evaluation of restoration practices. Maintaining comprehensive documentation of storm impacts and response activities supports the Company’s continuous improvement efforts and enhances its ability to assess the effectiveness of restoration strategies following major events. Accordingly, the Company’s limited use of external photography services during major storm events represents a reasonable and prudent business practice. The engagement of these resources supplements internal capabilities, ensures adequate documentation of storm-related conditions and response efforts, and allows Company personnel to remain focused on their primary responsibility of safely and efficiently restoring electric service to customers.Page 113 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-239 Page 1 of 2 Date Filed: October 02, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-17, pp. 100-151. The Company reported an incremental charge of $1,285,629 for the Midcon Energy Services Inc vendor. The charge applies to travel (i.e., mobilization and demobilization), standby, and work. Respond to the following: a. Referring to pp. 118-121 and pp. 134-136, explain why the vendor was permitted to submit Eversource Contractor Storm Daily Time & Work Reports without completing any Event Start Times (box 24) and Event End Times (box 25). As part of the response, explain how the Company was able to verify the accuracy of the reported travel time (box 10), standby time (box 11), and work time (box 12). b. Referring to p. 150-151 (as a 1st example), explain why the vendor was permitted to bill for 6.5 hours of mobilization from Beacon Falls CT to Windsor CT and four hours for demobilization when that commute would typically take less than 1 hour, or less than 1.5 hours after applying a 1.3 factor increase. As part of the response, provide any communication between the Company and the vendor that occurred prior to the approval of the invoice substantiating the travel hours billed. c. Referring to p. 137-138 (as a 2nd example), explain why the vendor was permitted to bill for four hours of demobilization from Norwalk CT to Windsor CT when that commute would typically take less than 1.5 hours, or less than 2 hours after applying a 1.3 factor increase. As part of the response, provide any communication between the Company and the vendor that occurred prior to the approval of the invoice substantiating the travel hours billed. d. Referring to pp. 101-105, provide the information within an unlocked Excel spreadsheet and supplement each of the travel hours billed to the Company (i.e., mobilization on 1/9/24, travel on 1/10/24, and demobilization, on 1/10/24) with details for the starting and ending locations, the number of miles between the two locations, and provide any communication between the Company and the vendor that occurred prior to the approval of the invoice substantiating the travel hours billed. Response: a. The Company confirmed that this crew arrived onsite for their first shift on 01/10/2024 at 6:00am. These crews traveled from Windsor, CT to their first location, which was toPage 114 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-239 Page 2 of 2 Norwalk, CT confirming that the stated travel time of 2 hours was well within the approved travel time. There was no standby time submitted on these timesheets. Based on the number of tickets and the various locations that these crews had to travel to and from, the 6.5 hours of working time would be appropriate and was therefore approved. b. The Mobilization timesheets from Beacon Fall, CT to Windsor, CT were submitted at 4 hours of travel. This travel did occur during rush hour traffic and it was communicated via the Mobilization timesheet that they encountered trouble locating hotels to accommodate the large contingent and then drove to East Granby, CT to be on standby. Based on these conditions and the time of day, the number of travel hours was not considered excessive and was therefore approved. c. The Demobilization timesheets were from Hartford, CT to Beacon Falls, CT which would allow for an acceptable travel time of 1.5 hours. Communication was received during the Demobilization travel that these crews encountered a major traffic accident during the travel home and therefore the 4 hours of travel were approved. d. Please refer to EOE-239, Attachment 1, for requested travel breakdown. There were no additional discussions with the Contractor regarding travel during the invoice review process. All hours were considered acceptable and were therefore approved. Please note that the travel mileage was not captured for timesheets under the working tab because crews traveled between multiple work locations during their shifts. Although mileage was not separately tracked within the timesheet, the invoice review process included an assessment of the work locations to validate the travel incurred. Based on that review, the travel charges were found to be consistent with the locations where the work was performed. Included in the referenced attachment are the job locations and the total number of work assignments.