Discovery Compilation (EOE Set 5 and UCONN Set 2)
Files3
Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
EOE Set 5_COMBINED.pdf
PDF · 1.3 MB · 169 pagesText searchable
Download EOE Set 5_COMBINED.pdfRead the text of EOE Set 5_COMBINED.pdf
UCONN Set 2_COMBINED.pdf
PDF · 372 KB · 19 pagesText searchable
Download UCONN Set 2_COMBINED.pdfRead the text of UCONN Set 2_COMBINED.pdf
Page 11 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-175 Page 2 of 2 EOE-024, Attachment 1, references Contract Nos. CW2241580 and CW2280421: • CW2241580 is an MSA with an effective date beginning in 2018. It was included in EOE024, because that request sought the governing MSAs effective from 2018 to the present. It was not included in OCC-044. because it was not a current line crew contract and was not the contract workspace under which the applicable storm costs were recorded. • CW2280421 is the MSA contract workspace associated with the same Construction Distribution Overhead Line agreement represented by sub-agreement workspace CW2281565. The applicable agreement was effective from 2021 through 2023. In SAP Ariba, an MSA contract workspace contains the governing terms of the agreement but generally does not hold the associated contract value. The MSA may have one or more related subagreement contract workspaces under which the contract value and associated costs are recorded. Therefore, CW2280421, and CW2281565 are not two inconsistent agreements. CW2280421 is the governing MSA workspace, while CW2281565 is the related sub-agreement workspace under which the applicable value and storm costs were recorded. EOE-024, identified CW2280421 because that request sought the governing MSA. OCC-044, Attachment 1, identified CW2281565 because that request sought the contracts associated with costs reflected in the storm events included in this docket. Thus, although the two responses referenced different SAP Ariba contract workspace numbers, those numbers relate to the same underlying agreement.Page 12 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-176 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio and Mark P. Baldwin Request from: Office of Education, Outreach, and Enforcement Question: (STORM-EXTERNAL VENDORS) Does the Company have any contractual or internal policies allowing external line vendors to charge for a predetermined or set number of hours for demobilization or mobilization beyond the vendor’s actual commute? If yes, please provide supporting documentation. Response: The contract currently allows for two hours pre/post mob/de-mob to complete activities related to travel, which include but are not limited to safety briefings, meals, and hotel room assignments. Historically, the interval of approximately two hours was expected for this activity, although not directly documented in the historical contract. The excerpt below is from the current Exhibit C Pricing Schedule which provides the definition for the “Travel Pre / Post (Mob/De-Mob Rate): “Travel Pre / Post (Mob/De-Mob) Rate” Rate by Contractor Resources for the two (2) hours after District of Services center or hotel arrival and prior to departure from Owner’s property. This time shall be utilized for all Safety briefings, Meals, and hotel room assignments. The two (2) hours following Mobilization shall begin immediately before the “Arrive No Later Than Time” on the ERSG Hiring email. The two (2) hours following De-Mobilization shall begin immediately following the official release time on the ERSG release email and shall include safety training/site or storm specific trainings or briefings and hotel assignmentsPage 13 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-177 Page 1 of 1 Date Filed: September 25, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM FLEET) Refer to Response to EOE-031, Att.1. Respond to the following: a. Confirm that the total cost of the storm fleet, inclusive of all vehicles for CT, MA, and NH, is included in the fleet costs referenced in Att.1. If not, identify the individual costs for each state. b. Confirm that the total “hours used” for all three states serve as the basis of cost allocation. If not, identify how the costs are allocated and provide details supporting the allocation(s). c. Identify if fleet vehicles “available” in a given state (i.e., CT, MA, NH) are used, or can be used, to support a different state’s needs. Provide details as appropriate. d. Supplement the information provided in EOE-031, Att. 1 with details on each external vendor who utilized the storm fleet for each storm event. As part of the response, please identify both the total number of hours incurred by vendor, as well as the total number fleet vehicles used by vendor Response: a. Referring to EOE-031, Attachment 1, the total cost of the storm fleet is inclusive of all vehicles for CT, MA and NH. b. The total “hours” used serve as the basis of cost allocation. c. In some cases, where contractors are moved from one state to another after their primary restoration duties are completed, the storm trucks will follow to the other states. d. Please refer to EOE-177, Attachment 1, for details on each external vendor.Page 14 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-178 Page 1 of 1 Date Filed: September 25, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM FLEET) Refer to Response to EOE-031, including Att. 1. Provide an unlocked Excel spreadsheet detailing the each storm fleet cost for 2024 through present. As part of the response, please provide both a summary of the storm costs by category and a detailed listing of storm fleet costs that can be used to sample individual expenses. EOE refers the Company to Docket No. 2512-13, Interrog. Resps. EOE-666, Att.2 and EOE-722, Att.1 for the costs by category (EOE-666, Att.2) as an example of the detailed listing of individual expenses (EOE-722, Att.1). Separately, provide the individual number of “hours used” by state (i.e., CT, MA, NH). Response: Please refer to EOE-178, Attachment 1, for the details of the storm fleet costs for 2024 through June 2026. Included is the invoice listing of “other outside services” expenses similar to what was provided in EOE-666 from Docket No. 25-12-13. Please refer to EOE-177, Attachment 1, for the individual number of “hours used” by state.Page 15 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-179 Page 1 of 2 Date Filed: September 28, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Education, Outreach, and Enforcement Question: (STORM – DRONE USAGE) Refer to Response to EOE-033. Respond to the following: a. Explain why the Company incurred more than a 5x increase in drone expenses for the test year (i.e., 2025) compared to all prior years. b. Discuss if the increased drone expenses have resulted in a decrease in c. staffing levels within the Company’s Event Level Matrix (ELM). c. Provide evidence of the Company’s competitive bid results for the drone services provided by the Creative Surveying vendor. If the vendor did not provide the most favorable competitive bid results, explain why the vendor incurred over 90% of the drone costs for the test year. Additionally, identify the incremental difference in drone spending for the Creative Surveying vendor compared to the lowest cost option resulting from the competitive bid process. Response: Please refer to EOE-033-SP01 i. Regarding part c, the original response to EOE-033 incorrectly showed that Creative Surveying provided drone services in the test year. Prior Referenced Response: i EOE-033-SP01 Question: (STORM – DRONE USAGE) Discuss the Company’s use of drones in support of storm remediation efforts. As part of the response, identify when the Company first started using drones, explain the nature of these services as performed by either internal or external parties, and explain how these costs have impacted (i.e., reduced) other offsetting costs (i.e., patrols). Finally, provide a detailed listing of drone expenses by year (2018 through present), identify any dronerelated capital additions (i.e., drone purchases), and identify where in the Company’s application those costs are included. EOE-033-SP01 Response: Original submission included chart with inaccurate costs. Please reference this chart along with verbiage below.Page 16 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-179 Page 2 of 2 Original Response: Eversource has utilized drones for storm restoration support of electric distribution assets since 2019 when the Company hired drone contractors. In 2020, the Company created our internal drone team and since then, the Company has utilized both contracted and internal resources for storm support. The Company’s drone teams aid in storm restoration efficiency by quickly delivering detailed images of aerial assets to a decision maker and identifying potential issues not typically seen from the ground, or in areas that cannot be traversed due to environmental factors. This in turn reduces costs by increasing reliability and reducing outages for our customers. Refer to the charts below for a listing of expenses and capital additions by year. The expenses in the test year were recorded to storm workorders and are therefore either deferred for future recovery ($293,774) or included in Exhibit CLP-REVEQ-2-A,B,C,D, Schedule C-3.28 (Storms: Non-Catastrophic / Pre-Staging Incremental Storm Expenses) ($153,000). The assets are purchased by the Service Company and those capital costs are billed to the Company as operating expenses though (1) EESCO Capital Return (Exhibit CLP-REVREQ-2-A,B,C,D, Schedule C-3.11) and (2) EESCO Depreciation expense (Exhibit CLP-REVREQ-2-A,B,C,D, Schedule C-3.35).Page 17 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-180 Page 1 of 4 Date Filed: September 25, 2026 Witness: Douglas P. Horton Request from: Office of Education, Outreach, and Enforcement Question: (STORM CARRYING COSTS) Refer to Exhibit CLP-ELP-1, pp. 122, 139- 140, Exhibit ACCT1 (Summary), and Response to OCC-143. The Company’s recovery request includes “carrying charges at the Company’s WACC from the date of cost incurrence” and includes storm events through 1Q2025, excluding events from 2Q25 through 4Q25. The Company identified that its “plan is to file the actual storm costs incurred from April 2025 through December 2026 with all supporting documentation on September 1, 2027.” Discuss if the Company intends to request “historical” carrying charges (i.e., from the date of cost incurrence) on the omitted 2Q25-4Q25 events in the subsequent proceeding. If intended to request historical carrying charges in the subsequent proceeding, explain how the omission of 2Q25-4Q25 events from the current rate case application serves to minimize (i.e., contain) costs imposed on ratepayers. Response: Please refer to the Company’s response to EOE-132, i explaining the reason that the Company’s initial filing in this docket did not include 2Q-4Q 2025 catastrophic storm events. The storm costs that the Company did not file will be timely addressed by the Company’s ratemaking proposal for storm costs in this proceeding. The Company’s application includes carrying charges at the Company’s weighted average cost of capital from the date of cost incurrence consistent with the Company’s legal position that carrying costs arise at the time that costs are deferred. However, the Company recognized in its response to OCC-522 ii that: The appropriate treatment of carrying charges may vary based on the regulatory framework established within each jurisdiction. Different regulatory constructs reflect differing policy objectives and mechanisms designed to balance the Company’s financing needs with customer impacts. In establishing a going-forward framework for storm cost recovery, the Company agrees that it would be within PURA’s discretion to strike a balance between the Company’s costs of financing storm costs while ensuring that the Company is not ‘profiting’ on a force majeure event like a storm. At bottom, the Company is seeking a reasonable rate treatment for storm costs that allows for systematic review and recovery outside of the rate-case cycle. This treatment would benefit customers, the Company, PURA and other stakeholders because it would maintain rate stabilityPage 18 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-180 Page 2 of 4 for customers, enable efficient and effective review by PURA, and allow the Company timely and adequate recovery, while minimizing carrying costs to the benefit of customers. Both Massachusetts and New Hampshire employ mechanisms that achieve these goals and those mechanisms are working effectively toward those goals. The Company’s testimony in Exhibit CLP-ELP-1, page 143, explains that “should PURA implement the SCRAF, which provides for more timely review and recovery of storm and prestaging costs, the Company accepts the Prime rate from the date of cost incurrence, applied to the net balance of the storm fund and pre-staging reserve fund for storms occurring after March, 2025.” This approach is akin to the balancing of interests implemented in both Massachusetts and New Hampshire. In addition, under this approach, carrying charges are applied symmetrically in that if the net balance of the storm fund and pre-staging reserve fund for storms reflects an over recovered position, the Company would pay carrying costs on the net over-recovered balance in the same way that it would collect carrying costs on the net under-recovered balance. Accordingly, if there is a concern about the accumulation of carrying costs, it is solved by implementing a reasonable, fair and effective ratemaking treatment starting July 1, 2027, which will encompass the outstanding storm costs. Prior Referenced Responses: i EOE-132 Question: (CATASTROPHIC STORM CUTOFF) Explain why the Company decided to omit 2Q-4Q 2025 catastrophic storm events from the rate case submission. EOE-132 Response: Please refer to the testimony of the Storms Panel filed as Exhibit CLP-STORM-1, beginning at page 94, which discusses the Company’s detailed storm invoicing quality control audit process. It can take weeks or months for the Company to receive invoices after a catastrophic storm or pre-staging event. Once an invoice is received, the Company performs its multi-step review process, which also takes weeks or months depending on each invoice’s size and complexity. Because of the delay in receiving, reviewing and approving invoices, it was not feasible to include storms occurring after March 2025 within the Company’s initial rate amendment Application. With regard to costs associated with storm events occurring after March 2025, the Company’s plan is to file the storm costs incurred from April 2025 through December 2026 with all supporting documentation on September 1, 2027. Please refer to the Company’s response to OCC-143i, as well as the testimony of the Eversource Leadership Panel in Exhibit CLP-ELP-1, beginning on page 121, for the Company’s proposal to establish a new Storm Cost Recovery Adjustment Factor (“SCRAF”) that would establish a more programmatic and timely process for review of costs associated with catastrophic storms and pre-staging event costs. Thus, with respect to storm costs incurred post-March 2025, the Company’s plan is to file the actual storm costs incurred from April 2025 through December 2026 with all supporting documentation on September 1, 2027. PursuantPage 19 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-180 Page 3 of 4 to the Company’s proposal in this case, PURA would then conduct a contested proceeding to evaluate the prudence of the incremental catastrophic storm and pre-staging event costs, the accumulated reserve balances and the potential need for a SCRAF rate change to commence recovery of prudently incurred costs. The Company’s proposal is to implement any rate changes on September 1st of the following year, aligning with the Company’s RAM Phase II rate changes on the same day. This process would continue on an annual cycle, with the Company filing the prior year’s actual storm costs with all supporting documentation on September 1st each year; with a prudence review occurring thereafter; and a potential rate change to incorporate those storm costs into the SCRAF in the following September 1st rate change. This routine cycle would avoid the accumulation of storm costs in a manner that causes rate shock for customers; would mitigate the applicability of carrying costs, lowering costs for customers and would be administratively efficient with smaller increments of storm costs presented for review at any given time. OCC-522 Question: Leadership Panel Exhibit CLP-ELP-1 – Storm Cost Recovery (Carrying charges applied to SCRAF) In its proposal, the Company notes, “should PURA implement the SCRAF, which provides for more timely review and recovery of storm and pre-staging costs, the Company accepts the Prime rate from the date of cost incurrence, applied to the net balance of the storm fund and pre-staging reserve fund 6 for storms occurring after March, 2025.” (p.143) Did the company consider or analyze setting carrying charges on costs recovered through SCRAF to be equal to the commercial paper index or the utility's actual cost of short-term debt, rather than the prime rate? a. If yes, provide the analysis conducted and the rationale for proposing the use of the prime rate instead. b. If not, explain why the Company did not consider proposing that the carrying charges on SCRAF recovery to be set at either the commercial paper index or actual cost of short-term debt. OCC-522 Response: (a) and (b) Carrying costs are the mechanism by which the Company recovers its cost of money. Thus, carrying costs must be tied to the actual cost that the Company is incurring to carry the storm deferral. When the storm deferral is relatively larger and carried for a relatively extended time period, then the Company’s weighted average cost of capital (“WACC”) is its actual carrying cost. If PURA establishes a ratemaking mechanism that provides more systematic reviews and more timely recovery, then the cost of money may be susceptible to approximation with lower cost sources of funds. The relationship between time and quantity and the cost of capital is clearly demonstrated through a utility’s cost of service whereby a utility’s rate base (comprised mainly of the Company’s plant which is paid back by customers over many years) receives a return at the Company’s authorized WACC. Applying the Company’s WACC to long-term assets aligns the carrying charge calculation with the manner in which comparable long-term assets are reflected for ratemaking purposes. Similarly, the WACC is the appropriate rate for calculating carrying charges on long-term funded regulatory assets because it reflects the Company’s actual cost of funding those customer “debts,” including storm restoration costs, over an extended period of time. Financing obligations – certainly obligations of this magnitude - cannot be supported exclusively through debt financing, whether short-term or long-term. Instead, the Company must balance its capitalPage 20 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-180 Page 4 of 4 requirements through a reasonable mix of both debt and equity to ensure financial stability and continued access to reasonably priced capital. With respect to the appropriate carrying charge rate to utilize for the Storm Cost Recovery Adjustment Factor (“SCRAF”), the Company provided a thorough response to this question in response to LFE-031 in Docket No. 2512-13. The Company is providing that response as OCC-522 Attachment 1. The analysis shows that: (1) necessary uses of cash routinely exceed available sources of cash, creating a persistent funding gap; (2) commercial paper is a tool to maintain liquidity, not to finance investments or deferred expenses; and (3) short-term borrowing capacity is limited, and the Company cannot plan to operate at or near its short-term debt capacity without putting its ability to operate the system in severe jeopardy. Given all of the considerations elucidated by Attachment 1, the Company recognizes that the appropriate treatment of carrying charges may vary based on the regulatory framework established within each jurisdiction. Different regulatory constructs reflect differing policy objectives and mechanisms designed to balance the Company’s financing needs with customer impacts. In establishing a going-forward framework for storm cost recovery, the Company agrees that it would be within PURA’s discretion to strike a balance between the Company’s costs of financing storm costs while ensuring that the Company is not ‘profiting’ on a force majeure event like a storm. This is the Company’s experience in Massachusetts, as well, where the MDPU has authorized a carrying charge rate that is different from and generally less than the Company’s WACC, but that still recognizes that the Company is using its longer-term capital resources to finance storm costs (not its shorter term commercial paper source of liquidity). Thus, the Company stated that “should PURA implement the SCRAF, which provides for more timely review and recovery of storm and pre-staging costs, the Company accepts the Prime rate from the date of cost incurrence, applied to the net balance of the storm fund and pre-staging reserve fund for storms occurring after March, 2025.”
As listed on the current system
Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)