Discovery Compilation (EOE Set 5 and UCONN Set 2)
Files3
Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
EOE Set 5_COMBINED.pdf
PDF · 1.3 MB · 169 pagesText searchable
Download EOE Set 5_COMBINED.pdfRead the text of EOE Set 5_COMBINED.pdf
UCONN Set 2_COMBINED.pdf
PDF · 372 KB · 19 pagesText searchable
Download UCONN Set 2_COMBINED.pdfRead the text of UCONN Set 2_COMBINED.pdf
Page 125 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-245 Page 2 of 2 e. The applicable contract for Sky Scape Industries LLC is located in EOE-014, Attachment 2, Page 2650.Page 126 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-246 Page 1 of 2 Date Filed: September 30, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE-TRAVEL) Refer to Exhibit ACCT-2 CLP-1, and Confidential Exhibit ACCT-2 CLP-1A-17, pp. 329-391. The Company reported an incremental charge of $273,731 for the SM Electric Group Inc vendor. The charge applied to travel (i.e., mobilization and demobilization) and standby activities. Respond to the following: a. Referring to pp. 331-332, explain why the vendor was permitted to bill for 11 hours of mobilization (travel) when the estimated travel between Rahway NJ and Rocky Hill CT is less than 3 hours or 4 hours after applying the 1.3 factor. To the extent that the billable hours are attributed to something other than travel, cite the contract provisions that permit the vendor to bill for the referenced activity and explain why it was classified as travel. As part of the response, please provide emails or other correspondence obtained during the initial review to support the hours billed. b. Referring to p. 333, explain why the vendor was permitted to bill for 5 hours of demobilization (travel) when the estimated travel between Rocky Hill CT and Rahway NJ is less than 3 hours or 4 hours after applying the 1.3 factor. To the extent that the billable hours are attributed to something other than travel, cite the contract provisions that permit the vendor to bill for the referenced activity. As part of the response, please provide emails or other correspondence obtained during the initial review to support the hours billed. c. Referring to OCC-044, Att. 2 (Confidential), p. 6138-6152, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 6144). If confirmed, identify the total amount of equipment that was billed during standby activities. If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that excludes the standard provisions. Response: a. Although travel time may be reviewed based on google map distances and application of the 1.3X multiplier, this does not take into account any potential weather, road hazards, vehicle issues or other potential delays that can affect travel time in reality. The guideline is in place to provide a reference point and real travel time is a function of real-time circumstances. Additionally, once mobilized, the time interval must encompass time to conduct safety briefs, lodging arrangements, meals and other appropriate activities that arePage 127 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-246 Page 2 of 2 included in the mob time. As noted on the time sheet at page 331, the 11 hours included “Shape up at shop, onboard/safety train new hires, prepare fleet, tooling fleet, tailboard, travel, safety training of Eversource videos.” Eversource made adjustments to the new contract and now specifically calls out those activities under the new rate structure. b. When this invoice was reviewed, the Company utilized google maps and the distance reference point of x1.3 to derive the total hours for travel to be 5.25 hours. Since the crew charged only for 5 hours, it was acceptable to the Company. The Company has googled this same route again to respond to this question and it produces the same exact hours of travel. Therefore, these travel hours are reasonable. c. Yes. Eversource confirms that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including the provision that “Standby Rates apply to labor resources only,” as referenced in OCC-044, Att. 2 (Confidential), p. 6144. The provision that "Standby Rates apply to labor resources only" should not be interpreted to mean that equipment cannot be billed during periods when crews are awaiting assignment or direction. Rather, the provision establishes that a contractual Standby Rate applies only to labor resources and does not create a separate standby rate for equipment. Those equipment rates are charged during all hours that the equipment resources are made available to or are utilized to support the company. Please refer to the Company’s response to EOE-267, for more context and detail regarding the billing of equipment. The same standard provisions apply to the Exhibit A Pricing Schedule incorporated into the vendor’s contract for the applicable work. The total amount of equipment charges associated with periods identified as “standby” on the contractor’s timesheets was $4,273.95.Page 128 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-247 Page 1 of 2 Date Filed: September 29, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-18, pp. 1-108. The Company reported four incremental charges in the combined amount of $2,578,455 for the Sparks Energy Inc vendor. Respond to the following: a. Provide an unlocked Excel spreadsheet analyzing the total billable travel hours (i.e., both labor and equipment) for each invoice based on the billed travel time versus the estimated travel time. To the extent that the billed travel hours were in excess of 1.3 times the estimated hours, please provide any existing documentation that supports the evaluation and approval of the excess billed hours, as well as an estimated cost impact of the excess costs. b. Referring to OCC-044, Att.2 (Confidential), p. 6153-6203, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 6159). If confirmed, identify the total amount of equipment that was billed during standby activities. If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that excludes the standard provisions. Response: a. Please refer to EOE-247, Attachment 1, for a spreadsheet summarizing the travel details requested in subpart (a). During the Tier 3 review, both mobilization (“Mob”) and demobilization (“DeMob”) travel hours were examined. The Company determined that, considering the distance, the hours traveled, and the weather conditions, these hours were not excessive and were therefore approved. b. Yes. The vendor’s Exhibit A Pricing Schedule contained the Company’s standard provisions, including the provision stating that “Standby Rates apply to labor resources only” (OCC-044, Att. 2 CONFIDENTIAL, p. 6159). The provision that "Standby Rates apply to labor resources only" should not be interpreted to mean that equipment cannot be billed during periods when crews are awaiting assignment orPage 129 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-247 Page 2 of 2 direction. Rather, the provision establishes that a contractual Standby Rate applies only to labor resources and does not create a separate standby rate for equipment. Those equipment rates are charged during all hours that the equipment resources are made available to or are utilized to support the company. Consistent with the contract, the total amount of equipment that was billed during standby totaled to $207,112.Page 130 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-248 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-18, pp. 114-115. The Company reported an incremental charge of $996 for the Stanley Tree Service Inc vendor. The Eversource Connecticut Weekly Operations Report (i.e., p.115) that accompanied the invoice (i.e., p.114) does not appear to be related. Please provide the correct supporting documents demonstrating applicability of the costs to the storm event. Response: Page 115 was mistakenly uploaded. The associated timesheet to match the invoice on page 114 is included as EOE-248, Attachment 1.Page 131 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-249 Page 1 of 2 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-CONST REPS; WIRE GUARDS) Refer to Exhibit ACCT-2 CLP-1, and Confidential Exhibit ACCT-2 CLP-1A-19, pp. 1-401. The Company reported an incremental charge of $146,312 for the Storm Services Engineering LLC vendor for wire guard services. The Company supported the requested incremental charge with a consolidated invoice documents that appear to support travel from throughout New York. Respond to the following: a. Explain why the consolidated invoice does not agree with the amounts requested for recovery. Specifically, the invoice identifies a summarized charge of $141,590 (p.1) versus the requested amount of $146,312. b. Confirm that the wire guards were not utilized for remediation services (i.e., guarding downed wires). If not confirmed, cite the supporting documents demonstrating the actual services that were rendered. c. Provide an unlocked Excel spreadsheet that summarizes the total number of wire down guards by mobilization/demobilization location, the total distance between the locations, the hours billed for mobilization, the hours billed for demobilization, the hours billed for standby, the costs applicable to mobilization, the costs applicable to demobilization, and the costs applicable to standby. If response to subsection (b) identifies actual remediation, please also include the details attributed to work. d. Provide documentation to support the specific efforts performed by the Company to obtain local (in-state) wire down guard crews in lieu of the out-of-state crews employed by Storm Services Engineering LLC. Response: a. The difference of $4,722 between the summarized charge and the requested recovery is due to taxes. b. Leading up to the event, the Company monitored forecasts for a powerful, winter storm with moderate-to-heavy rainfall, snow in the northwest hills, and strong damaging wind. Sustained winds were predicted to range from 16-35 mph, with peak wind gusts rangingPage 132 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-249 Page 2 of 2 from 45-50 mph, and higher gusts of up to 57 mph predicted to occur in the southeast coastal areas. Based on the forecast, the Company procured Wire Guards from Storm Services Engineering LLC to perform wire guard functions exclusively. Due to the storm not materializing as forecasted, Storm Services Engineering LLC resources were not deployed to the field. The associated charges were related to mobilization, time awaiting potential deployment and demobilization. c. Please refer to EOE-249, Attachment 1 CONFIDENTIAL, which contains an unlocked Excel spreadsheet providing the requested summary details. In accordance with the contractor's rate schedule, labor rates are based on hours worked and applicable overtime thresholds rather than the specific task being performed. The applicable labor rates were validated against the contractor's rate schedule, which provides for Straight Time billing for the first 40 hours worked in a week and Overtime billing only after an individual exceeds a 12-hour shift or 40 weekly hours. As a result, personnel remained billable at the applicable contractual rate while assigned to the event, regardless of whether they were actively monitoring a downed wire or temporarily awaiting deployment to the next assignment. d. Acquisition of Wire Guard resources is performed by leveraging a list of Contracted contractors that perform this type of service. The list of Contractors has the location of resources. The Acquisition team begins the acquisition process by first calling all contractors within the service territory and working outward until the request is satisfied. All acquisitions are conducted based on available resources at the time of need.Page 133 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-250 Page 1 of 2 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-CONST REPS) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-19, pp. 402-780. The Company reported an incremental charge of $315,354 for the Storm Services Engineering LLC vendor for damage assessment services. The Company supported the requested incremental charge with a consolidated invoice demonstrating travel from multiple states throughout the country. Respond to the following: a. Explain why the invoice does not agree with the amounts requested for recovery. Specifically, the invoice identifies a summarized charges of $305,177 (p.402) versus the requested amount of $315,354. b. Confirm that the damage assessors were not utilized for remediation services. If not confirmed, cite the supporting documents demonstrating the actual services that were rendered. c. Provide an unlocked Excel spreadsheet that summarizes the total number of damage assessors by mobilization/demobilization location, the total distance between the locations, the hours billed for mobilization, the hours billed for demobilization, the hours billed for standby, the costs applicable to mobilization, the costs applicable to demobilization, and the costs applicable to standby. If response to subsection b identifies actual remediation, please also include the details attributed to work. d. Provide documentation to support the specific efforts performed by the Company to obtain local (in-state) damage assessors in lieu of the out-of-state crews employed by Storm Services Engineering LLC. Response: Please refer to Exhibit ACCT-2 (CLP-1) (MS24A), Outside Contractors-Vendors, at Line 507, vendor Storm Services Engineering LLC, totaling in the amount of $315,534. a. Referring to Confidential Exhibit ACCT-2 CLP-1A-19, page 402, vendor Storm Services Engineering LLC (“Storm Servies”), in the amount of $315,534. The charge represents the invoice amount of $305,177 plus tax of $10,177.64. Please reference subpart c. as this amount is subject to change upon final review.Page 134 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-250 Page 2 of 2 b. Storm Services were requested to support Damage Assessment on 1/8/2024 to be ready for the incoming storm on 1/9-1/10/2024. The storm did not produce the expected damage, and Storm Services were released on 1/10/2024. The time sheets provided by Storm Services show their start and end dates. The email attached shows the end date of this weather event for most DA personnel (Planning Section Release 1-10-2024). c. The Company’s review of the requested materials is ongoing. Any additional responsive documentation identified through the course of that review will be provided through a supplemental response upon completion of the Company’s records collection and verification process. d. The efforts performed by the Company to obtain local (in-state) damage assessors in lieu of the out-of-state crews employed by Storm Services involves first contacting all contractors within the immediate service territory and then working outward until the request is satisfied. This prioritizes local (in-state) damage assessors due to their proximity of the affected service territory.
As listed on the current system
Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)