  1. Page 135 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-251 Page 1 of 4 Date Filed: September 30, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1, and Confidential Exhibit ACCT-2 CLP-1A-19, pp. 790-915. The Company reported three incremental charges in the combined amount of $1,587,445 for the Support Operations Services LLC (SOS) vendor. Respond to the following: a. Provide a narrative discussion detailing the engagement, travel, and activities performed by the SOS vendor for the MS24A event. As part of the discussion, explain why certain Eversource Contractor Storm Daily Time & Work Reports referenced crews traveling to Marlborough, MA in lieu of directly to CT (see e.g., p. 822). Additionally, discuss the vendor’s use of vehicles to include both those used to travel to CT, as well as the vendor’s use of the Storm Fleet. b. Comparing p. 809, with p. 810, explain how each of the vendor employees billed for eight hours of travel that concluded at 1400 on January 9, 2024 (p. 809), and commenced billing for four hours of work time starting at 1300 (p. 810). As part of the response, identify the gross impact of each vendor employee duplicating the billing for the hour between 1300 and 1400. c. Comparing p. 821, with pp. 822-824, explain how each of the vendor employees billed for eight hours of travel that concluded at 1400 on January 9, 2024 (p. 821), and commenced billing for three hours of work time starting at 1130 (pp. 822-824). As part of the response, identify the gross impact of each vendor employee duplicating the billing for the 2.5 hours between 1130 and 1400. d. Referring to OCC-044, Att. 2 (Confidential), p. 6331-6392, confirm that the vendor’s Exhibit A, Pricing Schedule, contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 6338). If confirmed, identify the total amount of equipment that was billed during standby activities. If not confirmed, cite the revised Exhibit A, Pricing Schedule, that was executed (signed) for 2024 and 2025 that excludes the standard provisions. e. Provide an unlocked Excel spreadsheet detailing each vendor employee’s billing activity for specific hours and days with citations to supporting documents. This request attempts to verify both the accuracy of total hours billed (i.e., in relation to the invoices) and to identify if there are additional instances (i.e., in addition to subsections b and c) where vendor employees duplicated hours billed.
  2. Page 136 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-251 Page 2 of 4 Response: a. SOS was engaged to provide supplemental storm restoration resources in support of the MS24A event, including line crews, supervisors, safety personnel, mechanics, and other support staff assigned to restoration activities in Connecticut. References in certain Eversource Contractor Storm Daily Time & Work Reports to Marlborough and/or Shrewsbury, Massachusetts reflect the staging, vehicle assignment, and demobilization processes utilized for the event. SOS personnel were assigned a combination of contractor-provided pickup trucks and Eversource Storm Fleet vehicles. Certain Eversource Storm Fleet assets, including bucket trucks utilized by line crews, were staged in Massachusetts. As a result, some SOS personnel were required to travel to the Massachusetts staging location to obtain assigned vehicles prior to deployment to Connecticut and/or to return those vehicles following completion of their storm assignment. The Daily Time & Work Reports include activities associated with this process, including the return of trucks from Connecticut to the Massachusetts staging location for check-in. Accordingly, references to travel to Marlborough or Shrewsbury do not indicate that SOS was performing storm restoration work in Massachusetts. Rather, the travel was associated with the mobilization, assignment, movement, and return of vehicles supporting the crews performing restoration work in Connecticut. Contractor-provided pickup trucks were generally utilized by supervisory, safety, mechanical, and other support personnel, while line crews primarily utilized Eversource Storm Fleet bucket trucks and other assigned Storm Fleet assets to perform restoration activities in Connecticut. b. Upon further review in drafting this response, the Company identified that there was an overcharge of one hour. This resulted in an overcharge of $6,963.05. Please refer to part (c) for final total adjustment. c. The Company has also identified an additional overcharge of 2.5hrs, resulting in an additional adjustment of $17,689.75. Accordingly, the Company will supplement ACCT2 CLP-1 (MS24A), line 516, to reflect the amount of $644,105.20. d. The vendor’s Exhibit A Pricing Schedule contains the Company’s standard provision stating, “Standby Rates apply to labor resources only,” as reflected on p. 6338 of OCC044, Att. 2 (Confidential).
  3. Page 137 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-251 Page 3 of 4 The provision that "Standby Rates apply to labor resources only" should not be interpreted to mean that equipment cannot be billed during periods when crews are awaiting assignment or direction. Rather, the provision establishes that a contractual Standby Rate applies only to labor resources and does not create a separate standby rate for equipment. Those equipment rates are charged during all hours that the equipment resources are made available to or are utilized to support the company. Equipment was charged for the total amount of $1,388.06. Please refer to the Company’s response to EOE-267 i, for additional detail regarding billing for Equipment during Standby. e. The Company will supplement this response with the requested spreadsheets that will detail the billing activity as requested. Prior Referenced Response: i EOE-267 Question: (LINE CREWS) For each storm in the Company’s recovery request, identify the total amount of equipment that was billed by line crew vendors during standby activities. Please provide the information in an unlocked excel spreadsheet allocating each cost to a specific vendor by storm event. EOE-267 Response: The Company’s accounting system does not separately track amounts billed by vendors for equipment during standby. Accordingly, the Company cannot generate the requested spreadsheet directly from its accounting system to provide the details requested. Information regarding equipment charges is contained within the underlying vendor invoices and supporting documentation submitted as part of the Company’s filing. For additional context regarding these charges, the Company’s policy for billing equipment is described below: In the years 2018 through 2023, the Company’s contractual terms provided that standby rates were charged only to labor rates, not to equipment. This policy followed from the fact that, when vendor crews commit to perform work for the Company, their equipment is dedicated for the full duration of the engagement, preventing the use of that equipment somewhere else. This commitment of vendor equipment extends beyond working hours, as vendors must remain ready and available so long as they are committed to the Company’s restoration effort. This policy also reflects the fact that labor rates vary depending on the demands and associated risk placed on the field crews for their performance (i.e., standby rates are lower than work rates), where vendor equipment is tied up regardless of the work status of the vendor’s crews. Specifically, the contract language “Standby Rates apply to labor resources only” was applied so that there was no separate standby rate for equipment and equipment was, instead, billed at the same rate regardless of the crew’s work status (e.g. travel, standby, or work time). The Company’s policy acknowledged that it was paying for exclusive access to the vendor’s equipment throughout the event, compensating vendors for their lost opportunity cost. Not
  4. Page 138 of 169Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-251 Page 4 of 4 paying for equipment during standby would discourage vendors from committing their resources to the Company in storms with competitive procurement of crews among regional utilities. In January 2022, Eversource Energy received the final report of an independent assessment of the “Eversource ERP Capability,” prepared by Accenture LLC. This assessment was undertaken by Eversource Energy as part of a regulatory compliance initiative beginning in September 2021. In this assessment, Accenture made several recommendations regarding the Eversource Energy ERP organization, including a recommendation to expand the emergency-management organization and capabilities by creating an executive role to oversee the enterprise emergency-management program with greater visibility and decision-making authority within the overall organization. Specifically, Accenture recommended establishing regionally based directors to oversee the implementation of program initiatives and manage state-specific relationships; expanded oversight and governance coordination of risk mitigation and resiliency initiatives; and additional training and exercise design personnel. Over the next two years, Eversource Energy implemented the Accenture recommendations, expanding and formalizing the emergency-management organization with a new vice president role and several new director roles to improve overall emergency-response preparedness and associated business processes. As part of this organizational initiative, Eversource Energy formalized the role of Director of Emergency Preparedness Logistics and Resource Acquisition in late 2023, vesting this role with responsibility for contract services relating to emergency management. This change placed control of vendor contracts in the hands of the team directly responsible for resource acquisition in emergency events. Following this organizational change, the emergency-management team launched a supplier cost-optimization review to identify opportunities for greater cost control in the tough environment of competitive procurement of contract resources. Working together, the Company’s contracts and procurement teams identified the discounting or elimination of equipment charges during standby time as one of several strategies that could help to contain storm restoration costs. The Company began to shift its policy on standby rates for equipment starting in late 2023, working with vendors throughout 2024 to negotiate changes to the former payment policy. This shift in policy applied in various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors— and containing costs. The Company’s current Master Services Agreement reflects this updated policy.
  5. Page 139 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-252 Page 1 of 2 Date Filed: September 25, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-20, pp. 1-34. The Company reported 11 incremental charges for a total of $35,510 for the Tennett Tree Service Inc vendor. Respond to the following: a. Ten of the eleven invoices included extra charges for atypical equipment, including additional saws, chippers, chip trucks, and a crane. Please identify the total incremental amount associated with this equipment. Additionally, provide documentation to support the Company’s preauthorization of these costs. b. Three of the invoices include services performed on January 12, 2024 (i.e., rows 520, 527, 528). Provide documentation to support the applicability of the services performed on January 12 to the MS24A event. c. One invoice included a miscellaneous charge of $300 that appears to have been supported by illegible documents (i.e., row 528, supported by p. 31). Provide a legible version of the documentation included on p. 31 and explain what the $300 miscellaneous charge represents and how those charges were necessary for storm recovery purposes. Response: a. The additional equipment charges were incurred for storm-response tree work involving storm-damaged trees and conditions that required equipment beyond a standard tree crew configuration. During storm restoration, larger chainsaws are permitted and may be billed so that crews have the appropriate equipment available when needed. Because storm work is unscheduled and crews do not know in advance the size, condition, or complexity of the trees they will encounter, it is necessary for crews to maintain access to larger saws capable of safely addressing large-diameter trees. Similarly, Company arborists may approve the use of chippers, additional chip trucks, cranes, or other equipment when site conditions warrant their use for safety, operational efficiency, or restoration purposes. For example, chippers may be necessary where debris accumulation would create safety hazards, obstruct traffic, or impede access to electric facilities. Cranes may be required to safely remove storm-damaged trees or large tree sections that are broken, suspended, leaning precariously, or entangled with other trees or structures, where conventional removal methods would present an increased risk to
  6. Page 140 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-252 Page 2 of 2 workers, the public, or nearby property. The need for such equipment is evaluated in the field by the supervising Company arborist, and the arborist's approval and sign-off on the associated work serves as documentation supporting authorization of these storm-related costs. The total incremental amount associated with saws, chippers, chip trucks, and a crane was $3,844.91. b. The tree work performed on January 12, 2024, was associated with the MS24A event and involved the remediation of trees or tree parts damaged by that storm. Storm-related tree work commonly extends beyond the initial impact date and electric restoration date as tree crews continue removing storm damaged trees and branches that were structurally compromised due to the storm event. Customers and tree wardens may call to report storm damaged trees days and weeks after the initial storm event. The Company's verification that the work was attributable to MS24A is based on the Company arborist's oversight of the work and approval of the associated contractor timesheets and invoices. c. The $300 miscellaneous charge represents wood disposal and log removal services necessary to support storm restoration activities. While debris is left on-site for most storm-related calls, certain conditions require removal when leaving logs would create a public safety hazard or obstruct roadway access. During storm response, log trucks may be used to remove large trunk sections and, when necessary, safely support unstable tree sections with their grapples where no safe drop zone exists. In areas with limited shoulder space or other site constraints, immediate removal of logs helps safely clear roadways and maintain restoration progress. Log trucks also improve restoration efficiency by removing large trunk sections that would otherwise require significant time for ground crews to cut, move, and secure manually. The use of these services was approved through the Company's storm restoration oversight process and was necessary to facilitate roadway clearing and the safe restoration of electric service. The Company will supplement with a more legible copy of the documentation if one can be located.
  7. Page 141 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-253 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT2 CLP-1A-20, pp. 35-40. The Company reported two incremental charges for a total of $1,400 for the Town of Ellington. The first charge was referenced to project/work order number 13667145 supporting MJ Electric starting at 8am on January 9, 2024 (i.e., pp. 35-36). The second charge did not identify a project/work order number but related to activity starting at 8am on January 9, 2024 (i.e., p. 39). Both invoices applied to activity that occurred prior to the onset of the MS24A event as referenced in CLP-STORM-IMT-3. Respond to the following: a. Referring to pp. 35-36, explain why services were billed for nine hours when the documentation details services for the hours of 0800 and 1400, or a total of eight hours. b. Referring to pp. 35-36, explain why charges applicable to the work order number 13667145 and for hours that preceded the MS24A event were allocated to the event. c. Comparing pp. 35-36 with the MJ Electric documentation at pp. 193-212, identify where the corresponding line crew costs are located. d. Referring to p. 38-39, explain why services were billed for five hours when the documentation details services for the hours of 0800-1000, or a total of two hours. e. Referring to p. 38-39, explain why services that preceded the MS24A event were allocated to the event. f. If the responses to subsections (a)-(e) support the continued inclusion of the two charges, provide documentation demonstrating the applicability of the two charges to the MS24A event. Response: Please refer to Exhibit ACCT-2 CLP-1 (MS24A), Outside Contractors-Vendors, line 530 through line 531, vendor Town of Ellington, invoices totaling in the amount of $1,400. a. Referring to Confidential Exhibit ACCT-2 CLP-1A-20, page 35 through 36, the Company determined that these costs are not associated with the event. The Company will supplement ACCT-2 CLP-1 (MS24A), to remove line 530 in the amount of $900. b. Please refer to subpart a. c. Please refer to subpart a. Eversource - Internal Use
  8. Page 142 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-253 Page 2 of 2 d. Referring to Confidential Exhibit ACCT-2 CLP-1A-20, pages 38-39, for vendor Town of Ellington, please refer to page 40, bullet point three. The documentation identified therein provides support for the additional hour charged beyond the initial four (4) hours billed. Specifically, the referenced supporting records substantiate that the additional hour was incurred in connection with the hours charged and supports the total time charged by the vendor. Accordingly, the supporting documentation demonstrates that the full five (5) hours billed were appropriate and attributable to the services rendered. e. The Company directly charges incremental storm costs to the specific storm event based on the dates during which the event occurred. The costs associated with this invoice were charged directly to the January 9, 2024 storm event because the scheduled services were procured and maintained in anticipation of the forecasted storm conditions beginning on that date. At the time the scheduling and resource decisions were made, the Company reasonably anticipated the need for storm response and restoration activities and therefore retained the requested services to support its emergency preparedness efforts. Although the officers were ultimately canceled, the cancellation occurred as a direct result of the storm event. f. Please refer to subparts (a) through(e). Eversource - Internal Use
  9. Page 143 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-254 Page 1 of 2 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-CONST) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT2 CLP-1A-20, pp. 70-111. The Company reported two incremental charges for a total of $39,874 for the United Utility Service Holdings LP vendor. Respond to the following: a. Explain what specific services were provided by the various individuals represented within the invoices to include Crew Guides, External Resource Field Coordinators, Construction Managers (clearance) Level 3, Construction Managers (clearance) Level 2, Senior Construction Manager (clearance), and Senior Project Manager. b. Referring to p. 89, explain why there are various charges applicable to January 13, 2024, when that date appears to align with a later event (i.e., MS24B). Provide all related documentation supporting those charges. c. Cite the location of both the contract and the specific pricing schedule applicable to the MS24A event and corresponding services provided. Response: a. For the vast majority of storm events ERFC’s are staffed by Company employees. During very large events or events where multiple states are being affected, we have created a list of predominately retiree employees that work for a vendor whom we hire to perform this function. This position is critical because it is our physical oversite of the contractor line resources, we hire to verify their hours worked and their physical activities in the field. The individuals listed within the invoices fill the role of an “ERFC” (External Resource Field Coordinator). The duties and responsibilities of the ERFC include coordinating the activities of crews assigned to them, communicating the restoration strategy to the crews, and providing them with logistical details and support concerning food and lodging. Additionally, the ERFC provides two-way communications regarding damage, restoration times, and materials needed between the Operations Coordinator in the RMT and field crews. As an ESOP-100 APL (Authorized Persons List) Qualified person, they are qualified to hold clearances for contractors and to coordinate tagging and switching with the RMT System Operators.
  10. Page 144 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-254 Page 2 of 2 b. Upon review in drafting this response, the Company has identified an error within the submitted amount for ACCT-2 CLP-1 (MS24A), Outside Contractors-Vendors, Line 540, and ACCT-2 CLP-2 (MS24B), Outside Contractors-Vendors, Line 558, vendor United Utility Services Holdings LP. The Company will adjust ACCT-2 CLP-1 (MS24A), line 540 to reflect $17,401. In addition, ACCT-2 CLP-2 (MS24B), line 558 will be adjusted to reflect $5,487.68. c. The contracts applicable to the two invoices are located in EOE-014 Attachment 2, Page 2891 and EOE-014 Attachment 2, Page 4060.