Discovery Compilation (EOE Set 5 and UCONN Set 2)

Files3

Search terms highlighted
Eversource rate increase is on 11 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
9 pages match
  1. Page 140 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-252 Page 2 of 2 workers, the public, or nearby property. The need for such equipment is evaluated in the field by the supervising Company arborist, and the arborist's approval and sign-off on the associated work serves as documentation supporting authorization of these storm-related costs. The total incremental amount associated with saws, chippers, chip trucks, and a crane was $3,844.91. b. The tree work performed on January 12, 2024, was associated with the MS24A event and involved the remediation of trees or tree parts damaged by that storm. Storm-related tree work commonly extends beyond the initial impact date and electric restoration date as tree crews continue removing storm damaged trees and branches that were structurally compromised due to the storm event. Customers and tree wardens may call to report storm damaged trees days and weeks after the initial storm event. The Company's verification that the work was attributable to MS24A is based on the Company arborist's oversight of the work and approval of the associated contractor timesheets and invoices. c. The $300 miscellaneous charge represents wood disposal and log removal services necessary to support storm restoration activities. While debris is left on-site for most storm-related calls, certain conditions require removal when leaving logs would create a public safety hazard or obstruct roadway access. During storm response, log trucks may be used to remove large trunk sections and, when necessary, safely support unstable tree sections with their grapples where no safe drop zone exists. In areas with limited shoulder space or other site constraints, immediate removal of logs helps safely clear roadways and maintain restoration progress. Log trucks also improve restoration efficiency by removing large trunk sections that would otherwise require significant time for ground crews to cut, move, and secure manually. The use of these services was approved through the Company's storm restoration oversight process and was necessary to facilitate roadway clearing and the safe restoration of electric service. The Company will supplement with a more legible copy of the documentation if one can be located.
  2. Page 141 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-253 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT2 CLP-1A-20, pp. 35-40. The Company reported two incremental charges for a total of $1,400 for the Town of Ellington. The first charge was referenced to project/work order number 13667145 supporting MJ Electric starting at 8am on January 9, 2024 (i.e., pp. 35-36). The second charge did not identify a project/work order number but related to activity starting at 8am on January 9, 2024 (i.e., p. 39). Both invoices applied to activity that occurred prior to the onset of the MS24A event as referenced in CLP-STORM-IMT-3. Respond to the following: a. Referring to pp. 35-36, explain why services were billed for nine hours when the documentation details services for the hours of 0800 and 1400, or a total of eight hours. b. Referring to pp. 35-36, explain why charges applicable to the work order number 13667145 and for hours that preceded the MS24A event were allocated to the event. c. Comparing pp. 35-36 with the MJ Electric documentation at pp. 193-212, identify where the corresponding line crew costs are located. d. Referring to p. 38-39, explain why services were billed for five hours when the documentation details services for the hours of 0800-1000, or a total of two hours. e. Referring to p. 38-39, explain why services that preceded the MS24A event were allocated to the event. f. If the responses to subsections (a)-(e) support the continued inclusion of the two charges, provide documentation demonstrating the applicability of the two charges to the MS24A event. Response: Please refer to Exhibit ACCT-2 CLP-1 (MS24A), Outside Contractors-Vendors, line 530 through line 531, vendor Town of Ellington, invoices totaling in the amount of $1,400. a. Referring to Confidential Exhibit ACCT-2 CLP-1A-20, page 35 through 36, the Company determined that these costs are not associated with the event. The Company will supplement ACCT-2 CLP-1 (MS24A), to remove line 530 in the amount of $900. b. Please refer to subpart a. c. Please refer to subpart a. Eversource - Internal Use
  3. Page 142 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-253 Page 2 of 2 d. Referring to Confidential Exhibit ACCT-2 CLP-1A-20, pages 38-39, for vendor Town of Ellington, please refer to page 40, bullet point three. The documentation identified therein provides support for the additional hour charged beyond the initial four (4) hours billed. Specifically, the referenced supporting records substantiate that the additional hour was incurred in connection with the hours charged and supports the total time charged by the vendor. Accordingly, the supporting documentation demonstrates that the full five (5) hours billed were appropriate and attributable to the services rendered. e. The Company directly charges incremental storm costs to the specific storm event based on the dates during which the event occurred. The costs associated with this invoice were charged directly to the January 9, 2024 storm event because the scheduled services were procured and maintained in anticipation of the forecasted storm conditions beginning on that date. At the time the scheduling and resource decisions were made, the Company reasonably anticipated the need for storm response and restoration activities and therefore retained the requested services to support its emergency preparedness efforts. Although the officers were ultimately canceled, the cancellation occurred as a direct result of the storm event. f. Please refer to subparts (a) through(e). Eversource - Internal Use
  4. Page 143 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-254 Page 1 of 2 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-CONST) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT2 CLP-1A-20, pp. 70-111. The Company reported two incremental charges for a total of $39,874 for the United Utility Service Holdings LP vendor. Respond to the following: a. Explain what specific services were provided by the various individuals represented within the invoices to include Crew Guides, External Resource Field Coordinators, Construction Managers (clearance) Level 3, Construction Managers (clearance) Level 2, Senior Construction Manager (clearance), and Senior Project Manager. b. Referring to p. 89, explain why there are various charges applicable to January 13, 2024, when that date appears to align with a later event (i.e., MS24B). Provide all related documentation supporting those charges. c. Cite the location of both the contract and the specific pricing schedule applicable to the MS24A event and corresponding services provided. Response: a. For the vast majority of storm events ERFC’s are staffed by Company employees. During very large events or events where multiple states are being affected, we have created a list of predominately retiree employees that work for a vendor whom we hire to perform this function. This position is critical because it is our physical oversite of the contractor line resources, we hire to verify their hours worked and their physical activities in the field. The individuals listed within the invoices fill the role of an “ERFC” (External Resource Field Coordinator). The duties and responsibilities of the ERFC include coordinating the activities of crews assigned to them, communicating the restoration strategy to the crews, and providing them with logistical details and support concerning food and lodging. Additionally, the ERFC provides two-way communications regarding damage, restoration times, and materials needed between the Operations Coordinator in the RMT and field crews. As an ESOP-100 APL (Authorized Persons List) Qualified person, they are qualified to hold clearances for contractors and to coordinate tagging and switching with the RMT System Operators.
  5. Page 144 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-254 Page 2 of 2 b. Upon review in drafting this response, the Company has identified an error within the submitted amount for ACCT-2 CLP-1 (MS24A), Outside Contractors-Vendors, Line 540, and ACCT-2 CLP-2 (MS24B), Outside Contractors-Vendors, Line 558, vendor United Utility Services Holdings LP. The Company will adjust ACCT-2 CLP-1 (MS24A), line 540 to reflect $17,401. In addition, ACCT-2 CLP-2 (MS24B), line 558 will be adjusted to reflect $5,487.68. c. The contracts applicable to the two invoices are located in EOE-014 Attachment 2, Page 2891 and EOE-014 Attachment 2, Page 4060.
  6. Page 145 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-255 Page 1 of 2 Date Filed: September 30, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE; WIRE GUARDS) Refer to Exhibit ACCT-2 CLP-1, and Confidential Exhibit ACCT-2 CLP-1A-20, pp. 112-118. The Company reported an incremental charge of $58,604 for the Vision Utilities Inc vendor for Wire Guards. Respond to the following: a. Please provide a description of the work performed including any remediation, date, and location of the work performed by the wire guards during Storm Event MS24A. Include in the response all documentation supporting the work performed. b. Confirm that the wire guards were not utilized for remediation services (i.e., guarding downed wires). If not confirmed, cite the supporting documents demonstrating the actual services that were rendered. c. Provide an unlocked Excel spreadsheet that summarizes the total number of wires down guards, the total distance between the mobilization/demobilization location, the hours billed for mobilization, the hours billed for demobilization, the hours billed for standby, the costs applicable to mobilization, the costs applicable to demobilization, and the costs applicable to standby. If response to subsection (a) identifies actual remediation, please also include the details attributed to work. d. Provide documentation to support the specific efforts performed by the Company to obtain local (in-state) wire down guard crews in lieu of the out-of-state crews employed by Vision Utilities Inc. e. Please provide the contract and the specific pricing schedule applicable to the MS24A event for the wire guard services. To the extent that the contract includes the standard Exhibit A Pricing Schedule (i.e., the MSA template that contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” as referenced in OCC044, Att. 2 Confidential, p. 6883), please also identify the total amount of equipment that was billed during standby. Response: a. & b. Wire Guards procured from Vision Utilities Inc. (“Vision Utilities”) were retained solely to perform wire guard functions, as needed. Ultimately, the storm did not materialize as forecasted and Vision Utilities resources were not deployed to the field. Accordingly, no wire guard services were performed in the field during Storm Event MS24A.
  7. Page 146 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-255 Page 2 of 2 c. Please refer to EOE-255, Attachment 1, containing an unlocked Excel spreadsheet providing the requested summary details. Please note that this contingent of wire guards mobilized from New Jersey and traveled to Groton, Connecticut, approximately 246 miles each way from their point of origin. d. Eversource seeks to secure the most commercially competitive suppliers with the closest available qualified wire down guard resources to support storm response activities. The resource acquisition process begins with outreach to available local and regional resources and expands geographically as necessary to satisfy forecasted staffing requirements, with priority given to qualified suppliers under existing agreements. Resource availability is often impacted by the geographic scope of the weather event and competing demand across affected utilities. Accordingly, Eversource attempts to utilize local resources where available and supplements those resources with regional crews when local availability is insufficient to meet operational needs. For MS24A, the Company contacted available resources within the region and expanded its requests as necessary to obtain the required staffing levels. Due to storm-related demand and resource availability constraints, resources from outside Connecticut were utilized to supplement locally available wire down guard personnel. e. These charges were supported by a standalone purchase order issued as an exception during Storm Event MS24A to address an emergent operational requirement. Therefore, no Master Agreement or Exhibit A was applicable. Please refer to EOE-255, Attachment 2, which includes the Purchase Order and associated Rate Sheet. Together, these documents constitute the applicable agreement, pricing, and terms for the services provided. Pricing was secured prior to issuance of the Purchase Order and included labor service rates only. No material rates were included, and no material charges were supported by the invoice in question. The applicable rates were based on hours incurred in accordance with the agreed-upon pricing schedule. Straight Time rates applied for the first 40 hours worked within a week, and Overtime rates applied when an individual exceeded the contractual overtime thresholds. Accordingly, labor charges were determined based on total hours incurred rather than whether personnel were actively deployed or awaiting potential assignment.
  8. Page 147 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-256 Page 1 of 3 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-20, pp. 119-138. The Company reported an incremental charge of $313,757 for the Vision Utilities Inc vendor. Respond to the following: a. Referring to pp. 121 and 125, explain the specific work that was performed in support of the storm event. As part of the response, please clarify if the crews’ activity was limited to standby or if they failed to fully complete the timesheets as outlined within the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att. 5. b. Explain why the invoice (i.e., p. 119) includes two categories of standby billing when the vendor’s pricing schedule (i.e., OCC-044, Att. 2 Confidential, p. 6886) identifies only a single classification of standby at a lower rate than billed. As part of the response, please identify the cumulative impact of permitting the vendor to bill at the higher standby rate versus the lower standby rate included within the pricing schedule. To the extent that certain hours were billed at the correct rates and others were billed at the incorrect rates, please provide an unlocked Excel spreadsheet demonstrating the calculation and cite the relevant documents. c. Referring to OCC-044, Att.2 (Confidential), p. 6876-6924, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 6883). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that excludes the standard provisions. d. If subsection (c) is confirmed, identify the total impact of equipment charges that were billed during standby activities. Response: a. Vision Utilities Inc. performed storm work during MS24A, as confirmed by the multiple OMS tickets assigned to this contractor during their shift on January 10, 2024 (see table below). The notes from these numerous events include extensive tree clearing, re-hanging a considerable amount of wire, and replacing transformers. Once a contractor begins a shift, the applicable working rate remains in effect for the duration of that shift.
  9. Page 148 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-256 Page 2 of 3 b. Contractors submit timesheets documenting a general description of the work activities performed during each shift. If a contractor indicates “standby” as their activity, this does
  10. Page 149 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-256 Page 3 of 3 not necessarily mean that the contractor is being compensated at the standby rate. A contractor may use the term “standby” on their timesheet to indicate that they were awaiting dispatch or a new assignment during their shift. However, once the contractor’ shift has commenced, the applicable working rate remains in effect for the full duration of the shift. c. This is confirmed. The vendor’s Exhibit A Pricing Schedule, contains the Company’s standard provision stating that “Standby Rates apply to labor resources only.” The Company reiterates that the term “standby” may also appear on a contractor’s timesheet as a description of the activity or status of a resource during a particular period. For example, a contractor may use “standby” to describe time between assigned tickets, time prior to receiving a ticket, or time following completion of a ticket while awaiting further direction from the Company. The use of the term “standby” on a timesheet does not, by itself, indicate that the contractor is entitled to bill that time at the contractual standby rate. In many such circumstances, the contractor’s resources have already mobilized to an assigned on-set or staging location, are fully prepared and available to perform work, and are awaiting further direction or assignment from Eversource. Such time may therefore be compensable at the applicable working rate depending on the circumstances, notwithstanding the contractor’s use of “standby” as a descriptive notation on its timesheet. d. Equipment was charged in the total amount of $8,352.
2 pages match

As listed on the current system

Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)