Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (EOE Set 5 and UCONN Set 2)

Files3

Search terms highlighted
Eversource rate increase is on 11 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
9 pages match
  1. Page 145 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-255 Page 1 of 2 Date Filed: September 30, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE; WIRE GUARDS) Refer to Exhibit ACCT-2 CLP-1, and Confidential Exhibit ACCT-2 CLP-1A-20, pp. 112-118. The Company reported an incremental charge of $58,604 for the Vision Utilities Inc vendor for Wire Guards. Respond to the following: a. Please provide a description of the work performed including any remediation, date, and location of the work performed by the wire guards during Storm Event MS24A. Include in the response all documentation supporting the work performed. b. Confirm that the wire guards were not utilized for remediation services (i.e., guarding downed wires). If not confirmed, cite the supporting documents demonstrating the actual services that were rendered. c. Provide an unlocked Excel spreadsheet that summarizes the total number of wires down guards, the total distance between the mobilization/demobilization location, the hours billed for mobilization, the hours billed for demobilization, the hours billed for standby, the costs applicable to mobilization, the costs applicable to demobilization, and the costs applicable to standby. If response to subsection (a) identifies actual remediation, please also include the details attributed to work. d. Provide documentation to support the specific efforts performed by the Company to obtain local (in-state) wire down guard crews in lieu of the out-of-state crews employed by Vision Utilities Inc. e. Please provide the contract and the specific pricing schedule applicable to the MS24A event for the wire guard services. To the extent that the contract includes the standard Exhibit A Pricing Schedule (i.e., the MSA template that contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” as referenced in OCC044, Att. 2 Confidential, p. 6883), please also identify the total amount of equipment that was billed during standby. Response: a. & b. Wire Guards procured from Vision Utilities Inc. (“Vision Utilities”) were retained solely to perform wire guard functions, as needed. Ultimately, the storm did not materialize as forecasted and Vision Utilities resources were not deployed to the field. Accordingly, no wire guard services were performed in the field during Storm Event MS24A.
  2. Page 146 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-255 Page 2 of 2 c. Please refer to EOE-255, Attachment 1, containing an unlocked Excel spreadsheet providing the requested summary details. Please note that this contingent of wire guards mobilized from New Jersey and traveled to Groton, Connecticut, approximately 246 miles each way from their point of origin. d. Eversource seeks to secure the most commercially competitive suppliers with the closest available qualified wire down guard resources to support storm response activities. The resource acquisition process begins with outreach to available local and regional resources and expands geographically as necessary to satisfy forecasted staffing requirements, with priority given to qualified suppliers under existing agreements. Resource availability is often impacted by the geographic scope of the weather event and competing demand across affected utilities. Accordingly, Eversource attempts to utilize local resources where available and supplements those resources with regional crews when local availability is insufficient to meet operational needs. For MS24A, the Company contacted available resources within the region and expanded its requests as necessary to obtain the required staffing levels. Due to storm-related demand and resource availability constraints, resources from outside Connecticut were utilized to supplement locally available wire down guard personnel. e. These charges were supported by a standalone purchase order issued as an exception during Storm Event MS24A to address an emergent operational requirement. Therefore, no Master Agreement or Exhibit A was applicable. Please refer to EOE-255, Attachment 2, which includes the Purchase Order and associated Rate Sheet. Together, these documents constitute the applicable agreement, pricing, and terms for the services provided. Pricing was secured prior to issuance of the Purchase Order and included labor service rates only. No material rates were included, and no material charges were supported by the invoice in question. The applicable rates were based on hours incurred in accordance with the agreed-upon pricing schedule. Straight Time rates applied for the first 40 hours worked within a week, and Overtime rates applied when an individual exceeded the contractual overtime thresholds. Accordingly, labor charges were determined based on total hours incurred rather than whether personnel were actively deployed or awaiting potential assignment.
  3. Page 147 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-256 Page 1 of 3 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-20, pp. 119-138. The Company reported an incremental charge of $313,757 for the Vision Utilities Inc vendor. Respond to the following: a. Referring to pp. 121 and 125, explain the specific work that was performed in support of the storm event. As part of the response, please clarify if the crews’ activity was limited to standby or if they failed to fully complete the timesheets as outlined within the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att. 5. b. Explain why the invoice (i.e., p. 119) includes two categories of standby billing when the vendor’s pricing schedule (i.e., OCC-044, Att. 2 Confidential, p. 6886) identifies only a single classification of standby at a lower rate than billed. As part of the response, please identify the cumulative impact of permitting the vendor to bill at the higher standby rate versus the lower standby rate included within the pricing schedule. To the extent that certain hours were billed at the correct rates and others were billed at the incorrect rates, please provide an unlocked Excel spreadsheet demonstrating the calculation and cite the relevant documents. c. Referring to OCC-044, Att.2 (Confidential), p. 6876-6924, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 6883). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that excludes the standard provisions. d. If subsection (c) is confirmed, identify the total impact of equipment charges that were billed during standby activities. Response: a. Vision Utilities Inc. performed storm work during MS24A, as confirmed by the multiple OMS tickets assigned to this contractor during their shift on January 10, 2024 (see table below). The notes from these numerous events include extensive tree clearing, re-hanging a considerable amount of wire, and replacing transformers. Once a contractor begins a shift, the applicable working rate remains in effect for the duration of that shift.
  4. Page 148 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-256 Page 2 of 3 b. Contractors submit timesheets documenting a general description of the work activities performed during each shift. If a contractor indicates “standby” as their activity, this does
  5. Page 149 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-256 Page 3 of 3 not necessarily mean that the contractor is being compensated at the standby rate. A contractor may use the term “standby” on their timesheet to indicate that they were awaiting dispatch or a new assignment during their shift. However, once the contractor’ shift has commenced, the applicable working rate remains in effect for the full duration of the shift. c. This is confirmed. The vendor’s Exhibit A Pricing Schedule, contains the Company’s standard provision stating that “Standby Rates apply to labor resources only.” The Company reiterates that the term “standby” may also appear on a contractor’s timesheet as a description of the activity or status of a resource during a particular period. For example, a contractor may use “standby” to describe time between assigned tickets, time prior to receiving a ticket, or time following completion of a ticket while awaiting further direction from the Company. The use of the term “standby” on a timesheet does not, by itself, indicate that the contractor is entitled to bill that time at the contractual standby rate. In many such circumstances, the contractor’s resources have already mobilized to an assigned on-set or staging location, are fully prepared and available to perform work, and are awaiting further direction or assignment from Eversource. Such time may therefore be compensable at the applicable working rate depending on the circumstances, notwithstanding the contractor’s use of “standby” as a descriptive notation on its timesheet. d. Equipment was charged in the total amount of $8,352.
  6. Page 150 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-257 Page 1 of 1 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-GENERAL) Refer to Exhibit ACCT-2 CLP-1, and Confidential Exhibit ACCT-2 CLP-1A-20, pp. 139-140. The Company reported two incremental charges for a total of $5,419 for the WB Mason CO Inc vendor. The two invoices both characterized the purchases solely as “Water, Blizzard, 1/2 L, 24/CT”. Please explain what was specifically included with these purchases (i.e., details and quantity) and identify if the purchases were fully utilized during the MS24A event. Response: Please refer to Exhibit ACCT-2 CLP-1 , Outside Contractors-Vendors, Line 543 and 544, vendor WB Mason CO Inc, total amount of $5,419. These invoices represent charges for bottled water, as identified on the supporting invoices. The water was purchased and distributed to personnel at various work centers and staging areas throughout the state to ensure employees and contractors responding to the storm event had access to hydration resources while performing restoration and emergency response activities. The provision of water is a necessary component of supporting field operations during storm restoration efforts, as personnel often work extended hours under challenging conditions and may be deployed to locations where normal facilities and resources are limited or unavailable.
  7. Page 151 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-258 Page 1 of 3 Date Filed: September 28, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-LABOR) Refer to Exhibit ACCT-2 CLP-1, Labor by Empl. Title tab. Respond to the following: a. Please provide all Company policies, procedures, and manuals regarding the qualitative and quantitative data imputed into the above referenced tab. b. Explain what “Premium and Special” charges within column I represents. As part of the response, explain why most of these charges do not have a corresponding numeric value represented in column M. Additionally, where relevant, identify what the numeric values in column M represents. c. Explain how to interpret the information associated with “Meals” referenced in column I, to include an understanding of the numeric values within column M. For example, do the numeric values in column M represent “Hours” as the title suggests or are these numeric values representative of the number of meals that the employees have identified as being entitled? Additionally, why do certain rows with corresponding Meal costs (i.e., column L) fail to identify a numeric value in column M? d. Explain how the Company validated the accuracy of the reported overtime as being applicable to the MS24A event for the weeks ending January 20, 2024, February 3, 2024, February 10, 2024, and February 17, 2024, when the Company reported several other storm events in the intervening period (see Ex. ACCT-1 (Summary), and EOE-013, Att.1). Response: Please refer to Exhibit ACCT-2 CLP-1, Labor by Empl. Title tab. a. Incremental labor costs and hours reflected in Exhibit ACCT-2 CLP-1, Labor by Employee Title Tab, are extracted directly from the Company's PowerPlan system. PowerPlan interfaces with the Company's Workforce Management System and receives employee time-charging data through an established system-to-system integration. As a result, the labor hours and associated costs presented in the exhibit are derived from the Company's official books and records and are based on employee time charges recorded in the Workforce Management System and subsequently transferred to PowerPlan.
  8. Page 152 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-258 Page 2 of 3 The Company relies on these integrated systems to capture, record, and report labor hours incurred during storm response and restoration activities. Accordingly, the incremental labor costs included in the exhibit reflect actual employee time charged to the applicable storm event and recorded through the Company's standard timekeeping and accounting processes. For additional information regarding the Company's accounting systems, data flow, and controls, please refer to the Company's response to Docket 25-12-13, EOE-002. A visual representation of the interface and data flow between the Company's accounting and workforce systems is provided in Docket 25-12-13, EOE-004, Attachment 1. These materials further describe the processes by which employee labor hours are recorded, transferred, and ultimately reflected in the Company's storm cost reporting. b. Certain pay codes within the Company's payroll and workforce management systems are designated as "Premium" pay codes and represent premium compensation associated with hours otherwise worked and recorded by employees. To avoid overstating actual labor hours, the Company excludes hours associated with these premium pay codes from its labor-hour reporting. However, the corresponding premium compensation remains included in the reported storm costs to ensure that all incremental labor expenses incurred because of storm response and restoration activities are accurately captured. This reporting methodology is intended to reflect the actual hours worked without duplication while preserving the full incremental labor costs incurred by the Company. Stated differently, where premium compensation is paid in connection with hours already reflected elsewhere in the Company's timekeeping records, the premium dollars are included in storm costs, but the associated premium hours are not separately reported. This prevents the inflation of labor-hour totals while ensuring that eligible storm-related compensation is fully accounted for in the Company's cost recovery filing. Accordingly, the Company's labor reporting reflects actual hours worked, and its cost reporting reflects the full amount of incremental labor expenses incurred. The exclusion of premium hours from labor-hour reporting is a reporting convention designed solely to prevent double counting and does not result in the exclusion of any associated incremental labor costs. For examples of the pay codes classified as "Premium" and their treatment within the Company's reporting methodology, please refer to Docket 25-12-13, EOE-504, Attachment 1, which identifies the applicable pay codes and illustrates how the associated costs and hours are reflected in the Company's storm cost reporting.
  9. Page 153 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-258 Page 3 of 3 c. For the meals referenced in Column I, the values reflected in Column M represent meal quantities and not labor hours. Accordingly, those entries should be interpreted as the number of meals provided rather than the amount of time worked by employees. In instances where a meal entry does not include a quantity but instead reflects a dollar amount, the expense was manually entered by the employee in accordance with the Company's established expense reporting procedures. Such entries are subject to supervisory review and approval prior to processing and reimbursement. As a result, all manually entered meal expenses included in the Company's records have been reviewed and approved by the employee's supervisor as appropriate business expenses incurred in connection with storm response and restoration activities. Therefore, Column M should not be interpreted as labor hours for meal-related entries. Rather, the column reflects meal quantities where applicable, while manually entered meal expenses are recorded as dollar amounts and are supported through the Company's standard approval and oversight processes. d. All employee time, including both straight-time and overtime hours, is recorded in the Company's Workforce Management System through the employee timesheet process. Employees are required to account for and record all hours worked on a daily basis, including time associated with storm response and restoration activities. Once submitted, employee timesheets are reviewed and approved by the employee's supervisor in accordance with the Company's established timekeeping and payroll control procedures. The Workforce Management System serves as the official system of record for employee labor reporting and is designed to ensure that all hours worked are accurately captured, coded, and approved prior to being processed for payroll and cost accounting purposes. Supervisory review and approval provide an additional level of oversight to verify the accuracy and appropriateness of time charged, including charges associated with specific storm events. Accordingly, the labor hours included in the Company's storm cost reporting are derived from employee timesheets that have been recorded in Workforce and approved through the Company's standard review process. This process helps ensure that both straight-time and overtime hours are accurately documented, appropriately authorized, and supported by the Company's books and records.
  10. Page 154 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-259 Page 1 of 2 Date Filed: September 29, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-LABOR/MEALS) Refer to Exhibit ACCT-2 CLP-1, Labor by Empl. Title tab. Provide documentation to support the validity of the following sampled Meal reimbursements (stipends). As part of the response, please provide relevant calculations, union agreement citations, invoices, or other supporting documents and whether the employee received a Company provided meal or not. a. Row 1514, Response Specialist-Line, $240 b. Row 1886, Stockhandler, $160 c. Row 2449, Splicer/Cable Spicer Helper, $70 d. Row 3736, Line Helper, $150 e. Row 3992, Employee # 025923, Distribution Automation Specialist, $20 Response: Referring to Exhibit ACCT-2 CLP-1, Labor by Empl. Title tab. • Please refer to EOE-259, Attachment 1 CONFIDENTIAL, regarding summary and location of supporting calculations of meals reimbursed. • Please refer to EOE-259, Attachment 2 CONFIDENTIAL, regarding meal reimbursement calculations. • Please refer to EOE-259, Attachment 3 CONFIDENTIAL, regarding Union Contract. Please refer to EOE-259, Attachment 3 CONFIDENTIAL, page 50, Section 15, which details the meal allowance provisions applicable to union employees working extended hours. Pursuant to the applicable collective bargaining agreement, employees are entitled to reimbursement for meals when qualifying conditions are met during extended work assignments. Employees are responsible for submitting reimbursement requests for meals that they were unable to obtain during their scheduled meal periods while performing storm restoration and emergency response work.
2 pages match

As listed on the current system

Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)

This filing on the current system (opens in a new tab)