Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (EOE Set 5 and UCONN Set 2)

Files3

Search terms highlighted
Eversource rate increase is on 11 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
9 pages match
  1. Page 149 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-256 Page 3 of 3 not necessarily mean that the contractor is being compensated at the standby rate. A contractor may use the term “standby” on their timesheet to indicate that they were awaiting dispatch or a new assignment during their shift. However, once the contractor’ shift has commenced, the applicable working rate remains in effect for the full duration of the shift. c. This is confirmed. The vendor’s Exhibit A Pricing Schedule, contains the Company’s standard provision stating that “Standby Rates apply to labor resources only.” The Company reiterates that the term “standby” may also appear on a contractor’s timesheet as a description of the activity or status of a resource during a particular period. For example, a contractor may use “standby” to describe time between assigned tickets, time prior to receiving a ticket, or time following completion of a ticket while awaiting further direction from the Company. The use of the term “standby” on a timesheet does not, by itself, indicate that the contractor is entitled to bill that time at the contractual standby rate. In many such circumstances, the contractor’s resources have already mobilized to an assigned on-set or staging location, are fully prepared and available to perform work, and are awaiting further direction or assignment from Eversource. Such time may therefore be compensable at the applicable working rate depending on the circumstances, notwithstanding the contractor’s use of “standby” as a descriptive notation on its timesheet. d. Equipment was charged in the total amount of $8,352.
  2. Page 150 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-257 Page 1 of 1 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-GENERAL) Refer to Exhibit ACCT-2 CLP-1, and Confidential Exhibit ACCT-2 CLP-1A-20, pp. 139-140. The Company reported two incremental charges for a total of $5,419 for the WB Mason CO Inc vendor. The two invoices both characterized the purchases solely as “Water, Blizzard, 1/2 L, 24/CT”. Please explain what was specifically included with these purchases (i.e., details and quantity) and identify if the purchases were fully utilized during the MS24A event. Response: Please refer to Exhibit ACCT-2 CLP-1 , Outside Contractors-Vendors, Line 543 and 544, vendor WB Mason CO Inc, total amount of $5,419. These invoices represent charges for bottled water, as identified on the supporting invoices. The water was purchased and distributed to personnel at various work centers and staging areas throughout the state to ensure employees and contractors responding to the storm event had access to hydration resources while performing restoration and emergency response activities. The provision of water is a necessary component of supporting field operations during storm restoration efforts, as personnel often work extended hours under challenging conditions and may be deployed to locations where normal facilities and resources are limited or unavailable.
  3. Page 151 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-258 Page 1 of 3 Date Filed: September 28, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-LABOR) Refer to Exhibit ACCT-2 CLP-1, Labor by Empl. Title tab. Respond to the following: a. Please provide all Company policies, procedures, and manuals regarding the qualitative and quantitative data imputed into the above referenced tab. b. Explain what “Premium and Special” charges within column I represents. As part of the response, explain why most of these charges do not have a corresponding numeric value represented in column M. Additionally, where relevant, identify what the numeric values in column M represents. c. Explain how to interpret the information associated with “Meals” referenced in column I, to include an understanding of the numeric values within column M. For example, do the numeric values in column M represent “Hours” as the title suggests or are these numeric values representative of the number of meals that the employees have identified as being entitled? Additionally, why do certain rows with corresponding Meal costs (i.e., column L) fail to identify a numeric value in column M? d. Explain how the Company validated the accuracy of the reported overtime as being applicable to the MS24A event for the weeks ending January 20, 2024, February 3, 2024, February 10, 2024, and February 17, 2024, when the Company reported several other storm events in the intervening period (see Ex. ACCT-1 (Summary), and EOE-013, Att.1). Response: Please refer to Exhibit ACCT-2 CLP-1, Labor by Empl. Title tab. a. Incremental labor costs and hours reflected in Exhibit ACCT-2 CLP-1, Labor by Employee Title Tab, are extracted directly from the Company's PowerPlan system. PowerPlan interfaces with the Company's Workforce Management System and receives employee time-charging data through an established system-to-system integration. As a result, the labor hours and associated costs presented in the exhibit are derived from the Company's official books and records and are based on employee time charges recorded in the Workforce Management System and subsequently transferred to PowerPlan.
  4. Page 152 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-258 Page 2 of 3 The Company relies on these integrated systems to capture, record, and report labor hours incurred during storm response and restoration activities. Accordingly, the incremental labor costs included in the exhibit reflect actual employee time charged to the applicable storm event and recorded through the Company's standard timekeeping and accounting processes. For additional information regarding the Company's accounting systems, data flow, and controls, please refer to the Company's response to Docket 25-12-13, EOE-002. A visual representation of the interface and data flow between the Company's accounting and workforce systems is provided in Docket 25-12-13, EOE-004, Attachment 1. These materials further describe the processes by which employee labor hours are recorded, transferred, and ultimately reflected in the Company's storm cost reporting. b. Certain pay codes within the Company's payroll and workforce management systems are designated as "Premium" pay codes and represent premium compensation associated with hours otherwise worked and recorded by employees. To avoid overstating actual labor hours, the Company excludes hours associated with these premium pay codes from its labor-hour reporting. However, the corresponding premium compensation remains included in the reported storm costs to ensure that all incremental labor expenses incurred because of storm response and restoration activities are accurately captured. This reporting methodology is intended to reflect the actual hours worked without duplication while preserving the full incremental labor costs incurred by the Company. Stated differently, where premium compensation is paid in connection with hours already reflected elsewhere in the Company's timekeeping records, the premium dollars are included in storm costs, but the associated premium hours are not separately reported. This prevents the inflation of labor-hour totals while ensuring that eligible storm-related compensation is fully accounted for in the Company's cost recovery filing. Accordingly, the Company's labor reporting reflects actual hours worked, and its cost reporting reflects the full amount of incremental labor expenses incurred. The exclusion of premium hours from labor-hour reporting is a reporting convention designed solely to prevent double counting and does not result in the exclusion of any associated incremental labor costs. For examples of the pay codes classified as "Premium" and their treatment within the Company's reporting methodology, please refer to Docket 25-12-13, EOE-504, Attachment 1, which identifies the applicable pay codes and illustrates how the associated costs and hours are reflected in the Company's storm cost reporting.
  5. Page 153 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-258 Page 3 of 3 c. For the meals referenced in Column I, the values reflected in Column M represent meal quantities and not labor hours. Accordingly, those entries should be interpreted as the number of meals provided rather than the amount of time worked by employees. In instances where a meal entry does not include a quantity but instead reflects a dollar amount, the expense was manually entered by the employee in accordance with the Company's established expense reporting procedures. Such entries are subject to supervisory review and approval prior to processing and reimbursement. As a result, all manually entered meal expenses included in the Company's records have been reviewed and approved by the employee's supervisor as appropriate business expenses incurred in connection with storm response and restoration activities. Therefore, Column M should not be interpreted as labor hours for meal-related entries. Rather, the column reflects meal quantities where applicable, while manually entered meal expenses are recorded as dollar amounts and are supported through the Company's standard approval and oversight processes. d. All employee time, including both straight-time and overtime hours, is recorded in the Company's Workforce Management System through the employee timesheet process. Employees are required to account for and record all hours worked on a daily basis, including time associated with storm response and restoration activities. Once submitted, employee timesheets are reviewed and approved by the employee's supervisor in accordance with the Company's established timekeeping and payroll control procedures. The Workforce Management System serves as the official system of record for employee labor reporting and is designed to ensure that all hours worked are accurately captured, coded, and approved prior to being processed for payroll and cost accounting purposes. Supervisory review and approval provide an additional level of oversight to verify the accuracy and appropriateness of time charged, including charges associated with specific storm events. Accordingly, the labor hours included in the Company's storm cost reporting are derived from employee timesheets that have been recorded in Workforce and approved through the Company's standard review process. This process helps ensure that both straight-time and overtime hours are accurately documented, appropriately authorized, and supported by the Company's books and records.
  6. Page 154 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-259 Page 1 of 2 Date Filed: September 29, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-LABOR/MEALS) Refer to Exhibit ACCT-2 CLP-1, Labor by Empl. Title tab. Provide documentation to support the validity of the following sampled Meal reimbursements (stipends). As part of the response, please provide relevant calculations, union agreement citations, invoices, or other supporting documents and whether the employee received a Company provided meal or not. a. Row 1514, Response Specialist-Line, $240 b. Row 1886, Stockhandler, $160 c. Row 2449, Splicer/Cable Spicer Helper, $70 d. Row 3736, Line Helper, $150 e. Row 3992, Employee # 025923, Distribution Automation Specialist, $20 Response: Referring to Exhibit ACCT-2 CLP-1, Labor by Empl. Title tab. • Please refer to EOE-259, Attachment 1 CONFIDENTIAL, regarding summary and location of supporting calculations of meals reimbursed. • Please refer to EOE-259, Attachment 2 CONFIDENTIAL, regarding meal reimbursement calculations. • Please refer to EOE-259, Attachment 3 CONFIDENTIAL, regarding Union Contract. Please refer to EOE-259, Attachment 3 CONFIDENTIAL, page 50, Section 15, which details the meal allowance provisions applicable to union employees working extended hours. Pursuant to the applicable collective bargaining agreement, employees are entitled to reimbursement for meals when qualifying conditions are met during extended work assignments. Employees are responsible for submitting reimbursement requests for meals that they were unable to obtain during their scheduled meal periods while performing storm restoration and emergency response work.
  7. Page 155 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-259 Page 2 of 2 During storm events, it is common for employees to continue working through their designated meal periods in order to address emergent system conditions and expedite the restoration of service to customers. As a result, employees may incur meal expenses that would not otherwise have been incurred during their normal work schedule. Meal reimbursement requests are submitted by employees in accordance with Company procedures and are reviewed and approved through the Company’s timesheet approval process. Supervisors are responsible for reviewing employee timesheets, including any associated meal reimbursement requests, to verify compliance with applicable Company policies and collective bargaining agreement provisions before approval. Accordingly, the meal expenses reflected in this exhibit represent costs incurred as a direct result of employees working extended hours in support of the Company’s storm response and restoration efforts and are consistent with the provisions of the applicable collective bargaining agreement. Lastly, upon further review in drafting this response, the Company determined that partial cost associated with line 3736 is not associated with the event. The Company will supplement Exhibit ACCT-2 CLP-1 (MS24A) to reflect $110.
  8. Page 156 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-260 Page 1 of 1 Date Filed: September 29, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-P-CARDS) Refer to Exhibit ACCT-2 CLP-1, P-Card tab. Provide documentation to support the validity of the following sampled P-Card expenses. As part of the response, please provide a description of the purchase, relevant invoices, applicable calculations, and other supporting documents demonstrating the necessity and applicability of each charge to the MS24A event. a. Row 23, BJs Wholesale #0315, Meals, $338 b. Rows 39-40, Dave & Charlies Home, Meals, $7,460 c. Rows 46-48, Hampden Zimmerman, General Supplies, $570 d. Rows 113-117, Newtown Deli LLC, Meals, $40,813 e. Row 163, Walmart.com, General Supplies, $581 Response: Referring to ACCT-2 CLP-1 (MS24A), P-Card tab. a. The Company will supplement receipt for the BJs Wholesale charge in the amount of $338. b. Please refer to EOE-260, Attachment 1, and EOE-260, Attachment 2, for the receipt in support of the $7,460 in meals for storm crews. c. Please refer to EOE-260, Attachment 8, and EOE-260, Attachment 9, for receipts in support of the $810 emergency generator electrical cord parts. In reference to line 46 in the amount of $240, this is a credit adjustment from the vendor due to an error within their invoice. d. Please refer to EOE-260, Attachment 3, EOE-260, Attachment 4, EOE-260, Attachment 5, EOE-260, Attachment 6, and EOE-260, Attachment 7, for receipts in support of the $40,813 charges related to Exhibit ACC-2 (CLP-1)(MS24A), lines 112 – 117 in meals for storm crews. e. The Company will supplement receipt for Walmart charge in the amount of $581.
  9. Page 157 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-261 Page 1 of 1 Date Filed: September 29, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-EMPLOYEE EXPENSE REIMB) Refer to Exhibit ACCT-2 CLP-1, Empl. Expense&Other tab. Provide documentation to support the validity of the following sampled employee expenses. As part of the response, please provide a description of the purchase, relevant invoices, applicable calculations, and other supporting documents demonstrating the necessity and applicability of each cost to the MS24A event. a. Row 30, Meals, $71 b. Row 65, Travel, $216 c. Row 119, Meals, $103 d. Row 151, Meals, $20 e. Row 166, Reimbursement, $617 f. Row 182, Reimbursement, $859 g. Row 221, Meals, $665 h. Row 236, Reimbursement, $1,163 i. Row 333, Meals, $25 j. Row 351, Reimbursement, $181 Response: Referring to Exhibit ACCT-2 CLP-1, Empl. Expense&Other tab. Please refer to EOE-261, Attachment 1 CONFIDENTIAL, for a summary of purchases and descriptions of transactions. In addition, please refer to EOE-261, Attachment 2 CONFIDENTIAL, for all receipts directly associated with this event. In preparing this response, the Company determined that the costs listed below are not associated with the event: • Line 119 in the amount of $103. • Line 166 in the amount of $617. • Line 221 in the amount of $549.18. • Line 236 in the amount of $1,163. • Line 351 in the amount of $148.58. The Company will supplement Exhibit ACCT-2 CLP-1 to make these adjustments.
  10. Page 158 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-262 Page 1 of 2 Date Filed: September 29, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-EMPLOYEE EXPENSE MILEAGE) Refer to Exhibit ACCT-2 CLP-1, Empl. Expense&Other tab. Provide documentation to support the validity of the following sampled mileage expenses. As part of the response, please provide the mileage logs and other supporting documents that were available to the Eversource reviewer at the time of approval demonstrating the applicability of each cost to the MS24A event, as well as the netting of the employee’s normal commute. a. Row 35, $163 b. Row 84, $156 c. Row 111, $126 d. Row 143, $ 126 e. Row 200, $126 f. Row 230, $116 g. Row 265, $110 h. Row 271, $76 i. Row 299, $63 j. Row 330, $115 k. Row 346, $110 l. Row 347, $67 m. Row 365, $55 n. Row 373, $67 Response: Please refer to Exhibit ACCT-2 CLP-1 (MS24A), Empl. Expense& Other, please refer to the following for the requested information: • Please refer to EOE-262, Attachment 1, for a summary and location for the documentation supporting each cost. • Please refer to EOE-262, Attachment 2, for the mileage log with calculation per mile at $0.67. In addition, expense plans that are calculated by Union agreement.
2 pages match

As listed on the current system

Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)

This filing on the current system (opens in a new tab)