  1. Page 15 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-179 Page 1 of 2 Date Filed: September 28, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Education, Outreach, and Enforcement Question: (STORM – DRONE USAGE) Refer to Response to EOE-033. Respond to the following: a. Explain why the Company incurred more than a 5x increase in drone expenses for the test year (i.e., 2025) compared to all prior years. b. Discuss if the increased drone expenses have resulted in a decrease in c. staffing levels within the Company’s Event Level Matrix (ELM). c. Provide evidence of the Company’s competitive bid results for the drone services provided by the Creative Surveying vendor. If the vendor did not provide the most favorable competitive bid results, explain why the vendor incurred over 90% of the drone costs for the test year. Additionally, identify the incremental difference in drone spending for the Creative Surveying vendor compared to the lowest cost option resulting from the competitive bid process. Response: Please refer to EOE-033-SP01 i. Regarding part c, the original response to EOE-033 incorrectly showed that Creative Surveying provided drone services in the test year. Prior Referenced Response: i EOE-033-SP01 Question: (STORM – DRONE USAGE) Discuss the Company’s use of drones in support of storm remediation efforts. As part of the response, identify when the Company first started using drones, explain the nature of these services as performed by either internal or external parties, and explain how these costs have impacted (i.e., reduced) other offsetting costs (i.e., patrols). Finally, provide a detailed listing of drone expenses by year (2018 through present), identify any dronerelated capital additions (i.e., drone purchases), and identify where in the Company’s application those costs are included. EOE-033-SP01 Response: Original submission included chart with inaccurate costs. Please reference this chart along with verbiage below.
  2. Page 16 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-179 Page 2 of 2 Original Response: Eversource has utilized drones for storm restoration support of electric distribution assets since 2019 when the Company hired drone contractors. In 2020, the Company created our internal drone team and since then, the Company has utilized both contracted and internal resources for storm support. The Company’s drone teams aid in storm restoration efficiency by quickly delivering detailed images of aerial assets to a decision maker and identifying potential issues not typically seen from the ground, or in areas that cannot be traversed due to environmental factors. This in turn reduces costs by increasing reliability and reducing outages for our customers. Refer to the charts below for a listing of expenses and capital additions by year. The expenses in the test year were recorded to storm workorders and are therefore either deferred for future recovery ($293,774) or included in Exhibit CLP-REVEQ-2-A,B,C,D, Schedule C-3.28 (Storms: Non-Catastrophic / Pre-Staging Incremental Storm Expenses) ($153,000). The assets are purchased by the Service Company and those capital costs are billed to the Company as operating expenses though (1) EESCO Capital Return (Exhibit CLP-REVREQ-2-A,B,C,D, Schedule C-3.11) and (2) EESCO Depreciation expense (Exhibit CLP-REVREQ-2-A,B,C,D, Schedule C-3.35).
  3. Page 17 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-180 Page 1 of 4 Date Filed: September 25, 2026 Witness: Douglas P. Horton Request from: Office of Education, Outreach, and Enforcement Question: (STORM CARRYING COSTS) Refer to Exhibit CLP-ELP-1, pp. 122, 139- 140, Exhibit ACCT1 (Summary), and Response to OCC-143. The Company’s recovery request includes “carrying charges at the Company’s WACC from the date of cost incurrence” and includes storm events through 1Q2025, excluding events from 2Q25 through 4Q25. The Company identified that its “plan is to file the actual storm costs incurred from April 2025 through December 2026 with all supporting documentation on September 1, 2027.” Discuss if the Company intends to request “historical” carrying charges (i.e., from the date of cost incurrence) on the omitted 2Q25-4Q25 events in the subsequent proceeding. If intended to request historical carrying charges in the subsequent proceeding, explain how the omission of 2Q25-4Q25 events from the current rate case application serves to minimize (i.e., contain) costs imposed on ratepayers. Response: Please refer to the Company’s response to EOE-132, i explaining the reason that the Company’s initial filing in this docket did not include 2Q-4Q 2025 catastrophic storm events. The storm costs that the Company did not file will be timely addressed by the Company’s ratemaking proposal for storm costs in this proceeding. The Company’s application includes carrying charges at the Company’s weighted average cost of capital from the date of cost incurrence consistent with the Company’s legal position that carrying costs arise at the time that costs are deferred. However, the Company recognized in its response to OCC-522 ii that: The appropriate treatment of carrying charges may vary based on the regulatory framework established within each jurisdiction. Different regulatory constructs reflect differing policy objectives and mechanisms designed to balance the Company’s financing needs with customer impacts. In establishing a going-forward framework for storm cost recovery, the Company agrees that it would be within PURA’s discretion to strike a balance between the Company’s costs of financing storm costs while ensuring that the Company is not ‘profiting’ on a force majeure event like a storm. At bottom, the Company is seeking a reasonable rate treatment for storm costs that allows for systematic review and recovery outside of the rate-case cycle. This treatment would benefit customers, the Company, PURA and other stakeholders because it would maintain rate stability
  4. Page 18 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-180 Page 2 of 4 for customers, enable efficient and effective review by PURA, and allow the Company timely and adequate recovery, while minimizing carrying costs to the benefit of customers. Both Massachusetts and New Hampshire employ mechanisms that achieve these goals and those mechanisms are working effectively toward those goals. The Company’s testimony in Exhibit CLP-ELP-1, page 143, explains that “should PURA implement the SCRAF, which provides for more timely review and recovery of storm and prestaging costs, the Company accepts the Prime rate from the date of cost incurrence, applied to the net balance of the storm fund and pre-staging reserve fund for storms occurring after March, 2025.” This approach is akin to the balancing of interests implemented in both Massachusetts and New Hampshire. In addition, under this approach, carrying charges are applied symmetrically in that if the net balance of the storm fund and pre-staging reserve fund for storms reflects an over recovered position, the Company would pay carrying costs on the net over-recovered balance in the same way that it would collect carrying costs on the net under-recovered balance. Accordingly, if there is a concern about the accumulation of carrying costs, it is solved by implementing a reasonable, fair and effective ratemaking treatment starting July 1, 2027, which will encompass the outstanding storm costs. Prior Referenced Responses: i EOE-132 Question: (CATASTROPHIC STORM CUTOFF) Explain why the Company decided to omit 2Q-4Q 2025 catastrophic storm events from the rate case submission. EOE-132 Response: Please refer to the testimony of the Storms Panel filed as Exhibit CLP-STORM-1, beginning at page 94, which discusses the Company’s detailed storm invoicing quality control audit process. It can take weeks or months for the Company to receive invoices after a catastrophic storm or pre-staging event. Once an invoice is received, the Company performs its multi-step review process, which also takes weeks or months depending on each invoice’s size and complexity. Because of the delay in receiving, reviewing and approving invoices, it was not feasible to include storms occurring after March 2025 within the Company’s initial rate amendment Application. With regard to costs associated with storm events occurring after March 2025, the Company’s plan is to file the storm costs incurred from April 2025 through December 2026 with all supporting documentation on September 1, 2027. Please refer to the Company’s response to OCC-143i, as well as the testimony of the Eversource Leadership Panel in Exhibit CLP-ELP-1, beginning on page 121, for the Company’s proposal to establish a new Storm Cost Recovery Adjustment Factor (“SCRAF”) that would establish a more programmatic and timely process for review of costs associated with catastrophic storms and pre-staging event costs. Thus, with respect to storm costs incurred post-March 2025, the Company’s plan is to file the actual storm costs incurred from April 2025 through December 2026 with all supporting documentation on September 1, 2027. Pursuant
  5. Page 19 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-180 Page 3 of 4 to the Company’s proposal in this case, PURA would then conduct a contested proceeding to evaluate the prudence of the incremental catastrophic storm and pre-staging event costs, the accumulated reserve balances and the potential need for a SCRAF rate change to commence recovery of prudently incurred costs. The Company’s proposal is to implement any rate changes on September 1st of the following year, aligning with the Company’s RAM Phase II rate changes on the same day. This process would continue on an annual cycle, with the Company filing the prior year’s actual storm costs with all supporting documentation on September 1st each year; with a prudence review occurring thereafter; and a potential rate change to incorporate those storm costs into the SCRAF in the following September 1st rate change. This routine cycle would avoid the accumulation of storm costs in a manner that causes rate shock for customers; would mitigate the applicability of carrying costs, lowering costs for customers and would be administratively efficient with smaller increments of storm costs presented for review at any given time. OCC-522 Question: Leadership Panel Exhibit CLP-ELP-1 – Storm Cost Recovery (Carrying charges applied to SCRAF) In its proposal, the Company notes, “should PURA implement the SCRAF, which provides for more timely review and recovery of storm and pre-staging costs, the Company accepts the Prime rate from the date of cost incurrence, applied to the net balance of the storm fund and pre-staging reserve fund 6 for storms occurring after March, 2025.” (p.143) Did the company consider or analyze setting carrying charges on costs recovered through SCRAF to be equal to the commercial paper index or the utility's actual cost of short-term debt, rather than the prime rate? a. If yes, provide the analysis conducted and the rationale for proposing the use of the prime rate instead. b. If not, explain why the Company did not consider proposing that the carrying charges on SCRAF recovery to be set at either the commercial paper index or actual cost of short-term debt. OCC-522 Response: (a) and (b) Carrying costs are the mechanism by which the Company recovers its cost of money. Thus, carrying costs must be tied to the actual cost that the Company is incurring to carry the storm deferral. When the storm deferral is relatively larger and carried for a relatively extended time period, then the Company’s weighted average cost of capital (“WACC”) is its actual carrying cost. If PURA establishes a ratemaking mechanism that provides more systematic reviews and more timely recovery, then the cost of money may be susceptible to approximation with lower cost sources of funds. The relationship between time and quantity and the cost of capital is clearly demonstrated through a utility’s cost of service whereby a utility’s rate base (comprised mainly of the Company’s plant which is paid back by customers over many years) receives a return at the Company’s authorized WACC. Applying the Company’s WACC to long-term assets aligns the carrying charge calculation with the manner in which comparable long-term assets are reflected for ratemaking purposes. Similarly, the WACC is the appropriate rate for calculating carrying charges on long-term funded regulatory assets because it reflects the Company’s actual cost of funding those customer “debts,” including storm restoration costs, over an extended period of time. Financing obligations – certainly obligations of this magnitude - cannot be supported exclusively through debt financing, whether short-term or long-term. Instead, the Company must balance its capital
  6. Page 20 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-180 Page 4 of 4 requirements through a reasonable mix of both debt and equity to ensure financial stability and continued access to reasonably priced capital. With respect to the appropriate carrying charge rate to utilize for the Storm Cost Recovery Adjustment Factor (“SCRAF”), the Company provided a thorough response to this question in response to LFE-031 in Docket No. 2512-13. The Company is providing that response as OCC-522 Attachment 1. The analysis shows that: (1) necessary uses of cash routinely exceed available sources of cash, creating a persistent funding gap; (2) commercial paper is a tool to maintain liquidity, not to finance investments or deferred expenses; and (3) short-term borrowing capacity is limited, and the Company cannot plan to operate at or near its short-term debt capacity without putting its ability to operate the system in severe jeopardy. Given all of the considerations elucidated by Attachment 1, the Company recognizes that the appropriate treatment of carrying charges may vary based on the regulatory framework established within each jurisdiction. Different regulatory constructs reflect differing policy objectives and mechanisms designed to balance the Company’s financing needs with customer impacts. In establishing a going-forward framework for storm cost recovery, the Company agrees that it would be within PURA’s discretion to strike a balance between the Company’s costs of financing storm costs while ensuring that the Company is not ‘profiting’ on a force majeure event like a storm. This is the Company’s experience in Massachusetts, as well, where the MDPU has authorized a carrying charge rate that is different from and generally less than the Company’s WACC, but that still recognizes that the Company is using its longer-term capital resources to finance storm costs (not its shorter term commercial paper source of liquidity). Thus, the Company stated that “should PURA implement the SCRAF, which provides for more timely review and recovery of storm and pre-staging costs, the Company accepts the Prime rate from the date of cost incurrence, applied to the net balance of the storm fund and pre-staging reserve fund for storms occurring after March, 2025.”
  7. Page 21 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-181 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (VEGETATION EQUIPMENT) Refer to Responses to EOE-137 and OCC-101, Att.1 Confidential. The Company’s response to EOE-137 confirmed that the response to EOE-552 within Docket No. 25-12-13 “is accurate and has not resulted in any changes” and referred to OCC101, Att.1 Confidential for standard equipment that is included within existing contracts and rates. It does not appear that OCC-101, Att.1 has specified the standard equipment that is included with crews/vehicles and is otherwise non-billable. Consistent with EOE-552, confirm that “bucket truck crews will have a minimum of two chain saws on the truck included in the cost of the hourly bucket truck rate. For local tree crews working in Connecticut, the requirement is a minimum of two (oneman) gasoline chain saws (one with at least a 14-inch bar length and one with at least a 21-inch bar length).” If not confirmed, provide details on the billing practice changes and timing of the changes. Response: It is confirmed that “bucket truck crews will have a minimum of two chain saws on the truck included in the cost of the hourly bucket truck rate. For local tree crews working in Connecticut, the requirement is a minimum of two (one-man) gasoline chain saws (one with at least a 14-inch bar length and one with at least a 21-inch bar length)” per Section II Special Conditions & Amendments section of the Vegetation Management contracts, Section I, Equipment. Please refer to EOE-181, Attachment 1.
  8. Page 22 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-182 Page 1 of 1 Date Filed: September 28, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (WIRE GUARDS/COMP BID) Provide the competitive bid assessments performed for all vendors performing wire guard services included in the Company’s response to EOE-970 in Docket No. 25-12-13. (i.e. applicable for the years 2024-2025) Please provide any additional competitive bid assessments for all vendors performing wire guard services that have been performed that were not included in the Company’s response to EOE-970 applicable for the years 2024-2025. Response: The Company’s response to EOE-970 in Docket No. 25-12-13 addressed competitive bid information applicable through 2023 and did not include the subsequent procurement applicable to the 2024–2025 period. Please refer to EOE-182, Attachment 1 CONFIDENTIAL, for the competitive bid results associated with the 2024–2026 ERP Wires Down Guard RFP, which includes the competitive bid assessment applicable to vendors performing wire guard services during 2024–2025. The Company has not identified any additional competitive bid assessments applicable to the 2024–2025 period beyond those provided in EOE-182, Attachment 1 CONFIDENTIAL.
  9. Page 23 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-183 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio and Mark P. Baldwin Request from: Office of Education, Outreach, and Enforcement Question: (WIRE DOWN GUARDS) Identify if wire down guards require any unique qualifications, certifications, or experience. To the extent that unique qualifications, certifications, or experience are required, explain how the Company verifies that vendors only provide resources that meet these requirements. Response: Wire Down Guards do not require unique experience but do require training specific to this position that details the role and responsibilities, the hazards and safety policies/practices, and the recommended PPE Personal Protective Equipment. During the bid process, the contractors provide their safety procedures, manuals and training programs for their individual companies. This provides Eversource with details into the contractors training programs for their resources. The contractors are also reviewed by IS NetWorld and must maintain a passing score during the contract life cycle.
  10. Page 24 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-184 Page 1 of 1 Date Filed: September 25, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM INTERNAL CONTROLS) Refer to Response to EOE-009.Discuss the Company’s internal controls applicable to the accuracy of reported storm costs and identify if any of the storm events were subject to different controls. If differences in controls exist, describe the differences, explain why changes occurred, and identify the specific controls applicable to each event. Response: The corrective actions referenced in EOE-009 did not result in changes to the Company’s internal control policies. The storm events included in Docket 26-05-10 were not subject to different controls.