Discovery Compilation (EOE Set 5 and UCONN Set 2)
Files3
Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
EOE Set 5_COMBINED.pdf
PDF · 1.3 MB · 169 pagesText searchable
Download EOE Set 5_COMBINED.pdfRead the text of EOE Set 5_COMBINED.pdf
UCONN Set 2_COMBINED.pdf
PDF · 372 KB · 19 pagesText searchable
Download UCONN Set 2_COMBINED.pdfRead the text of UCONN Set 2_COMBINED.pdf
Page 2 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-171 Page 2 of 4 e. Explain how the Company aligns outages to the different storm events and provide any relevant policies or procedures. As part of the response, using the MS24A event as an example, explain how the Company determined that the various new outages on January 11, 2024, would be aligned to the MS24A event when the Company’s response to EOE-19, Att. 2, identified that demobilization occurred on January 9, 2024. EOE-265 Response: a. Column C (EVENT COUNT) identifies whether a record represents a unique outage event. A value of 1 denotes the initial outage event and is included in the total event count. A value of 0 denotes a subsequent restoration segment, switching operation, or additional restoration activity associated with a previously counted outage event. OMS stores these restoration activities as separate records to document the progression of restoration efforts; however, they are not considered separate outage events. Accordingly, only the initial record for a given outage event is assigned an Event Count of 1, while all subsequent records related to that same outage event are assigned an Event Count of 0. Column D (DEVICENAME) identifies the electric system device associated with the outage or operational event. The field consists of a device-type code followed by a unique identifier used within the Company's OMS system to distinguish individual assets. The device-type code identifies the category of equipment involved in the event, while the remaining portion of the field identifies the specific asset. Common device-type codes reported in the attachment include, but are not limited to: Device Type Description XF_OH Overhead transformer XF_UG Underground transformer XF_NET_POS Network transformer FUSE_OH Overhead fuse FUSE_UG Underground fuse REC_1P Single-phase recloser REC_3P Three-phase recloser SCADA_REC SCADA-controlled recloser SCADA_REC_3P SCADA-monitored three-phase recloser LB_SW_OH Overhead load-break switch LB_DSC_OH Overhead load-break disconnect switch SS_D_CB Distribution substation circuit breaker SS_D_SW Distribution substation switch SS_D_REC Distribution substation recloser SS_D_XF Distribution substation transformer SS_T_CS Transmission/substation circuit switcher SS_T_SW Transmission/substation switch ELB_DB Underground dead break elbow devicePage 3 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-171 Page 3 of 4 b. ELB_LB Underground load break elbow device 1P_TS Single-phase trip saver 2P_TS Two-phase trip saver 3P_TS Three-phase trip saver Column F (EVENT TYPE) identifies the type of OMS event record associated with the incident. “OUT” indicates an outage event that resulted in one or more customer’s being interrupted and requiring restoration. “NON” indicates an event that did not result in a customer outage but still required utility response, investigation, switching, equipment inspection, repair, or other operational actions. These events are recorded in OMS because they represent actual system incidents or operating conditions that required company attention; however, they are not considered customer outage events because no customers lost electric service as a result of the event. c. Column K (ACT-CUST-OUT) represents the number of customers who were actually without electric service for the event record. A value greater than 0 indicates the number of customers who were confirmed to be without power as a result of the event. A value of 0 indicates that no customers were actually without power for that event record. A value of 0 can occur for several reasons. For example, a customer may contact the Company to report a service outage, but subsequent investigation determines that the customer has electric service and no interruption exists. In those cases, an OMS record is still created to document the reported condition and the Company's response; however, because no customer was actually without power, the ACT-CUST-OUT value is 0. Similarly, OMS records may be generated for operational investigations, switching activities, equipment conditions, repairs, or restoration-related actions where customers are not without service. In these situations, the ACT-CUST-OUT value of 0 indicates that there were no customers out of service for that specific record. Additionally, records classified as EVENT TYPE = NON do not represent customer outage events and therefore will have an ACT-CUST-OUT value of 0. While these events may require utility response, investigation, repair, or other operational actions, they do not result in customers losing electric service. Accordingly, ACT-CUST-OUT reflects the number of customers who actually did or did not have power for a given OMS record, rather than the number of outage reports received. d. The Company aligns outages to storm events based on the cause of the outage and its relationship to storm-related damage or conditions, rather than solely on the status of contractor or mutual assistance resources. Outages may continue to be associated with a storm event after external resources have been demobilized if the outage is determined to have resulted from damage or conditions created by that storm. The Company reviews outage information, field observations, damage assessments, cause codes, repair records, and other operational information when determining whether an outage should be attributed to a storm event. This review may identify outages that occur after the peak restoration period but are nevertheless attributable to storm-related damage.Page 4 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-171 Page 4 of 4 With respect to MS24A, the Company's response to EOE-19, Attachment 2, identified January 9, 2024, as the date external storm-response resources were demobilized. The demobilization of contractor, mutual assistance, or other external resources does not necessarily indicate that all storm-related restoration activities were complete. Following demobilization, the Company may continue to perform repair work, corrective maintenance, damage remediation, and storm-related cleanup using internal resources. Accordingly, restoration and repair activity that occurred on January 11, 2024, remained aligned with the MS24A event because they were determined to be associated with damage or conditions resulting from the January 9-10, 2024 storm event. Although those outages may have occurred after external resource demobilization, the Company determined they were storm-related and therefore appropriately remained assigned to the MS24A storm event for reporting purposes. In summary, the date of external resource demobilization is not the sole criterion used to determine whether an outage is attributed to a storm event. Storm attribution is based on the relationship between the outage and the storm-related damage or conditions that caused the outage, regardless of whether restoration and repair activities are being performed by external or internal resources.Page 5 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-172 Page 1 of 2 Date Filed: September 28, 2026 Witness: Christopher E. Colorio and Mark P. Baldwin Request from: Office of Education, Outreach, and Enforcement Question: (STORM REPORTING) Refer to Response to EOE-007. The Company’s response included an attachment that referenced multiple filings within Docket No. 25-12-13 (i.e., EOE-57, EOE-75, and EOE-213). Identify the specific storm events from 2018 through 2023 where the Company did not file or could not locate a post storm event report as being filed with the Authority in accordance with Docket No. 86-11-18. Response: Post-event reports are required in certain circumstances pursuant to Order No. 6 Compliance issued in Docket No. 86-11-18, DPUC Review of Performance of UI, CL&P and SNETCO in Restoring Service After Storm Carl. The expectations have not changed from this decision to the present. Order No. 6 provides: Commencing from the date of the Decision, May 12, 1987, each of the Companies shall file a Report, including time series details of service restoration, to the Public Utilities Regulatory Authority within 14 days of complete restoral of customer service following the implementation at any level of its respective Emergency Plan. Based on the language of Order No. 6, post-event reports are required only for those storm events where the Company “implemented” a level of its ERP. Thus, the Company is not required to file a 14-Day Report if the ERP is “activated” but never “implemented.” This distinction between “activation” and “implementation” is incorporated into CL&P’s ERP. In the sequence of steps taken to prepare for an oncoming storm event, the decision to pre-stage crews is based on several considerations, including the requirement to comply with the minimum staffing requirement of the ERP. The Incident Commander activates the ERP by a “declaration,” which is based on potential storm conditions and impacts to the electric distribution system. The “specific criteria” that must be met for pre-staging are that: • CL&P’s Incident Commander determines that circumstances warrant activation of the ERP; • Pre-staging of resources is appropriate as part of the ERP activation to facilitate the efficient restoration of service to potentially affected customers;Page 6 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-172 Page 2 of 2 • Pre-staging of resources will be required CL&P to incur incremental cost due to the circumstances at hand; and • CL&P provides written notice to PURA informing PURA of: (1) the activation of the ERP; (2) the event classification declared; and (3) the decision to pre-stage resources with the potential to incur incremental cost. Decision, December 17, 2014, Docket No. 14-05-06, Application by The Connecticut Light and Power Company to Amend its Rate Schedules, at 87 (referring to the “specific criteria” delineated in the Testimony of Company Witness Kenneth Bowes at page 50). Pursuant to Section 2.5 of the Company’s ERP, Readiness Conditions, “activation” of the ERP occurs in anticipation of “Emergency Conditions.” Section 2.5.4 establishes that ERP activation occurs when “Emergency event conditions are imminent that will cause or have caused significant impact to the Electric System or one or more Eversource business units.” Under Section 2.6 of the ERP, if an Emergency Event is likely and is expected to cause significant outages or damage to the distribution system, then the Incident Commander declares an ERP Event, indicating a formal initiation of the ERP. This declaration constitutes the “activation” of the ERP Event by the Incident Commander, in advance of the onset of actual weather conditions, and when the emergency is “imminent,” as required by the ERP. However, in some circumstances the actual weather conditions may be less impactful than anticipated (or may fail to materialize at all), in which case it is not, ultimately, necessary to “implement” the ERP expanded organization and, instead, the Company’s electric operations group is able to manage response and restoration activities while standing down the full ERP organization. Mobilizing the full ERP organization creates costs and complications for the workforce both personally and in terms of performing their usual job functions. If costs, inefficiencies and inconveniences can be avoided because the storm is not as impactful as anticipated, then the most appropriate actions is to not undertake the “implementation” of the expanded ERP organization. The Company did not file 14-Day Reports for storms MS18H, MS21M, MN21P, MS22A, MS22C, MS22D, MS22E, MS22F, MS22G, MN23B, MS23C, MN23T, and MN23AB, because an ERP was either not declared or implemented for these events. The Company is not able to locate any record of filing a post-event report for storms MS21A and MS21L.Page 7 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-173 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio and Mark P. Baldwin Request from: Office of Education, Outreach, and Enforcement Question: (EXTERNAL VENDOR STORM BILLING GUIDANCE) Refer to Response to EOE-023. The Company was requested to provide “copies of all policies, procedures, or other guidance, including guidance on billing hours worked (i.e., travel, standby, and work classifications) provided internally and externally with line crew, damage assessor, and vegetation crew vendors”. The Company’s response referenced the contracts but did not include actual guidance to include the ERSG-Contractor Obligations – Instructions provided in response to EOE059 within Docket No. 25-12- 13. Respond to the following: a. Provide the ERSG-Contractor Obligations – Instructions previously provided in Docket No. 25-12-13 at EOE-059, Att.1. Additionally, identify all revisions to the referenced instructions for storm events through 1Q25, if applicable. b. Provide all additional policies, procedures, or other guidance that may have been omitted from EOE-023 and discuss all changes that occurred through 1Q25 storm events. Response: Please refer to EOE-173, Attachment 1, for a copy of the hiring package that is sent to each contractor when hired. Minor modifications to the package have been made over time, however the company has not saved the different revisions.Page 8 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-174 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (MASTER SERVICE AGREEMENT) Refer to Response to EOE-024. Please provide a copy of every template Master Service Agreement (MSA) utilized by the Company since 2018, indicating the period of time each template was utilized. Identify all “template” changes made to the MSA since 2018, along with the respective dates of the changes. Additionally, please confirm that the MSA included standard language that stated “Standby Rates apply to labor resources only” for each storm event included in the Company’s submission. Response: Please refer to EOE-174, Attachment 1 CONFIDENTIAL, and EOE-174, Attachment 2 CONFIDENTIAL, for the changes to the Master Service Agreement Templates. • EOE-174, Attachment 1 CONFIDENTIAL, shows the redlines/revisions made to the MSA template from 2017-2022, effective August 18, 2022. • EOE-174, Attachment 2 CONFIDENTIAL, shows the redlines/revisions made to the MSA template from 2022-2024, effective November 22, 2024. • EOE-174, Attachment 3 CONFIDENTIAL, contains the revisions made to the Exhibit B Pricing Schedules between 2017 and 2022, as well as 2022 and 2024. The contractual time periods covered in response to EOE-024 i, were 2018-2020, 2020-2025, and 2025-Present. These Master Service Agreements do not include the provision stated in the question of “standby rates apply to labor resources only.” This standby language is included in the Line Crew Emergency Response agreements. For example, please refer to OCC-044, Attachment 2, Pg.at page 874, Exhibit A. Prior Referenced Response:Page 9 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-174 Page 2 of 2 i EOE-024 Question: (MASTER SERVICE AGREEMENT) Provide a copy of the Company’s Master Service Agreement (MSA) with each line crew contractor effective from 2018 to present. Further identify all changes made to the MSAs since 2018. EOE-024 Response: Please refer to EOE-024, Attachment 1, for a listing of all line crew contractors with Master Service Agreements associated with charges related to line crews represented in EOE-051, Attachment 1. Copies of vendor Master Service Agreements not already provided in OCC-044 are provided in EOE-024, Attachment 2 CONFIDENTIAL through EOE-024, Attachment 9 CONFIDENTIAL. In some cases, the Master Service Agreements served as the governing contract and were provided as part of OCC044, Attachment 2 CONFIDENTIAL, as those contracts supported storm activities. Those contracts are represented in EOE-024, Attachment 1, and will reference OCC-044, Attachment 2 CONFIDENTIAL. There is no feasible manner for the Company to identify all revisions made to each Master Service Agreement over the extended period and scope requested. Updates have been made to the Master Service Agreement templates that serve as the baseline for the Company’s contracts. Although numerous modifications were made from 2018 to present, the primary changes were to establish separate master agreements for blue sky work versus ERP work and to more clearly define rates for line crews as part of the Company’s continuous improvement efforts.Page 10 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-175 Page 1 of 2 Date Filed: September 28, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (CONTRACTS) Refer to Responses to OCC-044, and EOE-024. Compare and contrast the Confidential information provided in OCC-044, versus EOE- 024. As part of the response, explain why the Company included certain contracts in OCC-044, that were not consistent with the contracts provided in EOE-024, Att. 1. As an example, OCC-044, Att. 1, references Contract Nos. CW2292868 and CW2281565 for the Asplundh Construction Corp vendor where neither contract was referenced in EOE-024, Att. Specifically, EOE-024, Att. 1, references Contract Nos. CW2241580 and CW2280421. To the extent that the contracts are for different effective periods, please identify each vendor’s respective contract number(s), and provide the applicable contract term. Response: The question to OCC-044, requested for contracts for external line crew and vegetation contractors that have costs reflected in the storms presented for recovery in this docket and for all current external line crews. The question to EOE-024, requested for a copy of the Company’s Master Service Agreement (MSA) with each line crew contractor, in effect from 2018 to present. Accordingly, the two responses had different scopes: OCC-044, focused on the contracts and associated contract workspaces under which storm costs were incurred, while EOE-024, focused on the governing MSAs for line crew contractors. This difference in scope accounts for the differences in the contract numbers identified in the two responses. For Asplundh Construction Corp., OCC-044, Attachment 1, references Contract Nos. CW2292868 and CW2281565: • CW2292868 is an ERP Distribution Overhead Line Storm Restoration agreement with Asplundh Construction Corp. This agreement was included in OCC-044, because costs were incurred under it for storm events included in this docket. • CW2281565 is the sub-agreement contract workspace for the Construction Distribution Overhead Line agreement effective from 2021 through 2023. This contract workspace was included in OCC-044, because it contained the contract value and costs reflected in the storm events included in this docket.Page 11 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-175 Page 2 of 2 EOE-024, Attachment 1, references Contract Nos. CW2241580 and CW2280421: • CW2241580 is an MSA with an effective date beginning in 2018. It was included in EOE024, because that request sought the governing MSAs effective from 2018 to the present. It was not included in OCC-044. because it was not a current line crew contract and was not the contract workspace under which the applicable storm costs were recorded. • CW2280421 is the MSA contract workspace associated with the same Construction Distribution Overhead Line agreement represented by sub-agreement workspace CW2281565. The applicable agreement was effective from 2021 through 2023. In SAP Ariba, an MSA contract workspace contains the governing terms of the agreement but generally does not hold the associated contract value. The MSA may have one or more related subagreement contract workspaces under which the contract value and associated costs are recorded. Therefore, CW2280421, and CW2281565 are not two inconsistent agreements. CW2280421 is the governing MSA workspace, while CW2281565 is the related sub-agreement workspace under which the applicable value and storm costs were recorded. EOE-024, identified CW2280421 because that request sought the governing MSA. OCC-044, Attachment 1, identified CW2281565 because that request sought the contracts associated with costs reflected in the storm events included in this docket. Thus, although the two responses referenced different SAP Ariba contract workspace numbers, those numbers relate to the same underlying agreement.
As listed on the current system
Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)