Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (EOE Set 5 and UCONN Set 2)

Files3

Search terms highlighted
Eversource rate increase is on 11 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
9 pages match
  1. Page 21 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-181 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (VEGETATION EQUIPMENT) Refer to Responses to EOE-137 and OCC-101, Att.1 Confidential. The Company’s response to EOE-137 confirmed that the response to EOE-552 within Docket No. 25-12-13 “is accurate and has not resulted in any changes” and referred to OCC101, Att.1 Confidential for standard equipment that is included within existing contracts and rates. It does not appear that OCC-101, Att.1 has specified the standard equipment that is included with crews/vehicles and is otherwise non-billable. Consistent with EOE-552, confirm that “bucket truck crews will have a minimum of two chain saws on the truck included in the cost of the hourly bucket truck rate. For local tree crews working in Connecticut, the requirement is a minimum of two (oneman) gasoline chain saws (one with at least a 14-inch bar length and one with at least a 21-inch bar length).” If not confirmed, provide details on the billing practice changes and timing of the changes. Response: It is confirmed that “bucket truck crews will have a minimum of two chain saws on the truck included in the cost of the hourly bucket truck rate. For local tree crews working in Connecticut, the requirement is a minimum of two (one-man) gasoline chain saws (one with at least a 14-inch bar length and one with at least a 21-inch bar length)” per Section II Special Conditions & Amendments section of the Vegetation Management contracts, Section I, Equipment. Please refer to EOE-181, Attachment 1.
  2. Page 22 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-182 Page 1 of 1 Date Filed: September 28, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (WIRE GUARDS/COMP BID) Provide the competitive bid assessments performed for all vendors performing wire guard services included in the Company’s response to EOE-970 in Docket No. 25-12-13. (i.e. applicable for the years 2024-2025) Please provide any additional competitive bid assessments for all vendors performing wire guard services that have been performed that were not included in the Company’s response to EOE-970 applicable for the years 2024-2025. Response: The Company’s response to EOE-970 in Docket No. 25-12-13 addressed competitive bid information applicable through 2023 and did not include the subsequent procurement applicable to the 2024–2025 period. Please refer to EOE-182, Attachment 1 CONFIDENTIAL, for the competitive bid results associated with the 2024–2026 ERP Wires Down Guard RFP, which includes the competitive bid assessment applicable to vendors performing wire guard services during 2024–2025. The Company has not identified any additional competitive bid assessments applicable to the 2024–2025 period beyond those provided in EOE-182, Attachment 1 CONFIDENTIAL.
  3. Page 23 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-183 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio and Mark P. Baldwin Request from: Office of Education, Outreach, and Enforcement Question: (WIRE DOWN GUARDS) Identify if wire down guards require any unique qualifications, certifications, or experience. To the extent that unique qualifications, certifications, or experience are required, explain how the Company verifies that vendors only provide resources that meet these requirements. Response: Wire Down Guards do not require unique experience but do require training specific to this position that details the role and responsibilities, the hazards and safety policies/practices, and the recommended PPE Personal Protective Equipment. During the bid process, the contractors provide their safety procedures, manuals and training programs for their individual companies. This provides Eversource with details into the contractors training programs for their resources. The contractors are also reviewed by IS NetWorld and must maintain a passing score during the contract life cycle.
  4. Page 24 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-184 Page 1 of 1 Date Filed: September 25, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM INTERNAL CONTROLS) Refer to Response to EOE-009.Discuss the Company’s internal controls applicable to the accuracy of reported storm costs and identify if any of the storm events were subject to different controls. If differences in controls exist, describe the differences, explain why changes occurred, and identify the specific controls applicable to each event. Response: The corrective actions referenced in EOE-009 did not result in changes to the Company’s internal control policies. The storm events included in Docket 26-05-10 were not subject to different controls.
  5. Page 25 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-185 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (VEGETATION CREW BILLING) Refer to Responses to EOE-128 and EOE-129. If the standard workday ends at 4:30 PM, which includes a 30-minute unpaid lunch break, why are premium rates applied after 4:00 PM? Specifically, why would a vegetation crew who commenced billing at 2PM be allowed to commence billing at OT rates at 4PM in lieu of 4:30 PM. Response: Straight time billing rates and unpaid lunch apply to normally scheduled workdays Monday through Friday. Overtime (OT) rates and paid meal breaks apply to extended or altered scheduled workdays beyond the normal work hours.
  6. Page 26 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-186 Page 1 of 1 Date Filed: September 25, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MUTUAL AID) Refer to Response to EOE-038. Respond to the following: a. Referring to Att.2, the Company identified approximately $3.6 million of mutual aid services provided to affiliates. Please identify the specific dates for which these services were provided. b. Referring to Att.3, the Company identified various mutual aid service charges to nonaffiliated utility companies, including both incremental (e.g., over-time labor and outof-pocket expenses) and charges already included in base rates (e.g., straight time). Please identify the total amount of charges applicable to existing base rate activities and explain why the amounts were not offset from the revenue request. Response: a. Please refer to EOE-186, Attachment 1, for the dates of mutual aid services provided to affiliates for 2026. b. The charges referenced in EOE-038, Attachment 3, are not applicable to existing base rates as the current base rates were approved and authorized in Docket No. 17-10-46, with rates effective May 1, 2018. Further, the mutual aid charged to support Appalachian Energy would not have offset the revenue request in this rate proceeding because those charges occurred in 2024, compared to the Company’s 2025 Test Year.
  7. Page 27 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-187 Page 1 of 1 Date Filed: September 28, 2026 Witness: Christopher E. Colorio and Mark P. Baldwin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-TIMING) Refer to Exhibit CLP-STORM-IMT-3 (Event 1), and Response to EOE-019, Att.1. Explain how the information provided within Ex. CLP-STORM-IMT-3, supports an initial arrival time of 1800 within EOE-019, Att.1. As part of the response, discuss the Company’s expectations for when external vendors are expected to arrive in relation to the declared ERP event timing for all storm events. Additionally, discuss whether there are any differences between the expectations for local crews versus out of state crews. Response: Generally, the Company determines when outside line crews should arrive based on multiple operational factors, including the timing and anticipated impact of the storm; the scale of the restoration effort; and the Company’s anticipated resource needs. That said, external crews that are traveling to the Company’s system typically will arrive the night before the expected onset of the storm and commence their work shift at 6 AM the next morning. An arrival time of 1800, or another time relatively late in the day would be consistent with this practice. In this case, the event was forecast to commence Tuesday January 9th, and to last throughout the day and into the evening on Wednesday, January 10th. The forecast projected strong, damaging winds, with peak gusts ranging from 40-50 mph and higher gusts of up to 60 mph in the eastern and coastal areas. Therefore, the Company anticipated outages to occur on Wednesday, January 10th and to potentially last into subsequent days. On Tuesday, January 9th, Eversource activated its ERP at Event Level 4 and 6PM and opened Emergency Operations Centers in Hartford, New London and Newtown. By this time, the Company had secured 673 outside contract crews to work on the distribution system and 16 to work on the transmission system. However, not all the crews would have been on the system prior to the activation of the ERP on January 9th. Many crews would have arrived in Connecticut over the course of the day and the night on Tuesday, at the outset of the event. The initial arrival time of 1800 hours is consistent with these circumstances.
  8. Page 28 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-188 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1, Confidential Exhibit ACCT-2 CLP1A-1, pp. 29-56. The Company reported an incremental charge of $177,073 for the Asplundh Construction Corp. Respond to the following: a. Confirm that the difference between the reported recovery amount and the invoice amount is attributed to the “car vs. pole” activity referenced on p. 46. If not confirmed, explain the difference. b. Referring to p. 42, explain why each of the individuals billed for 10 hours at a DT rate (i.e., compared to pp. 31-32) when the first work assignment was not started until 10:29 (i.e., approx. 4.5 hours after the employees’ start time). Please explain why the vendor employees did not record activity as standby and bill at the lower TH rate prior to the first assignment. As part of the response, please identify the total incremental charge for the referenced employees billing at DT rates for the 4.5 hours in lieu of the TH rates. c. Referring to pp. 35-36, explain why the vendor billed for equipment during standby. As part of the response, identify the total incremental charge for the equipment billed during standby and separately identify the incremental equipment charge for the hours referenced in subsection b. Response: Please refer to Exhibit ACCT-2 CLP-1(MS24A), Outside Line Contractors, at Line 37, Asplundh Construction Corp, in the amount of $177,073. a. The Company confirms that the difference between the reported recovery amount and the total invoice amount is attributable to the car-versus-pole activity referenced on page 46. Specifically, the variance of $6,405.66 represents costs associated with the “car vs pole” incident, which was separately identified and not included in the reported recovery amount. b. The crews are in “working” status once they are on shift – from the beginning to the end of the shift. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an
  9. Page 29 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-188 Page 2 of 2 “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet. Additionally crews are dispatched as damage is assessed. Contractually when contractor crews are directed to be on shift and ready to receive work, they are automatically on “Work Time” rates, regardless of when they receive their first assignment. As a result, the crews are appropriately billed “Work Time” for the referenced hours. The total incremental charge for the referenced employees resulting from billing 4.5 hours at DT rates in lieu of TH rates is $997.65 c. Asplundh is a COC contractor. Per the provisions in their contract equipment -- while on standby -- is permitted to be charged at 50%. The total incremental charge for the equipment billed during standby for pages 35-36 is $3,938.22. The total incremental charge for the equipment billed for the hours referenced in subsection (b) is $398.25.
  10. Page 30 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-189 Page 1 of 2 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1, Confidential Exhibits ACCT-2 CLP-1A-1 through CLP-1A-6. The Company reported 154 incremental charges for the Asplundh Tree Expert Co vendor with approximately 24 invoices where work began before 1630 and continued overnight (Rows: 38, 65, 66, 67, 70, 71, 73, 74, 77, 82, 83, 84, 85, 86, 88,89, 90, 91, 92, 116, 129, 140, 188, and 191). Respond to the following: a. Explain why the vendor was not required to bill at ST rates for the hours billed through 1630. Further explain why certain invoices billed at ST rates through 1600 and other invoices failed to bill any hours at ST rates to include situations when the employees commenced billing at 1500 hours. (see e.g., Rows 38, 83-85, etc). b. Provide an unlocked Excel spreadsheet detailing each invoice referenced above (i.e., the referenced Rows) and identify the total number of hours billed at OT rates through 1630, along with the corresponding incremental charge. Specifically include the differential between the OT rate and ST rate multiplied by the number of hours billed at the OT rate through 1630. Response: a. Please refer to the Company’s response to EOE-128 i and EOE-128, Attachment 1. The blue sky normal working hours for tree crews are 7:00 AM to 4:30 PM (or, stated differently, 07:00 to 16:30) and the tree crews are paid nine hours of straight time for time worked during these hours, up to the first 45 working hours, with a 30-minute unpaid meal break. The 30-minute unpaid meal break is in accordance with CT G.S. Chapter 557 Section 31-51ii Subsection A, which states: “No person shall be required to work for seven and one-half or more consecutive hours without a period of at least thirty consecutive minutes for a meal. Such period shall be given at some time after the first two hours of work and before the last two hours.” The period is unpaid in accordance with the Fair Labor Standards Act, which states: “Federal law does not require lunch or coffee breaks… Meal periods (typically lasting at least 30 minutes), serve a different purpose than coffee or snack breaks and, thus, are not work time and are not compensable.” The storm normal working hours are from 7:00 AM to 4:00 PM (or, stated differently, 07:00 to 16:00). This is due to the fact that a 30-minute, undisturbed, break cannot be guaranteed during storm response activities and duties, in accordance with CT G.S. Chapter 557 Section
2 pages match

As listed on the current system

Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)

This filing on the current system (opens in a new tab)