Discovery Compilation (EOE Set 5 and UCONN Set 2)
Files3
Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
EOE Set 5_COMBINED.pdf
PDF · 1.3 MB · 169 pagesText searchable
Download EOE Set 5_COMBINED.pdfRead the text of EOE Set 5_COMBINED.pdf
UCONN Set 2_COMBINED.pdf
PDF · 372 KB · 19 pagesText searchable
Download UCONN Set 2_COMBINED.pdfRead the text of UCONN Set 2_COMBINED.pdf
Page 25 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-185 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (VEGETATION CREW BILLING) Refer to Responses to EOE-128 and EOE-129. If the standard workday ends at 4:30 PM, which includes a 30-minute unpaid lunch break, why are premium rates applied after 4:00 PM? Specifically, why would a vegetation crew who commenced billing at 2PM be allowed to commence billing at OT rates at 4PM in lieu of 4:30 PM. Response: Straight time billing rates and unpaid lunch apply to normally scheduled workdays Monday through Friday. Overtime (OT) rates and paid meal breaks apply to extended or altered scheduled workdays beyond the normal work hours.Page 26 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-186 Page 1 of 1 Date Filed: September 25, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MUTUAL AID) Refer to Response to EOE-038. Respond to the following: a. Referring to Att.2, the Company identified approximately $3.6 million of mutual aid services provided to affiliates. Please identify the specific dates for which these services were provided. b. Referring to Att.3, the Company identified various mutual aid service charges to nonaffiliated utility companies, including both incremental (e.g., over-time labor and outof-pocket expenses) and charges already included in base rates (e.g., straight time). Please identify the total amount of charges applicable to existing base rate activities and explain why the amounts were not offset from the revenue request. Response: a. Please refer to EOE-186, Attachment 1, for the dates of mutual aid services provided to affiliates for 2026. b. The charges referenced in EOE-038, Attachment 3, are not applicable to existing base rates as the current base rates were approved and authorized in Docket No. 17-10-46, with rates effective May 1, 2018. Further, the mutual aid charged to support Appalachian Energy would not have offset the revenue request in this rate proceeding because those charges occurred in 2024, compared to the Company’s 2025 Test Year.Page 27 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-187 Page 1 of 1 Date Filed: September 28, 2026 Witness: Christopher E. Colorio and Mark P. Baldwin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-TIMING) Refer to Exhibit CLP-STORM-IMT-3 (Event 1), and Response to EOE-019, Att.1. Explain how the information provided within Ex. CLP-STORM-IMT-3, supports an initial arrival time of 1800 within EOE-019, Att.1. As part of the response, discuss the Company’s expectations for when external vendors are expected to arrive in relation to the declared ERP event timing for all storm events. Additionally, discuss whether there are any differences between the expectations for local crews versus out of state crews. Response: Generally, the Company determines when outside line crews should arrive based on multiple operational factors, including the timing and anticipated impact of the storm; the scale of the restoration effort; and the Company’s anticipated resource needs. That said, external crews that are traveling to the Company’s system typically will arrive the night before the expected onset of the storm and commence their work shift at 6 AM the next morning. An arrival time of 1800, or another time relatively late in the day would be consistent with this practice. In this case, the event was forecast to commence Tuesday January 9th, and to last throughout the day and into the evening on Wednesday, January 10th. The forecast projected strong, damaging winds, with peak gusts ranging from 40-50 mph and higher gusts of up to 60 mph in the eastern and coastal areas. Therefore, the Company anticipated outages to occur on Wednesday, January 10th and to potentially last into subsequent days. On Tuesday, January 9th, Eversource activated its ERP at Event Level 4 and 6PM and opened Emergency Operations Centers in Hartford, New London and Newtown. By this time, the Company had secured 673 outside contract crews to work on the distribution system and 16 to work on the transmission system. However, not all the crews would have been on the system prior to the activation of the ERP on January 9th. Many crews would have arrived in Connecticut over the course of the day and the night on Tuesday, at the outset of the event. The initial arrival time of 1800 hours is consistent with these circumstances.Page 28 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-188 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1, Confidential Exhibit ACCT-2 CLP1A-1, pp. 29-56. The Company reported an incremental charge of $177,073 for the Asplundh Construction Corp. Respond to the following: a. Confirm that the difference between the reported recovery amount and the invoice amount is attributed to the “car vs. pole” activity referenced on p. 46. If not confirmed, explain the difference. b. Referring to p. 42, explain why each of the individuals billed for 10 hours at a DT rate (i.e., compared to pp. 31-32) when the first work assignment was not started until 10:29 (i.e., approx. 4.5 hours after the employees’ start time). Please explain why the vendor employees did not record activity as standby and bill at the lower TH rate prior to the first assignment. As part of the response, please identify the total incremental charge for the referenced employees billing at DT rates for the 4.5 hours in lieu of the TH rates. c. Referring to pp. 35-36, explain why the vendor billed for equipment during standby. As part of the response, identify the total incremental charge for the equipment billed during standby and separately identify the incremental equipment charge for the hours referenced in subsection b. Response: Please refer to Exhibit ACCT-2 CLP-1(MS24A), Outside Line Contractors, at Line 37, Asplundh Construction Corp, in the amount of $177,073. a. The Company confirms that the difference between the reported recovery amount and the total invoice amount is attributable to the car-versus-pole activity referenced on page 46. Specifically, the variance of $6,405.66 represents costs associated with the “car vs pole” incident, which was separately identified and not included in the reported recovery amount. b. The crews are in “working” status once they are on shift – from the beginning to the end of the shift. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in anPage 29 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-188 Page 2 of 2 “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet. Additionally crews are dispatched as damage is assessed. Contractually when contractor crews are directed to be on shift and ready to receive work, they are automatically on “Work Time” rates, regardless of when they receive their first assignment. As a result, the crews are appropriately billed “Work Time” for the referenced hours. The total incremental charge for the referenced employees resulting from billing 4.5 hours at DT rates in lieu of TH rates is $997.65 c. Asplundh is a COC contractor. Per the provisions in their contract equipment -- while on standby -- is permitted to be charged at 50%. The total incremental charge for the equipment billed during standby for pages 35-36 is $3,938.22. The total incremental charge for the equipment billed for the hours referenced in subsection (b) is $398.25.Page 30 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-189 Page 1 of 2 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1, Confidential Exhibits ACCT-2 CLP-1A-1 through CLP-1A-6. The Company reported 154 incremental charges for the Asplundh Tree Expert Co vendor with approximately 24 invoices where work began before 1630 and continued overnight (Rows: 38, 65, 66, 67, 70, 71, 73, 74, 77, 82, 83, 84, 85, 86, 88,89, 90, 91, 92, 116, 129, 140, 188, and 191). Respond to the following: a. Explain why the vendor was not required to bill at ST rates for the hours billed through 1630. Further explain why certain invoices billed at ST rates through 1600 and other invoices failed to bill any hours at ST rates to include situations when the employees commenced billing at 1500 hours. (see e.g., Rows 38, 83-85, etc). b. Provide an unlocked Excel spreadsheet detailing each invoice referenced above (i.e., the referenced Rows) and identify the total number of hours billed at OT rates through 1630, along with the corresponding incremental charge. Specifically include the differential between the OT rate and ST rate multiplied by the number of hours billed at the OT rate through 1630. Response: a. Please refer to the Company’s response to EOE-128 i and EOE-128, Attachment 1. The blue sky normal working hours for tree crews are 7:00 AM to 4:30 PM (or, stated differently, 07:00 to 16:30) and the tree crews are paid nine hours of straight time for time worked during these hours, up to the first 45 working hours, with a 30-minute unpaid meal break. The 30-minute unpaid meal break is in accordance with CT G.S. Chapter 557 Section 31-51ii Subsection A, which states: “No person shall be required to work for seven and one-half or more consecutive hours without a period of at least thirty consecutive minutes for a meal. Such period shall be given at some time after the first two hours of work and before the last two hours.” The period is unpaid in accordance with the Fair Labor Standards Act, which states: “Federal law does not require lunch or coffee breaks… Meal periods (typically lasting at least 30 minutes), serve a different purpose than coffee or snack breaks and, thus, are not work time and are not compensable.” The storm normal working hours are from 7:00 AM to 4:00 PM (or, stated differently, 07:00 to 16:00). This is due to the fact that a 30-minute, undisturbed, break cannot be guaranteed during storm response activities and duties, in accordance with CT G.S. Chapter 557 SectionPage 31 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-189 Page 2 of 2 31-51ii Subsection C Part 4, which states: “the continuous nature of an employer's operations, such as chemical production or research experiments, requires that employees be available to respond to urgent or unusual conditions at all times and such employees are compensated for break and meal periods.” The distinction between normal working hours, 07:00 to 16:30, and storm working hours, 07:00 to 16:00, is due to the continuous nature of the Company’s storm response activities and the statutory requirement to compensate employees for their meal period when they are required to respond to urgent or unusual conditions at all times. Therefore, straight time rates during storm response are applied between 07:00 to 16:00. b. Please refer to EOE-189, Attachment 1 CONFIDENTIAL, for an unlocked spreadsheet calculating the differential between the OT and ST rate multiplied by the number of hours billed at the OT rate from 07:00 through 16:00, totaling $625.83. The Company will supplement Exhibit ACCT-2 (CLP-01) (MS24A) to remove $626. Prior Referenced Responses: i EOE-128 Question: (VEGETATION CREW HOURS) Confirm whether each tree crew vendor’s contractual “normal working hours” remain 7 AM to 4:30 PM (i.e., 0700 to 1630) for each weekday, or a maximum of 9 hours. As part of the response, identify each tree crew vendor and cite the contract provisions that detail these hours. If the contracts do not detail the normal working hours, please provide email or other communications supporting the normal working hours that would bill at standard time (ST) rates. EOE-128 Response: The normal working hours for local tree crews are confirmed as 7 AM to 4:30 PM (or, stated differently, 07:00 to 16:30) and the tree crews are paid nine hours of straight time for time worked during these hours, up to the first 45 working hours, with a 30-minute unpaid meal break. This language is not included in contract provisions, rather it is a department practice. Please refer to EOE-128, Attachment 1, for the Eversource Contractor Tree Crew Work Schedule.Page 32 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-190 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-1, pp. 60-62. The Company reported an incremental charge of $1,507 for the Asplundh Tree Expert Co. Referring to p. 62, please explain why the Eversource Connecticut Emergency Restoration Tree Contractor Work Location includes no Emergency Call Out Information? If this report is not indicative of standby, explain why the document was not completed. Provide all applicable policies, procedures, or guidance that outlines the requirements for completing the Eversource Connecticut Emergency Restoration Tree Contractor Work Location report. Response: The tree crew did not record any event locations. Tree crews do not have standby time like line crews do, all their time on storm shift assignment is work time. The Eversource Connecticut Emergency Restoration Tree Contractor Work Location report is included in the Company’s contract documents, please refer to EOE-190, Attachment 1. The Special Conditions and Amendments Section II of the contract states “Crews are required submit an Emergency Restoration Form for each day of restoration with the time sheet.”Page 33 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-191 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-1, pp. 150-153. The Company reported an incremental charge of $1,984 for the Asplundh Tree Expert Co, which included a miscellaneous charge of $600 for log removal. Explain why the Company was responsible for the removal of logs in lieu of the property owner or municipality. As part of the response, identify if the Company provided any form of pre-authorization for 3rd party charges, explain the specific services performed by the 3rd party (i.e., Grillo Services LLC), and explain why those services were necessary for storm remediation purposes. Response: The $600 charge from Grillo Services LLC, included in the Asplundh Tree Expert Co. invoice, was incurred for log removal and disposal associated with storm restoration activities. These services were necessary to safely clear roads and restore access to electric facilities in locations where limited shoulder space, site constraints, or safety concerns prevented logs from being left on-site. While trees are left on-site for most storm-related work locations, some situations require removal because doing so would create a public safety hazard or impede roadway access. Because log trucks move between storm locations, often across multiple municipalities, it is not practical to divert restoration resources to deliver wood material to individual municipal facilities. During storm response, log trucks may be used to remove large trunk sections and, when necessary, safely support unstable tree sections with their grapples where no safe drop zone exists. Log trucks also substantially improve restoration efficiency. Large-diameter trunk sections that would otherwise require significant time for ground crews to cut, move, and stage manually can often be removed in minutes, allowing roads to be reopened faster and restoration resources to be deployed to additional outage locations. The Company authorized the use of these services through its storm restoration contractor as part of the overall restoration effort. Because the work was performed to facilitate blocked-road clearing and the safe restoration of electric service, the associated costs were appropriately incurred by the Company as storm remediation expense.Page 34 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-192 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-1, pp. 250-252. The Company reported an incremental charge of $4,471 for the Asplundh Tree Expert Co. Explain why the crew of two individuals were permitted to bill for both a 100’ Lift and a separate pick-up truck for storm restoration efforts in lieu of sharing a single vehicle. Response: A 100’ lift truck does not have as much storage space as standard bucket trucks. A crew member may bring a pick up truck with all the required safety and job site tools needed such as traffic control signs, chainsaws, fuel, ropes, and other required materials that cannot fit within the storage of a 100’ lift truck.
As listed on the current system
Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)