Discovery Compilation (EOE Set 5 and UCONN Set 2)
Files3
Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
EOE Set 5_COMBINED.pdf
PDF · 1.3 MB · 169 pagesText searchable
Download EOE Set 5_COMBINED.pdfRead the text of EOE Set 5_COMBINED.pdf
UCONN Set 2_COMBINED.pdf
PDF · 372 KB · 19 pagesText searchable
Download UCONN Set 2_COMBINED.pdfRead the text of UCONN Set 2_COMBINED.pdf
Page 30 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-189 Page 1 of 2 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1, Confidential Exhibits ACCT-2 CLP-1A-1 through CLP-1A-6. The Company reported 154 incremental charges for the Asplundh Tree Expert Co vendor with approximately 24 invoices where work began before 1630 and continued overnight (Rows: 38, 65, 66, 67, 70, 71, 73, 74, 77, 82, 83, 84, 85, 86, 88,89, 90, 91, 92, 116, 129, 140, 188, and 191). Respond to the following: a. Explain why the vendor was not required to bill at ST rates for the hours billed through 1630. Further explain why certain invoices billed at ST rates through 1600 and other invoices failed to bill any hours at ST rates to include situations when the employees commenced billing at 1500 hours. (see e.g., Rows 38, 83-85, etc). b. Provide an unlocked Excel spreadsheet detailing each invoice referenced above (i.e., the referenced Rows) and identify the total number of hours billed at OT rates through 1630, along with the corresponding incremental charge. Specifically include the differential between the OT rate and ST rate multiplied by the number of hours billed at the OT rate through 1630. Response: a. Please refer to the Company’s response to EOE-128 i and EOE-128, Attachment 1. The blue sky normal working hours for tree crews are 7:00 AM to 4:30 PM (or, stated differently, 07:00 to 16:30) and the tree crews are paid nine hours of straight time for time worked during these hours, up to the first 45 working hours, with a 30-minute unpaid meal break. The 30-minute unpaid meal break is in accordance with CT G.S. Chapter 557 Section 31-51ii Subsection A, which states: “No person shall be required to work for seven and one-half or more consecutive hours without a period of at least thirty consecutive minutes for a meal. Such period shall be given at some time after the first two hours of work and before the last two hours.” The period is unpaid in accordance with the Fair Labor Standards Act, which states: “Federal law does not require lunch or coffee breaks… Meal periods (typically lasting at least 30 minutes), serve a different purpose than coffee or snack breaks and, thus, are not work time and are not compensable.” The storm normal working hours are from 7:00 AM to 4:00 PM (or, stated differently, 07:00 to 16:00). This is due to the fact that a 30-minute, undisturbed, break cannot be guaranteed during storm response activities and duties, in accordance with CT G.S. Chapter 557 SectionPage 31 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-189 Page 2 of 2 31-51ii Subsection C Part 4, which states: “the continuous nature of an employer's operations, such as chemical production or research experiments, requires that employees be available to respond to urgent or unusual conditions at all times and such employees are compensated for break and meal periods.” The distinction between normal working hours, 07:00 to 16:30, and storm working hours, 07:00 to 16:00, is due to the continuous nature of the Company’s storm response activities and the statutory requirement to compensate employees for their meal period when they are required to respond to urgent or unusual conditions at all times. Therefore, straight time rates during storm response are applied between 07:00 to 16:00. b. Please refer to EOE-189, Attachment 1 CONFIDENTIAL, for an unlocked spreadsheet calculating the differential between the OT and ST rate multiplied by the number of hours billed at the OT rate from 07:00 through 16:00, totaling $625.83. The Company will supplement Exhibit ACCT-2 (CLP-01) (MS24A) to remove $626. Prior Referenced Responses: i EOE-128 Question: (VEGETATION CREW HOURS) Confirm whether each tree crew vendor’s contractual “normal working hours” remain 7 AM to 4:30 PM (i.e., 0700 to 1630) for each weekday, or a maximum of 9 hours. As part of the response, identify each tree crew vendor and cite the contract provisions that detail these hours. If the contracts do not detail the normal working hours, please provide email or other communications supporting the normal working hours that would bill at standard time (ST) rates. EOE-128 Response: The normal working hours for local tree crews are confirmed as 7 AM to 4:30 PM (or, stated differently, 07:00 to 16:30) and the tree crews are paid nine hours of straight time for time worked during these hours, up to the first 45 working hours, with a 30-minute unpaid meal break. This language is not included in contract provisions, rather it is a department practice. Please refer to EOE-128, Attachment 1, for the Eversource Contractor Tree Crew Work Schedule.Page 32 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-190 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-1, pp. 60-62. The Company reported an incremental charge of $1,507 for the Asplundh Tree Expert Co. Referring to p. 62, please explain why the Eversource Connecticut Emergency Restoration Tree Contractor Work Location includes no Emergency Call Out Information? If this report is not indicative of standby, explain why the document was not completed. Provide all applicable policies, procedures, or guidance that outlines the requirements for completing the Eversource Connecticut Emergency Restoration Tree Contractor Work Location report. Response: The tree crew did not record any event locations. Tree crews do not have standby time like line crews do, all their time on storm shift assignment is work time. The Eversource Connecticut Emergency Restoration Tree Contractor Work Location report is included in the Company’s contract documents, please refer to EOE-190, Attachment 1. The Special Conditions and Amendments Section II of the contract states “Crews are required submit an Emergency Restoration Form for each day of restoration with the time sheet.”Page 33 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-191 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-1, pp. 150-153. The Company reported an incremental charge of $1,984 for the Asplundh Tree Expert Co, which included a miscellaneous charge of $600 for log removal. Explain why the Company was responsible for the removal of logs in lieu of the property owner or municipality. As part of the response, identify if the Company provided any form of pre-authorization for 3rd party charges, explain the specific services performed by the 3rd party (i.e., Grillo Services LLC), and explain why those services were necessary for storm remediation purposes. Response: The $600 charge from Grillo Services LLC, included in the Asplundh Tree Expert Co. invoice, was incurred for log removal and disposal associated with storm restoration activities. These services were necessary to safely clear roads and restore access to electric facilities in locations where limited shoulder space, site constraints, or safety concerns prevented logs from being left on-site. While trees are left on-site for most storm-related work locations, some situations require removal because doing so would create a public safety hazard or impede roadway access. Because log trucks move between storm locations, often across multiple municipalities, it is not practical to divert restoration resources to deliver wood material to individual municipal facilities. During storm response, log trucks may be used to remove large trunk sections and, when necessary, safely support unstable tree sections with their grapples where no safe drop zone exists. Log trucks also substantially improve restoration efficiency. Large-diameter trunk sections that would otherwise require significant time for ground crews to cut, move, and stage manually can often be removed in minutes, allowing roads to be reopened faster and restoration resources to be deployed to additional outage locations. The Company authorized the use of these services through its storm restoration contractor as part of the overall restoration effort. Because the work was performed to facilitate blocked-road clearing and the safe restoration of electric service, the associated costs were appropriately incurred by the Company as storm remediation expense.Page 34 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-192 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-1, pp. 250-252. The Company reported an incremental charge of $4,471 for the Asplundh Tree Expert Co. Explain why the crew of two individuals were permitted to bill for both a 100’ Lift and a separate pick-up truck for storm restoration efforts in lieu of sharing a single vehicle. Response: A 100’ lift truck does not have as much storage space as standard bucket trucks. A crew member may bring a pick up truck with all the required safety and job site tools needed such as traffic control signs, chainsaws, fuel, ropes, and other required materials that cannot fit within the storage of a 100’ lift truck.Page 35 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-193 Page 1 of 3 Date Filed: September 25, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE-TRAVEL) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-2, pp. 104-142. The Company reported two incremental charges in the total amount of $58,139 for the Asplundh Tree Expert Co. The two charges applied to travel (i.e., mobilization and demobilization) to/from Weston, WV and Guilford, CT and seven hours of standby (i.e., pp. 106 and 133). Respond to the following: a. Explain why the vendor was permitted to bill for 18 hours of mobilization and 14 hours of demobilization when the estimated travel was approximately 8.5 hours (i.e., pp. 128131, 139-142). As part of the response, provide emails or other correspondence obtained during the initial review to support the hours billed. Additionally, identify the total incremental costs for the hours billed in excess of the estimated travel. b. Confirm that each vendor employee billed for four total days of meals (i.e., pp. 105 and 132) when each employee only worked for six hours on day one and five hours on day four. If confirmed, cite the contract provisions that permit the billing of an entire day’s worth of meals per diem when the vendor worked for only six and five hours, respectively. Response: a. Please refer to the Company’s response to EOE-130 i, which explains that Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, etc.) in travel time calculations. The aforementioned factors and variables are known to impact travel time. The maps are provided as a reference to substantiate the miles and travel time billed and are compiled during the invoice creation process and do not reflect weather/traffic-related delays during the actual mobilization and demobilization process. The associated travel time was completed during a significant winter storm and travel conditions were poor including heavy, wet snow, which impacted the travel time further.Page 36 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-193 Page 2 of 3 b. Each of the 13 vendor employees billed four meal per diems. Per Section 2, subsection D, part 5, of the vendor’s contract, “If meals are not provided by the Company, a per diem of $65 per person will be compensated for meals. Prior Referenced Response: i EOE-130 Question: (VENDOR TRAVEL) Explain the Company’s travel review process for external vendors to include any assumptions for determining whether mobilization/demobilization travel time would be considered reasonable (i.e. in relation to Google/MapQuest estimates), how estimates would be increased by escalation factors, whether the review process differs for different vendors or types of vendors, and whether the Company has performed a study supporting that policy. Additionally, identify if the Company has changed its position outlined within its supplemental response to OCC-41 from Docket No. 25-12-13. EOE-130 Response: The Company applies the formula described below to determine whether line and vegetation crews can mobilize, travel and arrive on a timeline to assist productively in restoration. The Company uses a formula to calculate daily travel time capability of a line crew traveling at 60 mph for 10 hours (maximum drive time), or approximately 600 miles per day. Based on the expected duration of the restoration, the Company will procure crews factoring in this travel time when validating invoices. The Company looks at the location of mobilization, the 600 miles per day and any external factors that may come into play to determine what is a reasonable travel time when reviewing and approving invoices. Application of the above formula combined with the overall projected impact of the weather event (i.e. duration of restoration, number of potentially impacted states, availability of local or regional resources) enables the Company to determine, on an event by event basis, what travel time is reasonable. Due to size, refueling and possible weather/traffic delays, actual daily mileage of a bucket truck may differ from 600 miles per day. Google Maps is a useful reference point for determining travel time. However, the accuracy and reliability of Google Maps data is subject to qualification in its terms of use, and therefore it should not be relied upon as the exclusive measure of reasonable travel time. In Docket No. 25-12-13 the Company responded to OCC-041 and associated attachments provided here for reference as EOE-130, Attachment 1. Page 2 of OCC-041-SP01, Attachment 1 (which is page 4 of 24 of EOE-130 Attachment 1), is the Google Maps End User Additional Terms of Service (“Google Maps T&Cs”), and states that: “When you use Google Maps map data, traffic, directions, and other content, you may find that actual conditions differ from the map results and content, so exercise your independent judgment and use Google Maps at your own risk.” The Google Maps T&Cs further provide that end users of Google Maps must accept the Google Terms of Service, which is attached hereto as OCC-041-SP01, Attachment 2 (which is page 5 of 24 of EOE130 Attachment 1). Page 13 of OCC-041-SP01, Attachment 2 (which is page 17 of 24 of EOE-130 Attachment 1), presents the following warranty disclaimer: TO THE EXTENT ALLOWED BY APPLICABLE LAW, WE PROVIDE OUR SERVICES “AS IS” WITHOUT ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, ANDPage 37 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-193 Page 3 of 3 NON-INFRINGEMENT. FOR EXAMPLE, WE DON’T MAKE ANY WARRANTIES ABOUT THE CONTENT OR FEATURES OF THE SERVICES, INCLUDING THEIR ACCURACY, RELIABILITY, AVAILABILITY, OR ABILITY TO MEET YOUR NEEDS. DON’T RELY ON THE SERVICES FOR MEDICAL, LEGAL, FINANCIAL, OR OTHER PROFESSIONAL ADVICE. ANY CONTENT REGARDING THOSE TOPICS IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY AND IS NOT A SUBSTITUTE FOR ADVICE FROM A QUALIFIED PROFESSIONAL. As the Company has explained in its response to several discovery responses in Docket Nos. 24-03-30 and 25-12-13, all provided here for ease of reference as EOE-130, Attachment 2 (see, e.g., OCC-031; EOE-501; EOE-517; EOE536; and EOE-0590), Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, lifters, pole trailers, diggers/derricks, etc.) in travel time calculations. Each of these factors can affect the actual time it takes for a contractor to arrive at the contractor’s designated location in the Company’s service territory and, therefore, are appropriate for consideration in the cost validation process. Accordingly, the Company uses the estimated time calculated by Google Maps for car travel as a data point and multiplies that figure by a factor of 1.3 hours to compute a reasonable benchmark for actual travel time. The Company applies the 1.3 hours factor to account for, among other things, the slower speed of fully loaded line trucks that travel as a convoy and make more frequent stops than a conventional sedan vehicle. The Company further evaluates the reasonableness of travel time based on its experience and professional judgment on an event-by-event basis. These additional layers of analysis are necessary because Google Maps does not account for factors and variables that are known to impact travel time. Thus, Google Maps cannot, and should not, be relied upon as the sole measure of travel time.Page 38 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-194 Page 1 of 3 Date Filed: September 28, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE-TRAVEL) Refer to Exhibit ACCT-2 CLP-1 (rows 159-176 and 178187), and Confidential Exhibits ACCT-2 CLP-1A-2, through CLP-1A-6. The Company reported 28 incremental charges in the combined amount of $982,455 for the Asplundh Tree Expert Co. Each of the charges primarily applied to travel (i.e., mobilization and demobilization) between Connecticut and North Carolina, Kentucky, New Jersey, Virginia, Maryland, or Ohio. Provide an unlocked Excel spreadsheet analyzing the total billable travel hours (i.e., both labor and equipment) for each invoice based on the billed travel time versus the estimated travel time, as included within the supporting documentation (see e.g., Exhibit CLP- 1A-2, p. 156). To the extent that the billed travel hours were in excess of 1.3 times the estimated hours, please provide any contemporaneous documentation that supports the evaluation and approval of the excess billed hours, as well as an estimated cost impact of the excess costs. To assist with this request, EOE offers the following visual but is amenable to other included information. Response: Please refer to the Company’s response to EOE-130 i, which explains that Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, etc.) in travel time calculations. The aforementioned factors and variables are known to impact travel time. The maps are provided as a reference to substantiate the miles and travel time billed and are compiled during the invoice creation process and do not reflect weather/traffic-related delays during the actual mobilization and demobilization process. The associated mobilization and demobilization time was completed during a significant winter storm and travel conditions were poor including heavy, wet snow during mobilization, along with heavy rain and wind during demobilization, which impacted the travel time further.Page 39 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-194 Page 2 of 3 EOE is requesting a compilation of disparate data that is available to EOE, in the invoices and associated timesheets that pertain to Tree Crew for the MS24A event. The Company’s regulatory requirement is to utilize the timesheets to document the hours worked by each crew, for each vendor, in order to support payment to that vendor. Accordingly, the Company’s processes are constructed to obtain and use those records for validating payment, subject to review and sign off by Eversource Arborist, who has contemporaneous knowledge of the work performed. The Company’s financial systems do not record invoiced amounts by data field, for each data point included on the invoices or the associated timesheets. Therefore, extracting and compiling this information from the timesheets in the manner sought by EOE, would require extensive manual efforts that can be performed by EOE or EOE’s consultant, if Information in that format assists EOE in putting forth its case. Prior Referenced Response: i EOE-130 Question: (VENDOR TRAVEL) Explain the Company’s travel review process for external vendors to include any assumptions for determining whether mobilization/demobilization travel time would be considered reasonable (i.e. in relation to Google/MapQuest estimates), how estimates would be increased by escalation factors, whether the review process differs for different vendors or types of vendors, and whether the Company has performed a study supporting that policy. Additionally, identify if the Company has changed its position outlined within its supplemental response to OCC-41, from Docket No. 25-12-13. EOE-130 Response: The Company applies the formula described below to determine whether line and vegetation crews can mobilize, travel and arrive on a timeline to assist productively in restoration. The Company uses a formula to calculate daily travel time capability of a line crew traveling at 60 mph for 10 hours (maximum drive time), or approximately 600 miles per day. Based on the expected duration of the restoration, the Company will procure crews factoring in this travel time when validating invoices. The Company looks at the location of mobilization, the 600 miles per day and any external factors that may come into play to determine what is a reasonable travel time when reviewing and approving invoices. Application of the above formula combined with the overall projected impact of the weather event (i.e. duration of restoration, number of potentially impacted states, availability of local or regional resources) enables the Company to determine, on an event by event basis, what travel time is reasonable. Due to size, refueling and possible weather/traffic delays, actual daily mileage of a bucket truck may differ from 600 miles per day. Google Maps is a useful reference point for determining travel time. However, the accuracy and reliability of Google Maps data is subject to qualification in its terms of use, and therefore it should not be relied upon as the exclusive measure of reasonable travel time. In Docket No. 25-12-13, the Company responded to OCC-041 and associated attachments provided here for reference as EOE-130, Attachment 1. Page 2 of OCC-041-SP01, Attachment 1 (which is page 4 of 24 of EOE-130 Attachment 1), is the Google Maps End User Additional Terms of Service (“Google Maps
As listed on the current system
Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)