Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (EOE Set 5 and UCONN Set 2)

Files3

Search terms highlighted
Eversource rate increase is on 11 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
9 pages match
  1. Page 32 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-190 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-1, pp. 60-62. The Company reported an incremental charge of $1,507 for the Asplundh Tree Expert Co. Referring to p. 62, please explain why the Eversource Connecticut Emergency Restoration Tree Contractor Work Location includes no Emergency Call Out Information? If this report is not indicative of standby, explain why the document was not completed. Provide all applicable policies, procedures, or guidance that outlines the requirements for completing the Eversource Connecticut Emergency Restoration Tree Contractor Work Location report. Response: The tree crew did not record any event locations. Tree crews do not have standby time like line crews do, all their time on storm shift assignment is work time. The Eversource Connecticut Emergency Restoration Tree Contractor Work Location report is included in the Company’s contract documents, please refer to EOE-190, Attachment 1. The Special Conditions and Amendments Section II of the contract states “Crews are required submit an Emergency Restoration Form for each day of restoration with the time sheet.”
  2. Page 33 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-191 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-1, pp. 150-153. The Company reported an incremental charge of $1,984 for the Asplundh Tree Expert Co, which included a miscellaneous charge of $600 for log removal. Explain why the Company was responsible for the removal of logs in lieu of the property owner or municipality. As part of the response, identify if the Company provided any form of pre-authorization for 3rd party charges, explain the specific services performed by the 3rd party (i.e., Grillo Services LLC), and explain why those services were necessary for storm remediation purposes. Response: The $600 charge from Grillo Services LLC, included in the Asplundh Tree Expert Co. invoice, was incurred for log removal and disposal associated with storm restoration activities. These services were necessary to safely clear roads and restore access to electric facilities in locations where limited shoulder space, site constraints, or safety concerns prevented logs from being left on-site. While trees are left on-site for most storm-related work locations, some situations require removal because doing so would create a public safety hazard or impede roadway access. Because log trucks move between storm locations, often across multiple municipalities, it is not practical to divert restoration resources to deliver wood material to individual municipal facilities. During storm response, log trucks may be used to remove large trunk sections and, when necessary, safely support unstable tree sections with their grapples where no safe drop zone exists. Log trucks also substantially improve restoration efficiency. Large-diameter trunk sections that would otherwise require significant time for ground crews to cut, move, and stage manually can often be removed in minutes, allowing roads to be reopened faster and restoration resources to be deployed to additional outage locations. The Company authorized the use of these services through its storm restoration contractor as part of the overall restoration effort. Because the work was performed to facilitate blocked-road clearing and the safe restoration of electric service, the associated costs were appropriately incurred by the Company as storm remediation expense.
  3. Page 34 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-192 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-1, pp. 250-252. The Company reported an incremental charge of $4,471 for the Asplundh Tree Expert Co. Explain why the crew of two individuals were permitted to bill for both a 100’ Lift and a separate pick-up truck for storm restoration efforts in lieu of sharing a single vehicle. Response: A 100’ lift truck does not have as much storage space as standard bucket trucks. A crew member may bring a pick up truck with all the required safety and job site tools needed such as traffic control signs, chainsaws, fuel, ropes, and other required materials that cannot fit within the storage of a 100’ lift truck.
  4. Page 35 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-193 Page 1 of 3 Date Filed: September 25, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE-TRAVEL) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-2, pp. 104-142. The Company reported two incremental charges in the total amount of $58,139 for the Asplundh Tree Expert Co. The two charges applied to travel (i.e., mobilization and demobilization) to/from Weston, WV and Guilford, CT and seven hours of standby (i.e., pp. 106 and 133). Respond to the following: a. Explain why the vendor was permitted to bill for 18 hours of mobilization and 14 hours of demobilization when the estimated travel was approximately 8.5 hours (i.e., pp. 128131, 139-142). As part of the response, provide emails or other correspondence obtained during the initial review to support the hours billed. Additionally, identify the total incremental costs for the hours billed in excess of the estimated travel. b. Confirm that each vendor employee billed for four total days of meals (i.e., pp. 105 and 132) when each employee only worked for six hours on day one and five hours on day four. If confirmed, cite the contract provisions that permit the billing of an entire day’s worth of meals per diem when the vendor worked for only six and five hours, respectively. Response: a. Please refer to the Company’s response to EOE-130 i, which explains that Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, etc.) in travel time calculations. The aforementioned factors and variables are known to impact travel time. The maps are provided as a reference to substantiate the miles and travel time billed and are compiled during the invoice creation process and do not reflect weather/traffic-related delays during the actual mobilization and demobilization process. The associated travel time was completed during a significant winter storm and travel conditions were poor including heavy, wet snow, which impacted the travel time further.
  5. Page 36 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-193 Page 2 of 3 b. Each of the 13 vendor employees billed four meal per diems. Per Section 2, subsection D, part 5, of the vendor’s contract, “If meals are not provided by the Company, a per diem of $65 per person will be compensated for meals. Prior Referenced Response: i EOE-130 Question: (VENDOR TRAVEL) Explain the Company’s travel review process for external vendors to include any assumptions for determining whether mobilization/demobilization travel time would be considered reasonable (i.e. in relation to Google/MapQuest estimates), how estimates would be increased by escalation factors, whether the review process differs for different vendors or types of vendors, and whether the Company has performed a study supporting that policy. Additionally, identify if the Company has changed its position outlined within its supplemental response to OCC-41 from Docket No. 25-12-13. EOE-130 Response: The Company applies the formula described below to determine whether line and vegetation crews can mobilize, travel and arrive on a timeline to assist productively in restoration. The Company uses a formula to calculate daily travel time capability of a line crew traveling at 60 mph for 10 hours (maximum drive time), or approximately 600 miles per day. Based on the expected duration of the restoration, the Company will procure crews factoring in this travel time when validating invoices. The Company looks at the location of mobilization, the 600 miles per day and any external factors that may come into play to determine what is a reasonable travel time when reviewing and approving invoices. Application of the above formula combined with the overall projected impact of the weather event (i.e. duration of restoration, number of potentially impacted states, availability of local or regional resources) enables the Company to determine, on an event by event basis, what travel time is reasonable. Due to size, refueling and possible weather/traffic delays, actual daily mileage of a bucket truck may differ from 600 miles per day. Google Maps is a useful reference point for determining travel time. However, the accuracy and reliability of Google Maps data is subject to qualification in its terms of use, and therefore it should not be relied upon as the exclusive measure of reasonable travel time. In Docket No. 25-12-13 the Company responded to OCC-041 and associated attachments provided here for reference as EOE-130, Attachment 1. Page 2 of OCC-041-SP01, Attachment 1 (which is page 4 of 24 of EOE-130 Attachment 1), is the Google Maps End User Additional Terms of Service (“Google Maps T&Cs”), and states that: “When you use Google Maps map data, traffic, directions, and other content, you may find that actual conditions differ from the map results and content, so exercise your independent judgment and use Google Maps at your own risk.” The Google Maps T&Cs further provide that end users of Google Maps must accept the Google Terms of Service, which is attached hereto as OCC-041-SP01, Attachment 2 (which is page 5 of 24 of EOE130 Attachment 1). Page 13 of OCC-041-SP01, Attachment 2 (which is page 17 of 24 of EOE-130 Attachment 1), presents the following warranty disclaimer: TO THE EXTENT ALLOWED BY APPLICABLE LAW, WE PROVIDE OUR SERVICES “AS IS” WITHOUT ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, AND
  6. Page 37 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-193 Page 3 of 3 NON-INFRINGEMENT. FOR EXAMPLE, WE DON’T MAKE ANY WARRANTIES ABOUT THE CONTENT OR FEATURES OF THE SERVICES, INCLUDING THEIR ACCURACY, RELIABILITY, AVAILABILITY, OR ABILITY TO MEET YOUR NEEDS. DON’T RELY ON THE SERVICES FOR MEDICAL, LEGAL, FINANCIAL, OR OTHER PROFESSIONAL ADVICE. ANY CONTENT REGARDING THOSE TOPICS IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY AND IS NOT A SUBSTITUTE FOR ADVICE FROM A QUALIFIED PROFESSIONAL. As the Company has explained in its response to several discovery responses in Docket Nos. 24-03-30 and 25-12-13, all provided here for ease of reference as EOE-130, Attachment 2 (see, e.g., OCC-031; EOE-501; EOE-517; EOE536; and EOE-0590), Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, lifters, pole trailers, diggers/derricks, etc.) in travel time calculations. Each of these factors can affect the actual time it takes for a contractor to arrive at the contractor’s designated location in the Company’s service territory and, therefore, are appropriate for consideration in the cost validation process. Accordingly, the Company uses the estimated time calculated by Google Maps for car travel as a data point and multiplies that figure by a factor of 1.3 hours to compute a reasonable benchmark for actual travel time. The Company applies the 1.3 hours factor to account for, among other things, the slower speed of fully loaded line trucks that travel as a convoy and make more frequent stops than a conventional sedan vehicle. The Company further evaluates the reasonableness of travel time based on its experience and professional judgment on an event-by-event basis. These additional layers of analysis are necessary because Google Maps does not account for factors and variables that are known to impact travel time. Thus, Google Maps cannot, and should not, be relied upon as the sole measure of travel time.
  7. Page 38 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-194 Page 1 of 3 Date Filed: September 28, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE-TRAVEL) Refer to Exhibit ACCT-2 CLP-1 (rows 159-176 and 178187), and Confidential Exhibits ACCT-2 CLP-1A-2, through CLP-1A-6. The Company reported 28 incremental charges in the combined amount of $982,455 for the Asplundh Tree Expert Co. Each of the charges primarily applied to travel (i.e., mobilization and demobilization) between Connecticut and North Carolina, Kentucky, New Jersey, Virginia, Maryland, or Ohio. Provide an unlocked Excel spreadsheet analyzing the total billable travel hours (i.e., both labor and equipment) for each invoice based on the billed travel time versus the estimated travel time, as included within the supporting documentation (see e.g., Exhibit CLP- 1A-2, p. 156). To the extent that the billed travel hours were in excess of 1.3 times the estimated hours, please provide any contemporaneous documentation that supports the evaluation and approval of the excess billed hours, as well as an estimated cost impact of the excess costs. To assist with this request, EOE offers the following visual but is amenable to other included information. Response: Please refer to the Company’s response to EOE-130 i, which explains that Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, etc.) in travel time calculations. The aforementioned factors and variables are known to impact travel time. The maps are provided as a reference to substantiate the miles and travel time billed and are compiled during the invoice creation process and do not reflect weather/traffic-related delays during the actual mobilization and demobilization process. The associated mobilization and demobilization time was completed during a significant winter storm and travel conditions were poor including heavy, wet snow during mobilization, along with heavy rain and wind during demobilization, which impacted the travel time further.
  8. Page 39 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-194 Page 2 of 3 EOE is requesting a compilation of disparate data that is available to EOE, in the invoices and associated timesheets that pertain to Tree Crew for the MS24A event. The Company’s regulatory requirement is to utilize the timesheets to document the hours worked by each crew, for each vendor, in order to support payment to that vendor. Accordingly, the Company’s processes are constructed to obtain and use those records for validating payment, subject to review and sign off by Eversource Arborist, who has contemporaneous knowledge of the work performed. The Company’s financial systems do not record invoiced amounts by data field, for each data point included on the invoices or the associated timesheets. Therefore, extracting and compiling this information from the timesheets in the manner sought by EOE, would require extensive manual efforts that can be performed by EOE or EOE’s consultant, if Information in that format assists EOE in putting forth its case. Prior Referenced Response: i EOE-130 Question: (VENDOR TRAVEL) Explain the Company’s travel review process for external vendors to include any assumptions for determining whether mobilization/demobilization travel time would be considered reasonable (i.e. in relation to Google/MapQuest estimates), how estimates would be increased by escalation factors, whether the review process differs for different vendors or types of vendors, and whether the Company has performed a study supporting that policy. Additionally, identify if the Company has changed its position outlined within its supplemental response to OCC-41, from Docket No. 25-12-13. EOE-130 Response: The Company applies the formula described below to determine whether line and vegetation crews can mobilize, travel and arrive on a timeline to assist productively in restoration. The Company uses a formula to calculate daily travel time capability of a line crew traveling at 60 mph for 10 hours (maximum drive time), or approximately 600 miles per day. Based on the expected duration of the restoration, the Company will procure crews factoring in this travel time when validating invoices. The Company looks at the location of mobilization, the 600 miles per day and any external factors that may come into play to determine what is a reasonable travel time when reviewing and approving invoices. Application of the above formula combined with the overall projected impact of the weather event (i.e. duration of restoration, number of potentially impacted states, availability of local or regional resources) enables the Company to determine, on an event by event basis, what travel time is reasonable. Due to size, refueling and possible weather/traffic delays, actual daily mileage of a bucket truck may differ from 600 miles per day. Google Maps is a useful reference point for determining travel time. However, the accuracy and reliability of Google Maps data is subject to qualification in its terms of use, and therefore it should not be relied upon as the exclusive measure of reasonable travel time. In Docket No. 25-12-13, the Company responded to OCC-041 and associated attachments provided here for reference as EOE-130, Attachment 1. Page 2 of OCC-041-SP01, Attachment 1 (which is page 4 of 24 of EOE-130 Attachment 1), is the Google Maps End User Additional Terms of Service (“Google Maps
  9. Page 40 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-194 Page 3 of 3 T&Cs”), and states that: “When you use Google Maps map data, traffic, directions, and other content, you may find that actual conditions differ from the map results and content, so exercise your independent judgment and use Google Maps at your own risk.” The Google Maps T&Cs further provide that end users of Google Maps must accept the Google Terms of Service, which is attached hereto as OCC-041-SP01, Attachment 2 (which is page 5 of 24 of EOE130 Attachment 1). Page 13 of OCC-041-SP01, Attachment 2 (which is page 17 of 24 of EOE-130 Attachment 1), presents the following warranty disclaimer: TO THE EXTENT ALLOWED BY APPLICABLE LAW, WE PROVIDE OUR SERVICES “AS IS” WITHOUT ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, AND NON-INFRINGEMENT. FOR EXAMPLE, WE DON’T MAKE ANY WARRANTIES ABOUT THE CONTENT OR FEATURES OF THE SERVICES, INCLUDING THEIR ACCURACY, RELIABILITY, AVAILABILITY, OR ABILITY TO MEET YOUR NEEDS. DON’T RELY ON THE SERVICES FOR MEDICAL, LEGAL, FINANCIAL, OR OTHER PROFESSIONAL ADVICE. ANY CONTENT REGARDING THOSE TOPICS IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY AND IS NOT A SUBSTITUTE FOR ADVICE FROM A QUALIFIED PROFESSIONAL. As the Company has explained in its response to several discovery responses in Docket Nos. 24-03-30, and 25-12-13, all provided here for ease of reference as EOE-130, Attachment 2 (see, e.g., OCC-031; EOE-501; EOE-517; EOE536; and EOE-0590), Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, lifters, pole trailers, diggers/derricks, etc.) in travel time calculations. Each of these factors can affect the actual time it takes for a contractor to arrive at the contractor’s designated location in the Company’s service territory and, therefore, are appropriate for consideration in the cost validation process. Accordingly, the Company uses the estimated time calculated by Google Maps for car travel as a data point and multiplies that figure by a factor of 1.3 hours to compute a reasonable benchmark for actual travel time. The Company applies the 1.3 hours factor to account for, among other things, the slower speed of fully loaded line trucks that travel as a convoy and make more frequent stops than a conventional sedan vehicle. The Company further evaluates the reasonableness of travel time based on its experience and professional judgment on an event-by-event basis. These additional layers of analysis are necessary because Google Maps does not account for factors and variables that are known to impact travel time. Thus, Google Maps cannot, and should not, be relied upon as the sole measure of travel time.
  10. Page 41 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-195 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT2 CLP-1A-7, pp. 234-238. The Company reported an incremental charge of $1,798 for the Certified Utility Services vendor. The invoice and supporting job assignment slips detailed flagging activities from January 8-9, and each detailed the 81214785 workorder in lieu of the MS24A011 workorder number for the current event. Please explain how these services are attributable to the MS24A storm event. Provide all supporting documentation. If these services should not be included in the MS24A storm event, please identify the associated costs that should be removed from the Company’s request. Response: Please refer to Exhibit ACCT-2 (CLP-1) (MS24A), Outside Contractors, lines 213, vendor Certified Utility Services, invoices totaling in the amount of $1,798. Upon further review in drafting this response, the Company determined that these costs are not associated with the event. The Company will supplement ACCT-2 (CLP-1) (MS24A), to remove lines 213 in the amount of $1,798.
2 pages match

As listed on the current system

Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)

This filing on the current system (opens in a new tab)