  1. Page 45 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-199 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-ENVIRONMENTAL) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-8, pp. 16-21. The Company reported an incremental charge of $4,844 for the Clean Harbors Env Services Inc vendor where the documentation detailed the activity as “Manhole Cleanouts” and included an unrelated workorder number (i.e., NTKMAJ11). Explain why a manhole cleanout was a necessary incremental storm expense in lieu of a routine O&M cost. Additionally, explain why a different workorder number was used in lieu of the workorder number for MS24A. Response: Please refer to Exhibit ACCT-2 (CLP-1)(MS24A), Outside Contractors, at Line 223, Clean Harbors Env Services Inc, in amount of $4,844. Manholes are entered only when necessary to perform maintenance activities, planned work, or emergency repairs. As a result, extended periods of time may pass between entries, allowing sludge, dirt, and debris to accumulate from rainwater runoff and snowmelt. Prior to entry, field personnel assess the condition of the manhole and determine whether cleaning is required to ensure safe access and completion of the work. In this instance, storm-related damage resulted in burning and damaged secondary wires that required repair within the manhole. Based on the site assessment, cleaning was determined to be necessary before personnel could safely enter the structure and perform the required repairs. Accordingly, the associated cleaning services were incurred in support of the storm restoration work. The vendor was initially scheduled to support planned underground work activities. However, when the Company transitioned to storm restoration efforts, the vendor was reassigned to provide storm-related support. As a result, the work order reflected on the timesheet corresponded to the originally planned work assignment. Upon receipt and review of the invoice, the work order was updated to accurately reflect the storm restoration services performed by the vendor.
  2. Page 46 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-200 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-8, pp. 22-26. The Company reported three incremental charges in the combined amount of $24,995 for the Coleman Drilling & Blasting Inc vendor. Each of the invoices was billed for hourly activity without signed timesheets or equivalent documents. Provide the relevant signed timesheets supporting the individuals and hours worked. If timesheets were not obtained, explain how the Company was able to validate the validity of the charges Response: Please refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-8, pp. 22-26. During restoration events, the Company relies on drilling contractors to assist with setting poles and installing anchors. Specialized equipment and expertise are required to break through rock or ledge, which can significantly delay progress if not readily available. To minimize outage time, the Company arranged for support from the vendor, ensuring quicker response times. Given the high demand and limited number of these contractors across the Northeast, securing this vendor enables the Company to accelerate restoration efforts and avoid delays caused by waiting for vendor scheduling. These services, when provided, are billed and would not be subject to the timesheet provisions. The Operations Manager responsible for the area where the work was performed and supervised the resources, verified the accuracy of the reported information, and approved the invoice.
  3. Page 47 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-201 Page 1 of 4 Date Filed: September 30, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1, and Confidential Exhibit ACCT-2 CLP-1A-9, pp. 27-125. The Company reported nine incremental charges in the combined amount of $1,607,134 for the Conexus Energy Group LLC vendor. Each of the charges included a significant number of billable hours for travel (i.e., mobilization and demobilization) for both instate and out-of-state crews. Respond to the following: a. Referring to pp. 27-38, as an example, explain why the vendor was permitted to bill for eight hours of mobilization and four hours of demobilization when the vendor was from in-state (i.e., mobilization from Deep River, CT to Windsor Locks, CT). As part of the response, provide emails or other correspondence contemporaneously obtained during the initial review to support the hours billed. b. Referring to pp. 87-90, explain how the vendor was able to bill for seven hours when three of the four Eversource Contractor Storm Daily Time & Work Reports (timesheets) identified a start time of 6:00 a.m. and an end time of 12 p.m. (i.e., total of six hours). To be clear, the demobilization timesheets (i.e., pp. 91-92) report travel starting at 12 p.m. and the fourth timesheet reports an end time of 8 a.m. As part of the response, identify the total monetary impact of the additional hour billed. c. Comparing p. 62, with p. 63 (as an example), confirm that the vendor correctly did not bill for equipment costs during standby as outlined within the contract. If not confirmed, cite the contract provisions that allow for billing of equipment during standby. d. Comparing pp. 66-68, with pp. 56-57 (as an example), explain why the vendor reported two hours of standby within the first timesheet (i.e., pp. 66-68) when they started their first assignment at 8:30 a.m. but the vendor did not record commensurate standby hours for the second timesheet (i.e., pp. 56-57). As part of the response, identify the total monetary impact of the equipment billed for each referenced invoice between the crews’ start time (box 6) to the first assignment (box 24). Response: As an initial matter, the Company notes that there appears to be a typographical error in the question. The question refers to Confidential Exhibit ACCT-2 CLP-1A-9. However, the Company expects that the relevant citation is Confidential Exhibit ACCT-2 CLP-1A-8.
  4. Page 48 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-201 Page 2 of 4 a. During the initial hiring of these crews, this crew was documented as mobilized from Deep River Connecticut. However, the contractor crew was sent from Albany New York. This was discussed and approved post-event by the ERSG lead, who confirmed the crews were mobilized from Albany New York and not Deep River Connecticut. Furthermore, as indicated on the timesheets, the 8 hours of mobilization also included onboarding, meals and obtaining lodging. b. During the invoice review process, the Company identified apparent discrepancies in the invoice details and documentation. In accordance with the dispute resolution process in the contract, the Company’s Procurement and ESRG teams met with the vendor to discuss and further investigate the apparent discrepancies. Based on that meeting and the additional information provided by the vendor, the Company determined that the apparent discrepancy was minor and that there was a reasonable basis to reimburse the vendor for the amount at issue. c. The vendor did not bill for equipment during standby, which was an error on their part. The contractor has the contractual right to bill for equipment during standby. The Company did not correct this error. Please see the Company’s response to EOE-267 i, for additional detail regarding billing for Equipment during Standby. d. The difference between the referenced sets of crews is that one set of crews started the day on standby (pp. 66-68) and the other started on working time (pp 56-57). The Company assigned work for the crews already on work time crews and no immediate assignments to the standby crews so they remained on standby until work was assigned. Refer to subpart (c), regarding equipment costs. Prior Referenced Response: i EOE-267 Question: (LINE CREWS) For each storm in the Company’s recovery request, identify the total amount of equipment that was billed by line crew vendors during standby activities. Please provide the information in an unlocked excel spreadsheet allocating each cost to a specific vendor by storm event. EOE-267 Response: The Company’s accounting system does not separately track amounts billed by vendors for equipment during standby. Accordingly, the Company cannot generate the requested spreadsheet directly from its accounting system to provide the details requested. Information regarding equipment charges is contained within the underlying vendor invoices and supporting documentation submitted as part of the Company’s filing.
  5. Page 49 of 169Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-201 Page 3 of 4 For additional context regarding these charges, the Company’s policy for billing equipment is described below: In the years 2018 through 2023, the Company’s contractual terms provided that standby rates were charged only to labor rates, not to equipment. This policy followed from the fact that, when vendor crews commit to perform work for the Company, their equipment is dedicated for the full duration of the engagement, preventing the use of that equipment somewhere else. This commitment of vendor equipment extends beyond working hours, as vendors must remain ready and available so long as they are committed to the Company’s restoration effort. This policy also reflects the fact that labor rates vary depending on the demands and associated risk placed on the field crews for their performance (i.e., standby rates are lower than work rates), where vendor equipment is tied up regardless of the work status of the vendor’s crews. Specifically, the contract language “Standby Rates apply to labor resources only” was applied so that there was no separate standby rate for equipment and equipment was, instead, billed at the same rate regardless of the crew’s work status (e.g. travel, standby, or work time). The Company’s policy acknowledged that it was paying for exclusive access to the vendor’s equipment throughout the event, compensating vendors for their lost opportunity cost. Not paying for equipment during standby would discourage vendors from committing their resources to the Company in storms with competitive procurement of crews among regional utilities. In January 2022, Eversource Energy received the final report of an independent assessment of the “Eversource ERP Capability,” prepared by Accenture LLC. This assessment was undertaken by Eversource Energy as part of a regulatory compliance initiative beginning in September 2021. In this assessment, Accenture made several recommendations regarding the Eversource Energy ERP organization, including a recommendation to expand the emergency-management organization and capabilities by creating an executive role to oversee the enterprise emergency-management program with greater visibility and decision-making authority within the overall organization. Specifically, Accenture recommended establishing regionally based directors to oversee the implementation of program initiatives and manage state-specific relationships; expanded oversight and governance coordination of risk mitigation and resiliency initiatives; and additional training and exercise design personnel. Over the next two years, Eversource Energy implemented the Accenture recommendations, expanding and formalizing the emergency-management organization with a new vice president role and several new director roles to improve overall emergency-response preparedness and associated business processes. As part of this organizational initiative, Eversource Energy formalized the role of Director of Emergency Preparedness Logistics and Resource Acquisition in late 2023, vesting this role with responsibility for contract services relating to emergency management. This change placed control of vendor contracts in the hands of the team directly responsible for resource acquisition in emergency events. Following this organizational change, the emergency-management team launched a supplier cost-optimization review to identify opportunities for greater cost control in the tough environment of competitive procurement of contract resources. Working together, the Company’s contracts and procurement teams identified the discounting or elimination of equipment charges during standby time as one of several strategies that could help to contain storm restoration costs. The Company began to shift its policy on standby rates for equipment starting in late 2023, working with vendors throughout 2024 to negotiate changes to the former payment policy. This shift in policy applied in various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to
  6. Page 50 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-201 Page 4 of 4 cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors— and containing costs. The Company’s current Master Services Agreement reflects this updated policy.
  7. Page 51 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-202 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-9, pp. 59-85. The Company reported an incremental charge of $590 for the D&D Power LLC vendor. Referring to p. 69, explain how “car vs pole” activity is a relevant incremental charge for the MS24A event. Response: Please refer to Exhibit ACCT-2 CLP-1 (MS24A), Outside Contractors-Vendors, line 240, vendor D&D Power LLC, totaling in the amount of $590. Upon further review in drafting this response, the Company determined that it inadvertently included the charge that is not related to the storm event. The Company will supplement Exhibit ACCT-2 CLP-1 (MS24A) to remove line 240 in the amount of $590.
  8. Page 52 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-203 Page 1 of 2 Date Filed: October 01, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-9, pp. 136-139. The Company reported two incremental charges in the combined amount of $47,132 for the Distinctive Gardens & Tree Care LLC vendor. Respond to the following: a. Referring to p. 136, explain why the mini excavator was required for storm remediation purposes. As part of the response, provide any pre-authorizations from the Eversource arborist. b. Identify if meals were available to the vendor employees during their support of the MS24A event and, if available, explain why the vendor would also be permitted to charge a per diem amount. c. Explain why the supporting documents did not include Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports and provide copies of the reports detailing the assignments. Response: a. During storm response, mini excavators may be used to remove large trunk sections and other woody debris from roadways, when necessary. Mini excavators can improve restoration efficiency. Large-diameter trunk sections that would otherwise require significant time for ground crews to cut, move, and stage manually can often be shifted in minutes, allowing roads to be reopened faster and restoration resources to be deployed to additional outage locations. The Company authorized the use of these services through its storm restoration contractor as part of the overall restoration effort. Because the work was performed to facilitate blocked-road clearing and the safe restoration of electric service, the associated costs were appropriately incurred by the Company as storm remediation expense. b. The vendor was staged at the area work center (“AWC”) and would have appropriately had access to available food; however, meals at the AWC do not always cover all personnel present at the location. Tree crews may be actively working on event restoration activities when meals are provided at the AWC. The time required to break down the tree crew’s worksite and return to the AWC for a meal would not benefit customers or decrease restoration time when utilizing a meal per diem would be more efficient.
  9. Page 53 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-203 Page 2 of 2 c. The Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports may have been missed during the scanning process. The reports cannot be located immediately but may be supplemented as they are located. The Company Arborist reviewed and approved the vendor timesheet as a result of their direct supervision and knowledge of the tree crews working each shift during the restoration process. The Company verifies storm-related work using additional records, including timesheets, dispatch information, and field oversight, and therefore does not rely solely on the Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports for validation purposes.
  10. Page 54 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-204 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-OTHER)Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-9, p. 140. The Company reported an incremental charge of $1,349 for the Eagle Fence & Guard Rail vendor. The charge related to a damaged chain link fence at a substation. Explain if this charge was included in the Company’s capitalization offset for the MS24A event. If not included, explain why the purchase was a necessary incremental storm expense for the MS24A event. Response: The invoice for Eagle Fence and Guard Rail was included in the Company’s incremental storm expense. The charges were for repairs to a substation fence that was damaged due to a tree falling during the storm and damaging the fence surrounding the substation. Since this was a repair to the fence and not a replacement of the fence, it is not a unit of property and therefore appropriated captured as expense and part of the cost of the storm.
2 pages match

As listed on the current system

Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)

This filing on the current system (opens in a new tab)