Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (EOE Set 5 and UCONN Set 2)

Files3

Search terms highlighted
Eversource rate increase is on 11 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
9 pages match
  1. Page 70 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-213 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT2 CLP-1A-10, pp. 64-89. The Company reported an incremental charge of $17,491 for the Extra Duty Solutions vendor. Explain the Company’s practices regarding the engagement of police officers for standby. As part of the response, identify if there are cities, towns, or municipalities that require the use of police officers during storm restoration versus other flagging providers. Response: Many municipalities across Connecticut require the hiring of police officers for traffic control, regardless of the specific work location. Specific to this question, the three towns serviced by the Stamford Area Work Center (AWC) of Stamford, Greenwich, and Darien all require the Company to hire police for traffic control. As the Stamford AWC has the majority of their work in Stamford and Greenwich, they have a standing request to have three police officers in both towns available for use daily.
  2. Page 71 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-214 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-PURCHASED) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-10, p. 95. The Company reported an incremental charge of $954 for the Grainger vendor. The charge related to the purchase of a Fiberglass Ladder and two racks. Explain if this charge was included in the Company’s capitalization offset for the MS24A event. If included, please demonstrate where. If not included, explain why the purchase was a necessary incremental storm expense for the MS24A event and explain if the equipment was available for post-storm usage. Response: Please refer to Exhibit ACCT-2 CLP-1 (MS24A), Outside Contractors- Vendors, line 268, vendor Grainger, invoices totaling in the amount of $954. Upon further review in drafting this response, the Company determined that these costs are not associated with the event. The Company will supplement ACCT-2 CLP-1 (MS24A), to remove lines 268 in the amount of $954.
  3. Page 72 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-215 Page 1 of 1 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-10, pp. 98-99. The Company reported an incremental charge of $1,010 for the H I Stone & Son Trucking Inc vendor. The charge related to the assistance “to stop water” for activity that occurred on February 9, 2024 (one month after the MS24A event) and included a reference to the MS23B011 workorder number. Please explain how this charge was applicable to the MS24A event and provide supporting documentation. If the Company’s response identifies the charge as being applicable to the MS23B event, please provide a similar explanation and supporting documentation. Response: Please refer to Exhibit ACCT-2 (CLP-1)(MS24A), Outside Line Contractors, at Line 270, H I Stone & Son Trucking Inc. (HI Stone), in the amount of $1,010. During the storm event, Connecticut experienced significant rainfall that resulted in localized flooding. As a result of the flooding, water entered the underground electrical infrastructure through the electric conduits and made its way into the handhole and meter box that impacted a customer and as a result. The Company was notified. The condition was not related to a failure of the electrical equipment itself, but rather water entering the conduit system due to the extreme weather conditions. Newtown field operations responded in conjunction with HI Stone to make repairs that included adding a sweep to the conduit and install spray foam in the conduit. This customer issue was addressed as part of post storm follow up work and the charges are applicable to the MS24A event.
  4. Page 73 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-216 Page 1 of 3 Date Filed: October 01, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-10, pp. 102-116. The Company reported an incremental charge of $110,362 for the Harlan Electric Construction vendor. Respond to the following: a. Explain why the Company allowed the vendor to commence billing on January 8, 2024 (6 hours), bill for 16 hours on January 9, 2024, and then bill for another 6 hours prior to being released on January 10, 2024, when there were no assignments provided for the entire duration. As part of the response, explain why the Company did not defer the start of services by a day given that the ERP was not declared until 6PM on January 9, 2024 (Ex. CLP-STORM-IMT-3, p. 29). As relevant, provide documentation (i.e., emails, etc.) supporting the Company’s response, to include Company emails identifying when the vendor was expected to be available for storm recovery purposes. b. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). EOE observed that the contract provided at OCC-044, Att.2 (Confidential), starting at p. 2286 includes a List of Exhibits at p. 2292 which references the Pricing Schedule as Exhibit B but was unable to locate the document. EOE observed a similar omission in EOE-024, Att.4 (Confidential). To be clear, EOE is looking for the template language, not the individual rates. c. Referring to pp. 107-114, explain why the equipment was charged during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount ($) of equipment that was charged for standby. Response: Referring to Exhibit ACCT-2 CLP-1 (MS24A), Outside Contractor-Vendor, line 272, vendor Harlan Electric Construction, total invoice amount of $110,362. a. Harlan was already working on property for Transmission. They were held onsite and transitioned to storm duty from their normal scheduled work. The crews were instructed to pick up Eversource trucks staged at another location and outfit them with appropriate materials for storm restoration on the 8th and to standby on the 9th. Since they were normally on property, all communications were verbal and they were not released to ensure that the resources were available when needed.
  5. Page 74 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-216 Page 2 of 3 b. The Company confirms that, due to a clerical error during the submission process, the vendor’s contractual Exhibit B Pricing Schedule was inadvertently omitted from the materials provided at OCC-044, Attachment 2 CONFIDENTIAL. The Exhibit B Pricing Schedule is now provided as EOE-216, Attachment 1 CONFIDENTIAL. c. Under the applicable Master Service Agreement, the contractor is entitled to receive payment for equipment at 50% of the applicable equipment rate while the contractor is on standby, as expressly provided in OCC-044, Attachment 2 CONFIDENTIAL, Section 3.6, page 5 of EOE-216, Attachment 1, (Exhibit B Pricing Schedule). Accordingly, the equipment charges during standby were billed pursuant to the specific standby provisions contained in the vendor’s contractual Pricing Schedule. In accordance with contract provisions, the total amount of equipment charged for standby is $5,714.28. Please refer to the Company response to EOE-267 i for additional context and detail regarding the billing of equipment. Prior Referenced Response: i EOE-267 Question: (LINE CREWS) For each storm in the Company’s recovery request, identify the total amount of equipment that was billed by line crew vendors during standby activities. Please provide the information in an unlocked excel spreadsheet allocating each cost to a specific vendor by storm event. EOE-267 Response: There is no contractual, operational or other prohibition that bars the payment of equipment rates during standby time and these costs are not tracked separately from a vendor’s crew time for invoicing purposes. Information regarding equipment charges is contained within the underlying vendor invoices and supporting documentation submitted as part of the Company’s filing. The Company has consistently explained that, in the years 2018 through 2023, the Company’s contractual terms provided that standby rates were charged only to labor rates, not to equipment. This policy followed from the fact that, when vendor crews commit to perform work for the Company, their equipment is dedicated for the duration of the engagement, preventing the use of that equipment somewhere else. This commitment of vendor equipment extends beyond working hours, as vendors must remain ready and available so long as they are committed to the Company’s restoration effort. This policy also reflects the fact that labor rates vary depending on the demands and associated risk placed on the field crews for their performance (i.e., standby rates are lower than work rates), where vendor equipment is tied up regardless of the work status of the vendor’s crews. Specifically, the contract language “Standby Rates apply to labor resources only” was applied so that there was no separate standby rate for equipment and equipment was, instead, billed at the same rate regardless of the crew’s work status (e.g. travel, standby, or work time). The Company’s policy acknowledged that it was paying for exclusive access to the vendor’s equipment throughout the event, compensating vendors for their lost opportunity cost. Not paying for
  6. Page 75 of 169Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-216 Page 3 of 3 equipment during standby would discourage vendors from committing their resources to the Company in storms with competitive procurement of crews among regional utilities. In January 2022, Eversource Energy received the final report of an independent assessment of the “Eversource ERP Capability,” prepared by Accenture LLC. This assessment was undertaken by Eversource Energy as part of a regulatory compliance initiative beginning in September 2021. In this assessment, Accenture made several recommendations regarding the Eversource Energy ERP organization, including a recommendation to expand the emergency-management organization and capabilities by creating an executive role to oversee the enterprise emergency-management program with greater visibility and decision-making authority within the overall organization. Specifically, Accenture recommended establishing regionally based directors to oversee the implementation of program initiatives and manage state-specific relationships; expanded oversight and governance coordination of risk mitigation and resiliency initiatives; and additional training and exercise design personnel. Over the next two years, Eversource Energy implemented the Accenture recommendations, expanding and formalizing the emergency-management organization with a new vice president role and several new director roles to improve overall emergency-response preparedness and associated business processes. As part of this organizational initiative, Eversource Energy formalized the role of Director of Emergency Preparedness Logistics and Resource Acquisition in late 2023, vesting this role with responsibility for contract services relating to emergency management. This change placed control of vendor contracts in the hands of the team directly responsible for resource acquisition in emergency events. Following this organizational change, the emergency-management team launched a supplier cost-optimization review to identify opportunities for greater cost control in the tough environment of competitive procurement of contract resources. Working together, the Company’s contracts and procurement teams identified the discounting or elimination of equipment charges during standby time as one of several strategies that could help to contain storm restoration costs. The Company began to shift its policy on standby rates for equipment starting in late 2023, working with vendors throughout 2024 to negotiate changes to the former payment policy. This shift in policy applied in various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a standard policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors—and containing costs. The Company’s current Master Services Agreement reflects this updated policy.
  7. Page 76 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-217 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-10, pp. 117-131. The Company reported an incremental charge of $3,686 for the Haugland Energy Group LLC vendor for activity referenced as ‘Dock Work’ and reported the activity under workorder number MS24J011 (pp. 117, 129-130). The Company’s documentation did not include an Eversource Contractor Storm Daily Time & Work Report or similar exhibit detailing the information outlined for the storm remediation. Provide the omitted Eversource Contractor Storm Daily Time & Work Report or explain why the document was not completed. Additionally, explain how the Eversource reviewer was able to verify the applicability of the charges to the MS24A event and provide supporting documentation. Response: Please refer to Exhibit ACCT-2 (CLP-1)(MS24A), Outside Line Contractors, at Line 273, Haugland Energy Group LLC, in the amount of $3,686. The charges are associated with poststorm repair activities related to the MS24A event. The timesheets provided are the contractor's standard format for work performed outside the ERP timeframe. As part of the invoice review process, associated work orders are reviewed to verify the accuracy and appropriateness of the charges. Documentation of this review process was included in Confidential Exhibit ACCT-2 CLP-1A-10, page 131. During the review, the employee responsible for overseeing the work performed by Haugland Energy Group provided clarification regarding the appropriate work order to be used for the invoice. This clarification was incorporated into the review to ensure the charges were applied to the correct work order.
  8. Page 77 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-218 Page 1 of 1 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-FOOD/LODGING) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-10, pp. 132-134. The Company reported an incremental charge of $66,863 for the Haugland Energy Group LLC vendor. The Company failed to provide any supporting documentation for the activity performed to include the signed Eversource Contractor Storm Daily Time & Work Reports, provide the omitted documentation. Response: Please refer to Exhibit ACCT-2 CLP-1 (MS24A), Outside Contractor-Vendor, Line 274, vendor Haugland Energy Group LLC, invoice totaling in the amount of $66,863. Please reference EOE218, Attachment 1, for supporting documentations of signed Eversource Contractor Storm Daily time and work timesheets.
  9. Page 78 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-219 Page 1 of 2 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-10, pp. 158-162. The Company reported an incremental charge of $99,735 for the HTExit 88 Hotel TRS LLC vendor (i.e., Marriott Mystic). The charges included 185 hotel rooms for the evening of January 11, 2024 and 185 “Breakfast & Box Lunch” meals for January 12, 2024. Identify if all of the referenced rooms and meals were utilized, and if so, by which vendor(s). If not used, identify the number of rooms and meals that were unused and explain why they were not canceled. Response: Please refer to Exhibit ACCT-2 CLP-1A-10 (MS24A), pp 158-162, Marriott Mystic, for lodging and meal charges of $99,735. Under the Company’s ERP for a severe weather event, resource and logistical acquisitions such as hotel rooms and food must be undertaken ahead of time based on the expected severity and complexity of an event. Expected complexity and the associated resource and logistical requirements are analyzed based on considerations of numerous factors including, but not limited to, forecasted weather conditions; certainty of the weather forecast, size of the anticipated incident and expected impacts to personal safety and property, outage prediction modeling, anticipated extent of potential or known damage, and historical experience with other events. The Company cannot wait until a predicted weather event actually reaches its service territory to formulate its response plan and secure needed resources, as PURA has established pursuant to Conn Gen. St. §§16-32e, 16-32h and PURA’s performance standards, as well as the structure and implementation of the ERP. If the Company were to wait until a storm’s actual impact to secure mutual aid and contractor crews, hotels, food services and other logistics necessities, critical resources may not be available when needed, or, even if available, would be significantly more expensive than if procured earlier. The Company makes every effort to cancel rooms that are unused if known within the timeframe for allowed cancellation according to the hotel policy. However, based on the shifting restoration needs or priorities, crews are often relocated within regions of the service territory to work on restoration well after the cancellation period has expired and may have to be re-assigned to other
  10. Page 79 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-219 Page 2 of 2 hotel rooms that are closer to their physical work location (the Company focuses on locating crews as close as possible to their assigned restoration jobs to minimize the need for travel, thus freeing them up for actual restoration work). The Company must meet its contractual obligations with each hotel to pay for rooms reserved post the cancellation time frame. It is also important to note that, in times of service outages, there are other demands on hotel space from displaced residents that are experiencing service outages. As a result, the Company needs to be able to have adequate facilities to house the crews that are required to be on-site at the outset of an event, and the Company does that through contractual and logistical commitments made ahead of the event. The Company tracks rooms that are booked and assigned, not whether a crew ends up utilizing its assigned room because the Company is focused on moving crews to where the work location as the first priority and information as to whether the room was used is not probative, since it must be paid for. In preparation for the storm event, the Company had booked rooms at the Marriott Mystic for Wednesday, January 10, 2024 and Thursday, January 11, 2024 nights and ordered all meals. Due to changes in food and lodging needs for the storm event, the Company did not require rooms and meals. The cancellation notification was sent via email on Wednesday, January 10, 2024, at 2:19pm. Due to a guarantee on the rooms and the ordered food, the Company incurred charges for the cancelled rooms and the cost of the ordered food.
2 pages match

As listed on the current system

Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)

This filing on the current system (opens in a new tab)