Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (EOE Set 5 and UCONN Set 2)

Files3

Search terms highlighted
Eversource rate increase is on 11 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
9 pages match
  1. Page 80 of 169Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-220 Page 1 of 3 Date Filed: September 30, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-11, pp. 12-86. The Company reported an incremental charge of $1,534,662 for the I B Abel Inc vendor. Respond to the following: a. Referring to pp. 23-41, explain why the billable hours for Travel Time in box 7 were lowered and the billable hours for Standby Time in box 8 were increased. As part of the response, identify when this correction occurred in the review process and explain how the hours were derived. b. Referring to OCC-044, Att.2 (Confidential), pp. 2732-2734, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 2732). c. If subsection b is confirmed, refer to pp. 23-62 and explain why the equipment was charged during standby. Additionally, identify the amount ($) of equipment that was charged for standby. d. If subsection b is not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that excludes the standard provisions. Response: a. During the invoice-review process, the Company identified discrepancies noted within the billable hours. As a result, the appropriate Eversource teams and the Contractor engaged in a discussion resulting in the acceptable and agreed-upon hours. b. The standard Exhibit A Pricing Schedule contains this provision as noted. However, the provision does not govern equipment charges, as discussed in the Company’s response to EOE-267 i. At the time of the storm event, the contractor was on the Company’s system performing work pursuant to a blue-sky work assignment. When the storm event occurred, the contractor transitioned its resources to support the storm-related work. The standby occurred at the beginning of the contractor’s storm work activity, as the contractor did not immediately transition from its ongoing blue-sky work to storm duty. Thus, the total amount of $67,736.35 was correctly charged for equipment hours for standby. In addition, the same equipment rate would apply for standby even under the blue-sky contract. Accordingly, the equipment charges are correct.
  2. Page 81 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-220 Page 2 of 3 c. Please see response to part (b) d. Please see response to part (b) Prior Referenced Response: i EOE-267 Question: (LINE CREWS) For each storm in the Company’s recovery request, identify the total amount of equipment that was billed by line crew vendors during standby activities. Please provide the information in an unlocked excel spreadsheet allocating each cost to a specific vendor by storm event. EOE-267 Response: The Company’s accounting system does not separately track amounts billed by vendors for equipment during standby. Accordingly, the Company cannot generate the requested spreadsheet directly from its accounting system to provide the details requested. Information regarding equipment charges is contained within the underlying vendor invoices and supporting documentation submitted as part of the Company’s filing. For additional context regarding these charges, the Company’s policy for billing equipment is described below: In the years 2018 through 2023, the Company’s contractual terms provided that standby rates were charged only to labor rates, not to equipment. This policy followed from the fact that, when vendor crews commit to perform work for the Company, their equipment is dedicated for the full duration of the engagement, preventing the use of that equipment somewhere else. This commitment of vendor equipment extends beyond working hours, as vendors must remain ready and available so long as they are committed to the Company’s restoration effort. This policy also reflects the fact that labor rates vary depending on the demands and associated risk placed on the field crews for their performance (i.e., standby rates are lower than work rates), where vendor equipment is tied up regardless of the work status of the vendor’s crews. Specifically, the contract language “Standby Rates apply to labor resources only” was applied so that there was no separate standby rate for equipment and equipment was, instead, billed at the same rate regardless of the crew’s work status (e.g. travel, standby, or work time). The Company’s policy acknowledged that it was paying for exclusive access to the vendor’s equipment throughout the event, compensating vendors for their lost opportunity cost. Not paying for equipment during standby would discourage vendors from committing their resources to the Company in storms with competitive procurement of crews among regional utilities. In January 2022, Eversource Energy received the final report of an independent assessment of the “Eversource ERP Capability,” prepared by Accenture LLC. This assessment was undertaken by Eversource Energy as part of a regulatory compliance initiative beginning in September 2021. In this assessment, Accenture made several recommendations regarding the Eversource Energy ERP organization, including a recommendation to expand the emergency-management organization and capabilities by creating an executive role to oversee the enterprise emergency-management program with greater visibility and decision-making authority within the overall organization. Specifically, Accenture recommended establishing regionally based directors to oversee the implementation of program initiatives and manage state-specific relationships; expanded oversight and governance coordination of risk mitigation and resiliency initiatives; and additional training and exercise design personnel.
  3. Page 82 of 169Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-220 Page 3 of 3 Over the next two years, Eversource Energy implemented the Accenture recommendations, expanding and formalizing the emergency-management organization with a new vice president role and several new director roles to improve overall emergency-response preparedness and associated business processes. As part of this organizational initiative, Eversource Energy formalized the role of Director of Emergency Preparedness Logistics and Resource Acquisition in late 2023, vesting this role with responsibility for contract services relating to emergency management. This change placed control of vendor contracts in the hands of the team directly responsible for resource acquisition in emergency events. Following this organizational change, the emergency-management team launched a supplier cost-optimization review to identify opportunities for greater cost control in the tough environment of competitive procurement of contract resources. Working together, the Company’s contracts and procurement teams identified the discounting or elimination of equipment charges during standby time as one of several strategies that could help to contain storm restoration costs. The Company began to shift its policy on standby rates for equipment starting in late 2023, working with vendors throughout 2024 to negotiate changes to the former payment policy. This shift in policy applied in various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors— and containing costs. The Company’s current Master Services Agreement reflects this updated policy.
  4. Page 83 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-221 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-SERVICE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-11, pp. 94-98. The Company reported an incremental charge of $12,176 for the JHD Corp vendor. The invoice referenced a project of “2023-2024 CT Access Road & ROW Trans. Maint. Services (p. 94). Respond to the following: a. Identify if the storm-related services were associated with the transmission or distribution system. b. If response to subsection a is the distribution system, explain the specific storm-related services that were performed in support of the Eversource distribution system and provide supporting documentation. c. If response to subsection a is the transmission system, explain why services associated with the transmission system were included in the storm recovery request. Response: Please refer to Exhibit ACCT-2 (MS24A) Outside Contractors-Vendors, line, vendor JHD CORP, line 287, invoice totaling in the amount of $12,176. Upon further review in drafting this response, the Company determined that this invoice was related to the repair of a Transmission Right of Way. The right of way washed out and was responded to after a call from the town requesting assistance. The wash out was blocking the road where the Company has distribution lines but given the repair was made to a transmission right of way, the Company will supplement Exhibit ACCT-2 (MS24A) to remove line 287 in the amount of $12,176.
  5. Page 84 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-222 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-11, p. 109. The Company reported an incremental charge of $18,776 for the KTI Utility Construction & Maintenance LLC vendor. The invoice referenced activity from both workorder number MS24A011 and MS24B011. Explain why the Company allocated the full amount of the invoice in lieu of allocating applicable charges to the MS24B storm event. As part of the response, identify the amount applicable to the MS24B event. Response: Please refer to Exhibit ACCT-2 (CLP-1)(MS24A), Outside Line Contractors, at Line 293, KTI Utility Construction & Maintenance LLC, in the amount of $18,766. While preparing the data for this response, it was determined that this invoice reflects work associated with MS24A and MS24B. The Company will supplement Exhibit CLP-1 (MS24A) to adjust line 293 to the amount of $11,140. In addition, the Company will supplement Exhibit CLP2 (MS24B) to include this invoice in the amount of $7,636.
  6. Page 85 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-223 Page 1 of 2 Date Filed: October 01, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibits ACCT-2 CLP-1A-11 through CLP-1A-16. The Company reported 141 incremental charges for the Lewis Tree Service Inc vendor with approximately 43 invoices where it appears that the vendor failed to bill the required hours at ST rates. Respond to the following: a. Explain why the vendor was not required to bill at ST rates for the hours billed through 1630. b. Explain why the vendor was permitted to bill for an entire hour short of the 1630 timeline and failed to account for nine hours of ST. (see e.g., Rows 329, 369- 378). c. Provide an unlocked Excel spreadsheet detailing each invoice referenced above (i.e., the referenced Rows) and identify the total number of hours billed at OT rates through 1630, along with the corresponding incremental charge. To be clear, this request is looking for the differential between the OT rate and ST rate multiplied by the hours billed. Response: a. Please refer to the Company’s response to EOE-128 i and EOE-128, Attachment 1. The normal working hours for tree crews are 7:00 AM to 4:30 PM (or, stated differently, 07:00 to 16:30) and the tree crews are paid nine hours of straight time for time worked during these hours, up to the first 45 working hours, with a 30-minute unpaid meal break. The 30minute unpaid meal break is in accordance with CT G.S. Chapter 557 Section 31-51ii Subsection A, which states: “No person shall be required to work for seven and one-half or more consecutive hours without a period of at least thirty consecutive minutes for a meal. Such period shall be given at some time after the first two hours of work and before the last two hours.” The period is unpaid in accordance with the Fair Labor Standards Act, which states: “Federal law does not require lunch or coffee breaks… Meal periods (typically lasting at least 30 minutes), serve a different purpose than coffee or snack breaks and, thus, are not work time and are not compensable.” The storm working hours are from 7:00 AM to 4:00 PM (or, stated differently, 07:00 to 16:00). This is due to the fact that a 30-minute, undisturbed, break cannot be guaranteed during storm response activities and duties, in accordance with CT G.S. Chapter 557 Section 31-51ii Subsection C Part 4, which states: “the continuous nature of an employer's operations, such as chemical production or research experiments, requires that employees
  7. Page 86 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-223 Page 2 of 2 be available to respond to urgent or unusual conditions at all times and such employees are compensated for break and meal periods.” The distinction between normal working hours, 7:00 AM to 4:30 PM, and storm working hours, 7:00 AM to 4:00 PM, is due to the continuous nature of the Company’s storm response activities and the statutory requirement to compensate employees for their meal period when they are required to respond to urgent or unusual conditions at all times. b. The vendor is not permitted to charge OT during the storm working hours, from 07:00 to 16:00. Referring to Exhibit ACCT-2 CLP-1 and Confidential Exhibits ACCT-2 (CLP-1A11)(MS24A) through ACCT-2 (CLP-1A-16)(MS24A), the Company reviewed all Lewis Tree Service Inc. invoices and found eleven discrepancies that occurred due to human error. c. Please refer to EOE-223, Attachment 1 CONFIDENTIAL, for an unlocked spreadsheet calculating the differential between the OT and ST rate multiplied by the number of hours billed at the OT rate from 07:00 through 16:00, totaling $419.44. The Company will supplement Exhibit ACCT-2 (CLP-01) (MS24A) to remove $419. Prior Referenced Response: i EOE-128 Question: (VEGETATION CREW HOURS) Confirm whether each tree crew vendor’s contractual “normal working hours” remain 7 AM to 4:30 PM (i.e., 0700 to 1630) for each weekday, or a maximum of 9 hours. As part of the response, identify each tree crew vendor and cite the contract provisions that detail these hours. If the contracts do not detail the normal working hours, please provide email or other communications supporting the normal working hours that would bill at standard time (ST) rates. EOE-128 Response: The normal working hours for local tree crews are confirmed as 7 AM to 4:30 PM (or, stated differently, 07:00 to 16:30) and the tree crews are paid nine hours of straight time for time worked during these hours, up to the first 45 working hours, with a 30-minute unpaid meal break. This language is not included in contract provisions, rather it is a department practice. Please refer to EOE-128, Attachment 1, for the Eversource Contractor Tree Crew Work Schedule.
  8. Page 87 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-224 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-11, pp. 252-254. The Company reported an incremental charge of $7,002 for the Lewis Tree Service Inc vendor. Explain why the vendor was necessary for January 11, 2024 when the storm was demobilized on January 10, 2024, the crew had only performed standby activity on both January 9th and 10th, and the crew was only used for standby on January 11th (p. 254). As part of the response, please identify the incremental charge associated with the standby activity on January 11th. Response: Throughout a storm event, Vegetation Management and Operations stay in close communication to ensure tree crew resources are appropriate. In many storm events tree crew counts are decreased gradually, rather than occurring all at once. Demobilization of tree crews is paired with demobilization of line crew resources and the number of outage events remaining per AWC or division. Even when customers are substantially restored from a storm event, there are often remaining outage and non-outage Outage Management System (“OMS”) tickets that need to be addressed. It is not uncommon for Operations to request that tree crews remain on shift to address any remaining vegetation related work or to support line crews as needed. Once released from the storm shift and sent home to rest, it will take longer for tree crew personnel to travel in and respond. The decision to keep tree crews on shift is made by Operations leadership based on the state of OMS tickets regionally or by area work center. The Company does not track time differently between standby and work time for tree crews in the same manner as line crews. There are no separate billing rates or work designations for vegetation management crews that would differentiate standby and remediation work. Contracts with tree contractors do not differentiate standby time or billing rates as is typical with line crew contracts. The term “standby” on a tree crew timesheet indicates that the crew was assigned a storm shift and was actively ready to respond to events. The charge associated with the work time on January 11, 2024, was $1,795.27.
  9. Page 88 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-225 Page 1 of 4 Date Filed: October 01, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibits CLP-1A13 through CLP-1A-14. The Company reported 17 incremental charges for the Lewis Tree Service Inc vendor for crews that traveled from Maryland for a total cost of $229,350 (Rows: 332-346, 348, and 351). Respond to the following: a. Explain why the vendor commenced travel on January 8, 2024, from Baltimore Maryland when the storm was not anticipated to impact the state until the afternoon of January 9, 2024. b. Provide an unlocked Excel spreadsheet calculating the incremental cost impact for the vendor’s billing of seven hours of standby on January 9, 2024, for both labor and equipment. c. Explain why the vendor was permitted to bill for 12 hours of travel on January 8, 2024 (mobilization) and 12 hours on January 11, 2024 (demobilization) when the vendor’s own documentation demonstrates that they took a longer distance (i.e., 346 miles) which only required 5 hours, 45 minutes (see e.g., Ex. CLP-1A-13 p. 40), or less than 7.5 hours after applying a 1.3 factor increase. d. Provide an unlocked Excel spreadsheet calculating the incremental cost impact for the vendor’s billing of nine hours (i.e., the additional 4.5 hours of both mobilization and demobilization) for both labor and equipment. e. Cite the contract provisions that permit the vendor to bill for both mileage and for vehicle usage during mobilization and demobilization. If not defined within the contract, explain why the vendor was permitted to bill for both costs. Response: a. In accordance with the Final Order issued in Docket No. 20-08-03, the Company is required to pursue and secure resources as soon as possible to ensure it has the necessary resources well in advance of storm events. However, this can become challenging during events that are regional in nature where other utilities are competing for additional crews. To overcome this obstacle, the Company must negotiate with external vendors to guarantee their support to the Company over other utilities in the region. Therefore, the Company may agree to compensation leading up to the anticipated storm event to acquire resource commitments.
  10. Page 89 of 169Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-225 Page 2 of 4 The forecast for the January 9-10, 2024, winter storm event indicated heavy snow, rain, flooding, and high winds to the Company’s service territory and, more broadly, New England and the surrounding Northeastern region. Given several other states were actively looking for additional support from external tree crews, the Company needed to aggressively engage tree crew vendors in advance of the storm impacting Connecticut. The Company verbally agreed to reimburse the vendor for a portion of their time on January 9th, 2024, in advance of the crews being deployed to CT in order to acquire the extra resources to respond to the winter event projections. b. Please refer to EOE-225, Attachment 1 CONFIDENTIAL, for the requested labor and equipment calculations. c. Please refer to the Company’s response to EOE-130 i, which explains that Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, etc.) in travel time calculations. The aforementioned factors and variables are known to impact travel time. The maps are provided as a reference to substantiate the miles and travel time billed and are compiled during the invoice creation process and do not reflect weather/traffic-related delays during the actual mobilization and demobilization process. d. The equipment rate was not billed during mobilization and demobilization. Please refer to EOE-225, Attachment 2 CONFIDENTIAL, for the requested labor calculations. e. The vendor was not permitted to bill for both mileage and equipment rates during mobilization or demobilization. The vendor charged mileage during mobilization and demobilization and charged equipment rates while operating in the Company’s service territory. Prior Referenced Response: i EOE-130 Question: (VENDOR TRAVEL) Explain the Company’s travel review process for external vendors to include any assumptions for determining whether mobilization/demobilization travel time would be considered reasonable (i.e. in relation to Google/MapQuest estimates), how estimates would be increased by escalation factors, whether the review process differs for different vendors or types of vendors, and whether the Company has performed a study supporting that policy. Additionally, identify if the Company has changed its position outlined within its supplemental response to OCC-41 from Docket No. 25-12-13.
2 pages match

As listed on the current system

Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)

This filing on the current system (opens in a new tab)