Discovery Compilation (EOE Set 5 and UCONN Set 2)
Files3
Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
EOE Set 5_COMBINED.pdf
PDF · 1.3 MB · 169 pagesText searchable
Download EOE Set 5_COMBINED.pdfRead the text of EOE Set 5_COMBINED.pdf
UCONN Set 2_COMBINED.pdf
PDF · 372 KB · 19 pagesText searchable
Download UCONN Set 2_COMBINED.pdfRead the text of UCONN Set 2_COMBINED.pdf
Page 88 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-225 Page 1 of 4 Date Filed: October 01, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibits CLP-1A13 through CLP-1A-14. The Company reported 17 incremental charges for the Lewis Tree Service Inc vendor for crews that traveled from Maryland for a total cost of $229,350 (Rows: 332-346, 348, and 351). Respond to the following: a. Explain why the vendor commenced travel on January 8, 2024, from Baltimore Maryland when the storm was not anticipated to impact the state until the afternoon of January 9, 2024. b. Provide an unlocked Excel spreadsheet calculating the incremental cost impact for the vendor’s billing of seven hours of standby on January 9, 2024, for both labor and equipment. c. Explain why the vendor was permitted to bill for 12 hours of travel on January 8, 2024 (mobilization) and 12 hours on January 11, 2024 (demobilization) when the vendor’s own documentation demonstrates that they took a longer distance (i.e., 346 miles) which only required 5 hours, 45 minutes (see e.g., Ex. CLP-1A-13 p. 40), or less than 7.5 hours after applying a 1.3 factor increase. d. Provide an unlocked Excel spreadsheet calculating the incremental cost impact for the vendor’s billing of nine hours (i.e., the additional 4.5 hours of both mobilization and demobilization) for both labor and equipment. e. Cite the contract provisions that permit the vendor to bill for both mileage and for vehicle usage during mobilization and demobilization. If not defined within the contract, explain why the vendor was permitted to bill for both costs. Response: a. In accordance with the Final Order issued in Docket No. 20-08-03, the Company is required to pursue and secure resources as soon as possible to ensure it has the necessary resources well in advance of storm events. However, this can become challenging during events that are regional in nature where other utilities are competing for additional crews. To overcome this obstacle, the Company must negotiate with external vendors to guarantee their support to the Company over other utilities in the region. Therefore, the Company may agree to compensation leading up to the anticipated storm event to acquire resource commitments.Page 89 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-225 Page 2 of 4 The forecast for the January 9-10, 2024, winter storm event indicated heavy snow, rain, flooding, and high winds to the Company’s service territory and, more broadly, New England and the surrounding Northeastern region. Given several other states were actively looking for additional support from external tree crews, the Company needed to aggressively engage tree crew vendors in advance of the storm impacting Connecticut. The Company verbally agreed to reimburse the vendor for a portion of their time on January 9th, 2024, in advance of the crews being deployed to CT in order to acquire the extra resources to respond to the winter event projections. b. Please refer to EOE-225, Attachment 1 CONFIDENTIAL, for the requested labor and equipment calculations. c. Please refer to the Company’s response to EOE-130 i, which explains that Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, etc.) in travel time calculations. The aforementioned factors and variables are known to impact travel time. The maps are provided as a reference to substantiate the miles and travel time billed and are compiled during the invoice creation process and do not reflect weather/traffic-related delays during the actual mobilization and demobilization process. d. The equipment rate was not billed during mobilization and demobilization. Please refer to EOE-225, Attachment 2 CONFIDENTIAL, for the requested labor calculations. e. The vendor was not permitted to bill for both mileage and equipment rates during mobilization or demobilization. The vendor charged mileage during mobilization and demobilization and charged equipment rates while operating in the Company’s service territory. Prior Referenced Response: i EOE-130 Question: (VENDOR TRAVEL) Explain the Company’s travel review process for external vendors to include any assumptions for determining whether mobilization/demobilization travel time would be considered reasonable (i.e. in relation to Google/MapQuest estimates), how estimates would be increased by escalation factors, whether the review process differs for different vendors or types of vendors, and whether the Company has performed a study supporting that policy. Additionally, identify if the Company has changed its position outlined within its supplemental response to OCC-41 from Docket No. 25-12-13.Page 90 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-225 Page 3 of 4 EOE-130 Response: The Company applies the formula described below to determine whether line and vegetation crews can mobilize, travel and arrive on a timeline to assist productively in restoration. The Company uses a formula to calculate daily travel time capability of a line crew traveling at 60 mph for 10 hours (maximum drive time), or approximately 600 miles per day. Based on the expected duration of the restoration, the Company will procure crews factoring in this travel time when validating invoices. The Company looks at the location of mobilization, the 600 miles per day and any external factors that may come into play to determine what is a reasonable travel time when reviewing and approving invoices. Application of the above formula combined with the overall projected impact of the weather event (i.e. duration of restoration, number of potentially impacted states, availability of local or regional resources) enables the Company to determine, on an event by event basis, what travel time is reasonable. Due to size, refueling and possible weather/traffic delays, actual daily mileage of a bucket truck may differ from 600 miles per day. Google Maps is a useful reference point for determining travel time. However, the accuracy and reliability of Google Maps data is subject to qualification in its terms of use, and therefore it should not be relied upon as the exclusive measure of reasonable travel time. In Docket No. 25-12-13 the Company responded to OCC-041 and associated attachments provided here for reference as EOE-130, Attachment 1. Page 2 of OCC-041-SP01, Attachment 1, (which is page 4 of 24 of EOE-130, Attachment 1), is the Google Maps End User Additional Terms of Service (“Google Maps T&Cs”), and states that: “When you use Google Maps map data, traffic, directions, and other content, you may find that actual conditions differ from the map results and content, so exercise your independent judgment and use Google Maps at your own risk.” The Google Maps T&Cs further provide that end users of Google Maps must accept the Google Terms of Service, which is attached hereto as OCC-041-SP01, Attachment 2, (which is page 5 of 24 of EOE-130, Attachment 1). Page 13 of OCC-041-SP01, Attachment 2, (which is page 17 of 24 of EOE-130, Attachment 1), presents the following warranty disclaimer: TO THE EXTENT ALLOWED BY APPLICABLE LAW, WE PROVIDE OUR SERVICES “AS IS” WITHOUT ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, AND NON-INFRINGEMENT. FOR EXAMPLE, WE DON’T MAKE ANY WARRANTIES ABOUT THE CONTENT OR FEATURES OF THE SERVICES, INCLUDING THEIR ACCURACY, RELIABILITY, AVAILABILITY, OR ABILITY TO MEET YOUR NEEDS. DON’T RELY ON THE SERVICES FOR MEDICAL, LEGAL, FINANCIAL, OR OTHER PROFESSIONAL ADVICE. ANY CONTENT REGARDING THOSE TOPICS IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY AND IS NOT A SUBSTITUTE FOR ADVICE FROM A QUALIFIED PROFESSIONAL. As the Company has explained in its response to several discovery responses in Docket Nos. 24-03-30 and 25-12-13, all provided here for ease of reference as EOE-130, Attachment 2, (see, e.g., OCC-031; EOE-501; EOE-517; EOE536; and EOE-0590), Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, lifters, pole trailers, diggers/derricks,Page 91 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-225 Page 4 of 4 etc.) in travel time calculations. Each of these factors can affect the actual time it takes for a contractor to arrive at the contractor’s designated location in the Company’s service territory and, therefore, are appropriate for consideration in the cost validation process. Accordingly, the Company uses the estimated time calculated by Google Maps for car travel as a data point and multiplies that figure by a factor of 1.3 hours to compute a reasonable benchmark for actual travel time. The Company applies the 1.3 hours factor to account for, among other things, the slower speed of fully loaded line trucks that travel as a convoy and make more frequent stops than a conventional sedan vehicle. The Company further evaluates the reasonableness of travel time based on its experience and professional judgment on an event-by-event basis. These additional layers of analysis are necessary because Google Maps does not account for factors and variables that are known to impact travel time. Thus, Google Maps cannot, and should not, be relied upon as the sole measure of travel time.Page 92 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-226 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-15, pp. 1-3. The Company reported an incremental charge of $6,216 for the Lewis Tree Service Inc vendor. Explain why the vendor was necessary for January 11, 2024 when the storm was demobilized on January 10, 2024, the crew had only performed standby activity on both January 9th and 10th, and the crew was only used for standby on January 11th (p. 3). As part of the response, please identify the incremental charge associated with the standby activity on January 11th. Response: Throughout a storm event, Vegetation Management and Operations stay in close communication to ensure tree crew resources are appropriate. In many storm events tree crew counts are decreased gradually, rather than occurring all at once. Demobilization of tree crews is paired with demobilization of line crew resources and the number of outage events remaining per AWC or division. Even when customers are substantially restored from a storm event, there are often remaining outage and non-outage Outage Management System (“OMS”) tickets that need to be addressed. It is not uncommon for Operations to request that tree crews remain on shift to address any remaining vegetation related work or to support line crews as needed. Once released from the storm shift and sent home to rest, it will take longer for tree crew personnel to travel in and respond. The decision to keep tree crews on shift is made by Operations leadership based on the state of OMS tickets regionally or by area work center. The Company does not track time differently between standby and work time for tree crews in the same manner as line crews. There are no separate billing rates or work designations for vegetation management crews that would differentiate standby and remediation work. Contracts with tree contractors do not differentiate standby time or billing rates as is typical with line crew contracts. The term “standby” on a tree crew timesheet indicates that the crew was assigned a storm shift and was actively ready to respond to events. The charge associated with the work time on January 11, 2024, was $1,378.04.Page 93 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-227 Page 1 of 2 Date Filed: October 01, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-15, pp. 53-54. The Company reported an incremental charge of $3,573 for the Lewis Tree Service Inc. vendor. The charge is supported by a timesheet that references activities from January 8-9, 2024 (prior to the storm event) and separate activities from January 11-12, 2024 (after the storm event) and failed to include an Eversource Connecticut Emergency Restoration Tree Contractor Work Location Report. Additionally, the charges include billing for atypical equipment, notably a Chipper Disk and a Chipper Truck. Respond to the following: a. The timesheet supports a larger charge than included within the recovery request. Please identify the specific dates that the Company is attributing to the MS24A event and provide calculations to support the recovery request. b. Provide the omitted Eversource Connecticut Emergency Restoration Tree Contractor Work Location Report detailing the specific storm-related activities performed. c. Provide documentation (i.e., screen-prints from the Company’s Work Management System) demonstrating that the remediation was caused by the MS24A event. d. Explain why the Chipper Disk and Chipper Truck were necessary for storm remediation purposes and for the activities referenced in the Report requested in subsection b. As part of the response, provide documentation to support the Company’s pre-authorization of the additional charges and specifically identify the incremental amount associated with this equipment. Response: a. Referring to Confidential Exhibit ACCT-2 (CLP-1A-15)(MS24A), pages 53-54, the invoice and corresponding timesheet in question are related to post-storm tree work pertaining to MN24A, January 8-9, 2024, and MS24A, January 11-12, 2024. Upon reviewing the storm cost allocations, the Company recognized that only January 8, 2024, was allocated to the MN24A storm event. Please refer to EOE-227, Attachment 1 CONFIDENTIAL, for the original and updated MN24A storm cost allocations. The cost associated with the work performed on January 11-12, 2024, and allocated to MS24A will be updated to $2,740. The Company will supplement Exhibit ACCT-2 (CLP-01) (MS24A) on page 52 at line 386 to remove $833.Page 94 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-227 Page 2 of 2 b. The Eversource Connecticut Emergency restoration Tree Contractor Location document is not available. Work locations were reported on the bottom section of the timesheet. c. Not all tree-related damage is documented through the Company’s Outage Management System (“OMS”). These timesheets were approved by the supervising Company Arborist, who manages tree crew response to address storm damaged vegetation. Examples of storm damaged vegetation include uprooted trees, split trees, broken branches and limbs, and other structural failures that compromise the stability of that tree or tree part. Tree limbs may be hanging directly on the wires, or they may be overhanging and threatening. Not all vegetation contacts during storms cause immediate outages. Storm damage locations are reported through various channels such as customer service calls, tree warden communications and organized patrols. Storm damaged vegetation locations are collected, organized and dispatched by the Company Arborist and are not stored in a centralized location. There is no documentation to provide. d. The Company Arborist may approve the use of a Disk Chipper and Chip Truck for several reasons. There may not be anywhere to place damaged vegetation except in a roadway, which would cause a public safety hazard. The Company Arborist may approve the use of a chipper due to the location of the issue to proactively prevent customer complaints. Use of a chipper is an exception that is only allowed at the direction of the Company Arborist. The Eversource Arborist would not have approved the timesheet if they did not direct the crew to use and bill a Disk Chipper and Chip Truck.Page 95 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-228 Page 1 of 2 Date Filed: October 01, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-15, pp. 58-59. The Company reported an incremental charge of $4,395 for the Lewis Tree Service Inc. vendor. The charge is supported by a timesheet that references activities from January 8-9, 2024 (prior to the storm event) and separate activities from January 11-12, 2024 (after the storm event) and failed to include an Eversource Connecticut Emergency Restoration Tree Contractor Work Location Report. Additionally, the charges include billing for atypical equipment, notably extra chainsaws. Respond to the following: a. The timesheet supports a larger charge than included within the recovery request. Please identify the specific dates that the Company is attributing to the MS24A event and provide calculations to support the recovery request. b. Provide the omitted Eversource Connecticut Emergency Restoration Tree Contractor Work Location Report detailing the specific storm-related activities performed. c. Provide documentation (i.e., screen-prints from the Company’s Work Management System) demonstrating that the remediation was caused by the MS24A event. d. Explain why the extra chainsaws were necessary for storm remediation purposes and for the activities referenced in the Report requested in subsection b. As part of the response, provide documentation to support the Company’s pre-authorization of the additional chainsaw charges and specifically identify the incremental amount associated with this equipment. Response: a. Referring to Confidential Exhibit ACCT-2 (CLP-1A-15)(MS24A), pages 58-59, the invoice and corresponding timesheet in question are related to post-storm tree work pertaining to MN24A, January 8-9, 2024, and MS24A, January 11-12, 2024. Upon reviewing the storm cost allocations, the Company identified that only January 8, 2024, was allocated to the MN24A storm event. Please refer to EOE-228, Attachment 1 CONFIDENTIAL, for the original and updated MN24A storm cost allocations and supporting calculations. The cost associated with the work performed on January 11-12, 2024, and allocated to MS24A will be updated to $2,990. The Company will supplement Exhibit ACCT-2 (CLP-01) (MS24A) on page 52 at line 388 to remove $1405.Page 96 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-228 Page 2 of 2 b. The Eversource Connecticut Emergency restoration Tree Contractor Location document is not available. Work locations were reported on the bottom section of the timesheet. c. Not all tree-related damage is documented through the Company’s Outage Management System (“OMS”). These timesheets were approved by the supervising Company Arborist, who manages tree crew response to address storm damaged vegetation. Examples of storm damaged vegetation include uprooted trees, split trees, broken branches and limbs, and other structural failures that compromise the stability of that tree or tree part. Tree limbs may be hanging directly on the wires, or they may be overhanging and threatening. Not all vegetation contacts during storms cause immediate outages. Storm damage locations are reported through various channels such as customer service calls, tree warden communications and organized patrols. Storm damaged vegetation locations are collected, organized and dispatched by the Company Arborist and are not stored in a centralized location. There is no documentation to provide. d. There are numerous circumstances where billing for chainsaws during storm restoration is appropriate. The equipment rates to be billed are detailed in contract agreements with the individual tree contractors. A common agreement is that bucket truck crews will have a minimum of two chain saws on the truck included in the cost of the hourly bucket truck rate. For local tree crews working in Connecticut, the requirement is a minimum of two (one-man) gasoline chain saws (one with at least a 14-inch bar length and one with at least a 21-inch bar length). During storm restoration, larger chain saws with a larger bar length may be required to quickly clear large fallen trees. Additionally, climbing tree crews will bill for chainsaws as climbing crew rates do not include chainsaws.Page 97 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-229 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-15, pp. 119-121. The Company reported an incremental charge of $9,856 for the Lewis Tree Service Inc vendor. The charge relates to activities from January 9-12, 2024. Explain how the vendor was permitted to bill for nine hours on January 12, 2024 when they recorded work hours between 7am and 3pm (total of eight hours). As part of the response, please identify the impact of billing an extra hour (OT) for each employee. Response: The question posed does not match what is shown on the timesheet for these page numbers. January 12th was billed for 5 hours and is correct. Looking at the total invoice amount, it is likely this question was posed about Confidential Exhibit ACCT-2 CLP-1A-15, pages 116-118, so this response will reference the Lewis Tree invoice and timesheet on those pages. The work locations reflected on the timesheet may not always show the time of travel back to the crew's reporting or parking location during emergency response work. In these situations, a tree crew employee may not update their work location after field operations are complete and before returning to their parking location. The contractor's General Foreman reviews and adjusts the timesheet as necessary to ensure all compensable time, including travel time back to the reporting or parking location, is accurately captured in the billing hours. The Eversource Arborist reviewed the timesheet, verified the crew's work activities and travel timeframe, and confirmed that the total hours billed were correct. As a result, while the final travel segment may not be reflected as a separate work location entry, the associated travel time was included in the approved billing hours and appropriately accounted for.
As listed on the current system
Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)