Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (EOE Set 5 and UCONN Set 2)

Files3

Search terms highlighted
Eversource rate increase is on 11 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
9 pages match
  1. Page 95 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-228 Page 1 of 2 Date Filed: October 01, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-15, pp. 58-59. The Company reported an incremental charge of $4,395 for the Lewis Tree Service Inc. vendor. The charge is supported by a timesheet that references activities from January 8-9, 2024 (prior to the storm event) and separate activities from January 11-12, 2024 (after the storm event) and failed to include an Eversource Connecticut Emergency Restoration Tree Contractor Work Location Report. Additionally, the charges include billing for atypical equipment, notably extra chainsaws. Respond to the following: a. The timesheet supports a larger charge than included within the recovery request. Please identify the specific dates that the Company is attributing to the MS24A event and provide calculations to support the recovery request. b. Provide the omitted Eversource Connecticut Emergency Restoration Tree Contractor Work Location Report detailing the specific storm-related activities performed. c. Provide documentation (i.e., screen-prints from the Company’s Work Management System) demonstrating that the remediation was caused by the MS24A event. d. Explain why the extra chainsaws were necessary for storm remediation purposes and for the activities referenced in the Report requested in subsection b. As part of the response, provide documentation to support the Company’s pre-authorization of the additional chainsaw charges and specifically identify the incremental amount associated with this equipment. Response: a. Referring to Confidential Exhibit ACCT-2 (CLP-1A-15)(MS24A), pages 58-59, the invoice and corresponding timesheet in question are related to post-storm tree work pertaining to MN24A, January 8-9, 2024, and MS24A, January 11-12, 2024. Upon reviewing the storm cost allocations, the Company identified that only January 8, 2024, was allocated to the MN24A storm event. Please refer to EOE-228, Attachment 1 CONFIDENTIAL, for the original and updated MN24A storm cost allocations and supporting calculations. The cost associated with the work performed on January 11-12, 2024, and allocated to MS24A will be updated to $2,990. The Company will supplement Exhibit ACCT-2 (CLP-01) (MS24A) on page 52 at line 388 to remove $1405.
  2. Page 96 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-228 Page 2 of 2 b. The Eversource Connecticut Emergency restoration Tree Contractor Location document is not available. Work locations were reported on the bottom section of the timesheet. c. Not all tree-related damage is documented through the Company’s Outage Management System (“OMS”). These timesheets were approved by the supervising Company Arborist, who manages tree crew response to address storm damaged vegetation. Examples of storm damaged vegetation include uprooted trees, split trees, broken branches and limbs, and other structural failures that compromise the stability of that tree or tree part. Tree limbs may be hanging directly on the wires, or they may be overhanging and threatening. Not all vegetation contacts during storms cause immediate outages. Storm damage locations are reported through various channels such as customer service calls, tree warden communications and organized patrols. Storm damaged vegetation locations are collected, organized and dispatched by the Company Arborist and are not stored in a centralized location. There is no documentation to provide. d. There are numerous circumstances where billing for chainsaws during storm restoration is appropriate. The equipment rates to be billed are detailed in contract agreements with the individual tree contractors. A common agreement is that bucket truck crews will have a minimum of two chain saws on the truck included in the cost of the hourly bucket truck rate. For local tree crews working in Connecticut, the requirement is a minimum of two (one-man) gasoline chain saws (one with at least a 14-inch bar length and one with at least a 21-inch bar length). During storm restoration, larger chain saws with a larger bar length may be required to quickly clear large fallen trees. Additionally, climbing tree crews will bill for chainsaws as climbing crew rates do not include chainsaws.
  3. Page 97 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-229 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-15, pp. 119-121. The Company reported an incremental charge of $9,856 for the Lewis Tree Service Inc vendor. The charge relates to activities from January 9-12, 2024. Explain how the vendor was permitted to bill for nine hours on January 12, 2024 when they recorded work hours between 7am and 3pm (total of eight hours). As part of the response, please identify the impact of billing an extra hour (OT) for each employee. Response: The question posed does not match what is shown on the timesheet for these page numbers. January 12th was billed for 5 hours and is correct. Looking at the total invoice amount, it is likely this question was posed about Confidential Exhibit ACCT-2 CLP-1A-15, pages 116-118, so this response will reference the Lewis Tree invoice and timesheet on those pages. The work locations reflected on the timesheet may not always show the time of travel back to the crew's reporting or parking location during emergency response work. In these situations, a tree crew employee may not update their work location after field operations are complete and before returning to their parking location. The contractor's General Foreman reviews and adjusts the timesheet as necessary to ensure all compensable time, including travel time back to the reporting or parking location, is accurately captured in the billing hours. The Eversource Arborist reviewed the timesheet, verified the crew's work activities and travel timeframe, and confirmed that the total hours billed were correct. As a result, while the final travel segment may not be reflected as a separate work location entry, the associated travel time was included in the approved billing hours and appropriately accounted for.
  4. Page 98 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-230 Page 1 of 1 Date Filed: October 01, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 16-18. The Company reported an incremental charge of $3,149 for the Lewis Tree Service Inc vendor. The charge relates to activities from January 8-10, 2024. Explain how remediation activity from January 8, 2024, relates to the MS24A event when the event did not impact the state until the evening of January 9th. As part of the response, please identify the incremental impact of the January 8th charge. Response: Please refer to Exhibit ACCT-2 (CLP-01) (MS24A) on page 52 at line 423 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 16-18. The total invoiced amount is $3,875. The incremental charges associated with January 8, 2024, are $726 and these charges were allocated to the MN24A event and not included as part of the MS24A event. The incremental charges associated with MS24A on January 9-10, 2024, are $3,149.
  5. Page 99 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-231 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibits ACCT-2 CLP-1A-15 through CLP-1A-16, Rows 373-376, 393. The Company reported various incremental charges for the Lewis Tree Service Inc vendor. Each of the invoices included billing for extra chainsaws. Identify if the extra chainsaws were pre-authorized by the Eversource arborist and identify the total incremental amounts. If pre-authorization occurred, please provide documentation, along with explanations for why the extra equipment was necessary. Response: It is an established practice for contractor tree crews to bill for larger chainsaws during storm restoration activities. The use of larger-bar chainsaws when removing large-diameter trees improves operational efficiency and enhances worker safety by allowing the work to be performed quicker and with less risk to the operator. The chainsaws billed on the referenced invoices are larger than the standard chainsaws provided on each bucket truck, consistent with the applicable contract provisions. Because tree crews cannot determine the size and removal requirements of a tree until they arrive at the work location, requiring a separate trip to obtain a larger chainsaw could delay restoration efforts and result in additional travel costs. Accordingly, billing for a larger chainsaw is permitted for the entire shift when utilized, as that equipment resource is dedicated to the assigned crew and is therefore unavailable for use on other work during that period. The associated chainsaw charges were reviewed and approved by the Eversource Arborist through the timesheet approval process, confirming that use of the equipment was appropriate for the work performed.
  6. Page 100 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-232 Page 1 of 2 Date Filed: October 01, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 135-151. The Company reported an incremental charge of $93,805 for the Lucas Tree Experts vendor. The charge was supported by multiple timesheets that reference activities starting on January 7, 2024 (several days prior to the storm event) and includes Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports that identify remediation at consistent locations for the duration of the activity (see e.g., p. 139, remediation on 1/7, 1/8, 1/10, and 1/11 occurred at “New rd, Nt-Nt” or “New, 1-2”). Respond to the following: a. Referring to pp. 139, 141, 143, 145, 147, 149, and 151, explain whether each of the referenced Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports were fully completed in accordance with the Company’s expectations. As part of the response, explain why most of the activity was solely characterized as “Vine” and does not include additional details on the underlying Trees. b. Explain what “New rd, Nt-Nt” or “New, 1-2” represents as included within the various timesheets and Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports (i.e., pp. 138-151). c. Identify the total monetary impact of all services represented as “New rd, Nt-Nt” or “New, 1-2”. d. Referring to pp. 138, 145, 148, and 150, explain the specific storm-related services performed on January 7-8th (i.e., days prior to the MS24A event) and explain why the vendor was permitted to perform services on a Sunday, at higher billable rates. e. Identify the total amount of per diems that the vendor was permitted to bill and explain why these expenses were warranted for storm remediation purposes. As part of the response, cite the contract provision that permits per diems for storm remediation purposes. Response: a. Lucas Tree’s electronic Eversource Connecticut Emergency Restoration Tree Contractor Work Location sheet is an electronic form developed and maintained by the contractor. The system contains required fields that must be completed before an entry can be submitted. As a result, when crews are performing storm-related work that is not associated with a specific ticket or work location, they cannot leave those fields blank. In these cases, crews may enter “Vine” as a placeholder value to satisfy the system’s data-entry
  7. Page 101 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-232 Page 2 of 2 requirements. “Vine” does not represent a specific work location or activity; rather, it is an administrative entry used when crews are engaged in storm-related work but are not responding to a particular ticket. The Company verifies storm-related work using additional records, including timesheets, dispatch information, and field oversight, and therefore does not rely solely on the placeholder entry for validation purposes. b. New Rd is the location of the Madison Area Work Center (AWC). It signifies the tree crew was on shift and located at the work center. “Nt-Nt” is a default blank field for pole numbers. If there are no pole numbers recorded, the system prints “Nt-Nt”. c. The tree crew’s work hours are not broken down by event locations so this time cannot be separated out. d. The tree crews referred to in Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16 on pages 135-151 were non-local tree crews from South Carolina (pages 138, 146, 148, and 150) and North Carolina (140, 142, and 144). The tree crews were mobilizing and travelling from South Carolina and North Carolina to Connecticut on January 7-8, 2024. e. Contractor tree crews receive meals or meal per diems during active storm response per contract agreements. Lucas Tree’s contract for non-local tree crews includes a per diem of $25 per meal per day (up to 3 meals per day). The $75 per diem charged is appropriate per the contract provisions.
  8. Page 102 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-233 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 185-187. The Company reported an incremental charge of $599 for the Lucas Tree Experts vendor. The charge was related to hotels for the evening of January 7, 2024, several days prior to the MS24A event. Explain how the charges relate to the MS24A event and provide documentation to support the applicability of the charges. Response: The contractor tree crews were mobilized from South Carolina to support the anticipated storm event beginning on January 9, 2024. Due to the distance involved, multiple days of travel were required for the crews to reach Connecticut. The hotel charges incurred on January 7, 2024, reflect an overnight stop in Virginia to satisfy required rest periods during transit. The crews traveled on January 7 and January 8 to ensure they arrived in Connecticut rested and prepared to begin restoration work on January 9. The Eversource Arborist's approval of the timesheet confirmed that this travel was necessary to support and was appropriately charged to the MS24A event.
  9. Page 103 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-234 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 193-212. The Company reported two incremental charges in the combined amount of $153,711 for the M J Electric LLC vendor. Respond to the following: a. Explain why the equipment was charged at 50% for standby. If applicable, cite the applicable contract provisions. Additionally, identify the remaining amount ($) of equipment that was charged for standby. b. Referring to p. 207, confirm that the Company included a charge applicable to “car vs pole”. If confirmed, identify the total impact of this activity and explain why this amount was not eliminated from the storm recovery request. As part of the response, please provide an unlocked Excel spreadsheet supporting applicable calculations. Response: Please refer to Exhibit ACCT-2 (CLP-1)(MS24A), Outside Line Contractors, Lines 443-444, MJ Electric LLC, in the combined amount of $153,711. a. Per the COC contract provisions in Exhibit B “Pricing Schedule” and within Appendix PS5, the contractor is required to charge 50% of the equipment rates while on standby. Additionally, the remaining amount of equipment charged for standby was $4,896.75. b. During the internal review process, it was determined that the work associated with Event 5234191 was related to storm-induced tree damage to equipment and not a car vs pole incident as indicated on the timesheet. Therefore, the associated charges were retained as storm-related costs and were not removed. The incorrect work description appears to have been a documentation error. During storm restoration activities, personnel are often managing multiple work orders simultaneously and recording information in the field, including handwritten notes when necessary. Based on the review of the supporting documentation, the Company determined that the work performed was storm-related and that the discrepancy was limited to the description recorded on the timesheet. In addition, please refer to EOE-234, Attachment 1, for the OMS details related to Event 5234191 to validate repairs were due to tree damage.
  10. Page 104 of 169

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-235 Page 1 of 2 Date Filed: September 25, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-FOOD) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, p. 213. The Company reported an incremental charge of $31,432 for the Madison Lakota Oaks FB LLC vendor. The charges included 160 meals (e.g., “To Go Breakfast” and “sandwich To Go Lunch”) for January 12, 2024. Identify if all of the referenced meals were utilized in support of the MS24A event, and if so, by which vendor(s). If not all used, explain why they could not be canceled. Response: Referring to Exhibit ACCT-2 CLP-1A-16 (MS24A), Madison Lakota Oaks, for charges of $31,432, which included dinner for Wednesday, January 10, 2024, ‘to go’ breakfast, lunch and buffet dinner for Thursday, January 11, 2024, and ‘to go’ breakfast and lunch for Friday, January 12, 2024. Under the Company’s ERP for a severe weather event, resource and logistical acquisitions such as hotel rooms and food, must be undertaken ahead of time based on the expected severity and complexity of an event. Expected complexity and the associated resource and logistical requirements are analyzed based on considerations of numerous factors including, but not limited to, forecasted weather conditions; certainty of the weather forecast, size of the anticipated incident and expected impacts to personal safety and property, outage prediction modeling, anticipated extent of potential or known damage, and historical experience with other events. The Company cannot wait until a predicted weather event actually reaches its service territory to formulate its response plan and secure needed resources, as PURA has established pursuant to Conn Gen. St. §§16-32e, 16-32h and PURA’s performance standards, as well as the structure and implementation of the ERP. If the Company were to wait until a storm’s actual impact to secure mutual aid and contractor crews, hotels, food services and other logistics necessities, critical resources may not be available when needed, or, even if available, would be significantly more expensive than if procured earlier. The Company makes every effort to cancel rooms that are unused if known within the timeframe for allowed cancellation according to the hotel policy. However, based on the shifting restoration needs or priorities, crews are often relocated within regions of the service territory to work on restoration well after the cancellation period has expired and may have to be re-assigned to other
2 pages match

As listed on the current system

Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)

This filing on the current system (opens in a new tab)