Discovery Compilation (EOE Set 5 and UCONN Set 2)
Files3
Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 6 2026.pdf
EOE Set 5_COMBINED.pdf
PDF · 1.3 MB · 169 pagesText searchable
Download EOE Set 5_COMBINED.pdfRead the text of EOE Set 5_COMBINED.pdf
UCONN Set 2_COMBINED.pdf
PDF · 372 KB · 19 pagesText searchable
Download UCONN Set 2_COMBINED.pdfRead the text of UCONN Set 2_COMBINED.pdf
Page 98 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-230 Page 1 of 1 Date Filed: October 01, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 16-18. The Company reported an incremental charge of $3,149 for the Lewis Tree Service Inc vendor. The charge relates to activities from January 8-10, 2024. Explain how remediation activity from January 8, 2024, relates to the MS24A event when the event did not impact the state until the evening of January 9th. As part of the response, please identify the incremental impact of the January 8th charge. Response: Please refer to Exhibit ACCT-2 (CLP-01) (MS24A) on page 52 at line 423 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 16-18. The total invoiced amount is $3,875. The incremental charges associated with January 8, 2024, are $726 and these charges were allocated to the MN24A event and not included as part of the MS24A event. The incremental charges associated with MS24A on January 9-10, 2024, are $3,149.Page 99 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-231 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibits ACCT-2 CLP-1A-15 through CLP-1A-16, Rows 373-376, 393. The Company reported various incremental charges for the Lewis Tree Service Inc vendor. Each of the invoices included billing for extra chainsaws. Identify if the extra chainsaws were pre-authorized by the Eversource arborist and identify the total incremental amounts. If pre-authorization occurred, please provide documentation, along with explanations for why the extra equipment was necessary. Response: It is an established practice for contractor tree crews to bill for larger chainsaws during storm restoration activities. The use of larger-bar chainsaws when removing large-diameter trees improves operational efficiency and enhances worker safety by allowing the work to be performed quicker and with less risk to the operator. The chainsaws billed on the referenced invoices are larger than the standard chainsaws provided on each bucket truck, consistent with the applicable contract provisions. Because tree crews cannot determine the size and removal requirements of a tree until they arrive at the work location, requiring a separate trip to obtain a larger chainsaw could delay restoration efforts and result in additional travel costs. Accordingly, billing for a larger chainsaw is permitted for the entire shift when utilized, as that equipment resource is dedicated to the assigned crew and is therefore unavailable for use on other work during that period. The associated chainsaw charges were reviewed and approved by the Eversource Arborist through the timesheet approval process, confirming that use of the equipment was appropriate for the work performed.Page 100 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-232 Page 1 of 2 Date Filed: October 01, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 135-151. The Company reported an incremental charge of $93,805 for the Lucas Tree Experts vendor. The charge was supported by multiple timesheets that reference activities starting on January 7, 2024 (several days prior to the storm event) and includes Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports that identify remediation at consistent locations for the duration of the activity (see e.g., p. 139, remediation on 1/7, 1/8, 1/10, and 1/11 occurred at “New rd, Nt-Nt” or “New, 1-2”). Respond to the following: a. Referring to pp. 139, 141, 143, 145, 147, 149, and 151, explain whether each of the referenced Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports were fully completed in accordance with the Company’s expectations. As part of the response, explain why most of the activity was solely characterized as “Vine” and does not include additional details on the underlying Trees. b. Explain what “New rd, Nt-Nt” or “New, 1-2” represents as included within the various timesheets and Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports (i.e., pp. 138-151). c. Identify the total monetary impact of all services represented as “New rd, Nt-Nt” or “New, 1-2”. d. Referring to pp. 138, 145, 148, and 150, explain the specific storm-related services performed on January 7-8th (i.e., days prior to the MS24A event) and explain why the vendor was permitted to perform services on a Sunday, at higher billable rates. e. Identify the total amount of per diems that the vendor was permitted to bill and explain why these expenses were warranted for storm remediation purposes. As part of the response, cite the contract provision that permits per diems for storm remediation purposes. Response: a. Lucas Tree’s electronic Eversource Connecticut Emergency Restoration Tree Contractor Work Location sheet is an electronic form developed and maintained by the contractor. The system contains required fields that must be completed before an entry can be submitted. As a result, when crews are performing storm-related work that is not associated with a specific ticket or work location, they cannot leave those fields blank. In these cases, crews may enter “Vine” as a placeholder value to satisfy the system’s data-entryPage 101 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-232 Page 2 of 2 requirements. “Vine” does not represent a specific work location or activity; rather, it is an administrative entry used when crews are engaged in storm-related work but are not responding to a particular ticket. The Company verifies storm-related work using additional records, including timesheets, dispatch information, and field oversight, and therefore does not rely solely on the placeholder entry for validation purposes. b. New Rd is the location of the Madison Area Work Center (AWC). It signifies the tree crew was on shift and located at the work center. “Nt-Nt” is a default blank field for pole numbers. If there are no pole numbers recorded, the system prints “Nt-Nt”. c. The tree crew’s work hours are not broken down by event locations so this time cannot be separated out. d. The tree crews referred to in Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16 on pages 135-151 were non-local tree crews from South Carolina (pages 138, 146, 148, and 150) and North Carolina (140, 142, and 144). The tree crews were mobilizing and travelling from South Carolina and North Carolina to Connecticut on January 7-8, 2024. e. Contractor tree crews receive meals or meal per diems during active storm response per contract agreements. Lucas Tree’s contract for non-local tree crews includes a per diem of $25 per meal per day (up to 3 meals per day). The $75 per diem charged is appropriate per the contract provisions.Page 102 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-233 Page 1 of 1 Date Filed: September 25, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 185-187. The Company reported an incremental charge of $599 for the Lucas Tree Experts vendor. The charge was related to hotels for the evening of January 7, 2024, several days prior to the MS24A event. Explain how the charges relate to the MS24A event and provide documentation to support the applicability of the charges. Response: The contractor tree crews were mobilized from South Carolina to support the anticipated storm event beginning on January 9, 2024. Due to the distance involved, multiple days of travel were required for the crews to reach Connecticut. The hotel charges incurred on January 7, 2024, reflect an overnight stop in Virginia to satisfy required rest periods during transit. The crews traveled on January 7 and January 8 to ensure they arrived in Connecticut rested and prepared to begin restoration work on January 9. The Eversource Arborist's approval of the timesheet confirmed that this travel was necessary to support and was appropriately charged to the MS24A event.Page 103 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-234 Page 1 of 1 Date Filed: September 25, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 193-212. The Company reported two incremental charges in the combined amount of $153,711 for the M J Electric LLC vendor. Respond to the following: a. Explain why the equipment was charged at 50% for standby. If applicable, cite the applicable contract provisions. Additionally, identify the remaining amount ($) of equipment that was charged for standby. b. Referring to p. 207, confirm that the Company included a charge applicable to “car vs pole”. If confirmed, identify the total impact of this activity and explain why this amount was not eliminated from the storm recovery request. As part of the response, please provide an unlocked Excel spreadsheet supporting applicable calculations. Response: Please refer to Exhibit ACCT-2 (CLP-1)(MS24A), Outside Line Contractors, Lines 443-444, MJ Electric LLC, in the combined amount of $153,711. a. Per the COC contract provisions in Exhibit B “Pricing Schedule” and within Appendix PS5, the contractor is required to charge 50% of the equipment rates while on standby. Additionally, the remaining amount of equipment charged for standby was $4,896.75. b. During the internal review process, it was determined that the work associated with Event 5234191 was related to storm-induced tree damage to equipment and not a car vs pole incident as indicated on the timesheet. Therefore, the associated charges were retained as storm-related costs and were not removed. The incorrect work description appears to have been a documentation error. During storm restoration activities, personnel are often managing multiple work orders simultaneously and recording information in the field, including handwritten notes when necessary. Based on the review of the supporting documentation, the Company determined that the work performed was storm-related and that the discrepancy was limited to the description recorded on the timesheet. In addition, please refer to EOE-234, Attachment 1, for the OMS details related to Event 5234191 to validate repairs were due to tree damage.Page 104 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-235 Page 1 of 2 Date Filed: September 25, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-FOOD) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, p. 213. The Company reported an incremental charge of $31,432 for the Madison Lakota Oaks FB LLC vendor. The charges included 160 meals (e.g., “To Go Breakfast” and “sandwich To Go Lunch”) for January 12, 2024. Identify if all of the referenced meals were utilized in support of the MS24A event, and if so, by which vendor(s). If not all used, explain why they could not be canceled. Response: Referring to Exhibit ACCT-2 CLP-1A-16 (MS24A), Madison Lakota Oaks, for charges of $31,432, which included dinner for Wednesday, January 10, 2024, ‘to go’ breakfast, lunch and buffet dinner for Thursday, January 11, 2024, and ‘to go’ breakfast and lunch for Friday, January 12, 2024. Under the Company’s ERP for a severe weather event, resource and logistical acquisitions such as hotel rooms and food, must be undertaken ahead of time based on the expected severity and complexity of an event. Expected complexity and the associated resource and logistical requirements are analyzed based on considerations of numerous factors including, but not limited to, forecasted weather conditions; certainty of the weather forecast, size of the anticipated incident and expected impacts to personal safety and property, outage prediction modeling, anticipated extent of potential or known damage, and historical experience with other events. The Company cannot wait until a predicted weather event actually reaches its service territory to formulate its response plan and secure needed resources, as PURA has established pursuant to Conn Gen. St. §§16-32e, 16-32h and PURA’s performance standards, as well as the structure and implementation of the ERP. If the Company were to wait until a storm’s actual impact to secure mutual aid and contractor crews, hotels, food services and other logistics necessities, critical resources may not be available when needed, or, even if available, would be significantly more expensive than if procured earlier. The Company makes every effort to cancel rooms that are unused if known within the timeframe for allowed cancellation according to the hotel policy. However, based on the shifting restoration needs or priorities, crews are often relocated within regions of the service territory to work on restoration well after the cancellation period has expired and may have to be re-assigned to otherPage 105 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-235 Page 2 of 2 hotel rooms that are closer to their physical work location (the Company focuses on locating crews as close as possible to their assigned restoration jobs to minimize the need for travel, thus freeing them up for actual restoration work). The Company must meet its contractual obligations with each hotel to pay for rooms reserved post the cancellation time frame. It is also important to note that, in times of service outages, there are other demands on hotel space from displaced residents that are experiencing service outages. As a result, the Company needs to be able to have adequate facilities to house the crews that are required to be on-site at the outset of an event, and the Company does that through contractual and logistical commitments made ahead of the event. In preparation for the storm event, the Company had booked rooms at the Madison Lakota Oaks for Wednesday, January 10, 2024 and Thursday, January 11, 2024 nights and ordered all meals as noted previously. On January 8, 2024, the Madison Lakota Oaks confirmed that food had been ordered to accommodate all meals and could not be cancelled. Due to changes in food and lodging needs for the storm event, the Company had to cancel the rooms. The cancellation notification was sent via email on Wednesday, January 10, 2024, at 11:37am. The Company did not incur any charges for the cancelled rooms, but did incur the cost of the ordered food.Page 106 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-236 Page 1 of 2 Date Filed: October 01, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE; WIRE GUARDS) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 214-225. The Company reported four incremental charges in the combined amount of $60,030 for the Maverick Construction Corp vendor for Wire Guards. Respond to the following: a. Confirm that the wire guards were not utilized for remediation services (i.e., guarding downed wires). If not confirmed, cite the supporting documents demonstrating the actual services that were rendered. b. Identify the billings attributed to mobilization, demobilization, and standby. If response to subsection (a) identifies actual remediation, please also include the billings attributed to work. c. Referring to pp. 216, 219, 222, and 225, the Company provided Eversource Contractor Storm Mobilization & Demobilization Time Reports that billed eight hours of mobilization and four hours of demobilization for every vendor employee with a general location reference of “Various locations throughout the northeast, NY, PA, Boston MA”. Explain how vendor employees could have mobilized/demobilized from “various locations” but were permitted to bill the same number of hours. Additionally, explain how the Company was able to validate the accuracy of the billed hours given the lack of locations for each billed individual. d. Provide documentation to support the specific efforts performed by the Company to obtain local wire down guard crews in lieu of those “throughout the northeast”. e. Cite the location of the specific contract and pricing schedule supporting the rates charged for the services (i.e., wire down guards) provided. Response: a. Wire Guards procured from Maverick Construction Corp were hired to perform wire guard functions exclusively. Due to the storm not materializing as forecasted, Maverick resources were not deployed to the field. The associated charges were related to mobilization, time awaiting potential deployment and demobilization. b. All charges are attributed to mobilization, demobilization, and standby.Page 107 of 169
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-236 Page 2 of 2 c. The contractors are hired from a specific hiring location. The agreements pay for mobilization from that location. The individual resources are not paid for their specific locations. For this invoice the contractor mobilized from Boston MA to be staged in CT and traveled during a weather event. d. Eversource seeks to secure the most commercially competitive suppliers with the closest available qualified wire down guard resources to support storm response activities. The resource acquisition process begins with outreach to available local and regional resources and expands geographically as necessary to satisfy forecasted staffing requirements, with priority given to qualified suppliers under existing agreements. Resource availability is often impacted by the geographic scope of the weather event and competing demand across affected utilities. Accordingly, Eversource attempts to utilize local resources where available and supplements those resources with regional crews when local availability is insufficient to meet operational needs. For MS24A, the Company contacted available resources within the region and expanded its requests as necessary to obtain the required staffing levels. Due to storm-related demand and resource availability constraints, regional resources were utilized to supplement locally available wire down guard personnel. e. The rates charged for the Wire Down Guard services are supported by the Maverick Construction Corp. Agreement for Wires Down Guards for Electric Utility Distribution Emergency Response Program Work, provided in OCC-044, Attachment 2, Page 3982.
As listed on the current system
Corres. 10/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 5 and UCONN Set 2)