  1. Page 14 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-080 Page 1 of 4 Date Filed: October 01, 2026 Witness: Laura E. Perbeck Request from: ALLCO Question: (Follow-up to ALLCO-035.) The referenced annual RAM filings do not contain the requested year-by-year presentation. Provide, in a single native-format table for each calendar year 2019 through 2025 and year-to-date 2026: (a) the MWh of energy and quantities of other products purchased under the Millstone PPA; (b) the average price per MWh paid; (c) the disposition of those products by category and quantity; (d) the revenues realized from each disposition category, including the Company’s buyer’s percentage entitlement of ISO-NE settlement proceeds and CESE sales proceeds; and (e) the resulting net cost or net revenue charged or credited to customers through the NBFMCC, by year. If any component appears in an existing filing, cite the docket, filing, exhibit, and page where the specific annual figure appears. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, the requested data is provided in Eversource’s annual RAM filings for 2019-2025, and will be provided for 2026 on or around March 1, 2027, as applicable. For 2019-2025 data, the following applies: (a) As stated in response to ALLCO-035 i, Eversource provides this information in its annual RAM filings in compliance with Order No. 5 of PURA’s November 22, 2019, 3rd Interim Decision in Docket No. 18-05-04. Below is a list of each docket, filing, exhibit, and page of the annual RAM filings where the information is located: Allco previously litigated the Millstone PPA in the Company’s Docket No. 24-01-03 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-02, ALLCO-03, ALLCO-05, ALLCO-06, ALLCO-07, and ALLCO-21. Eversource objected to each of these questions. 1
  2. Page 15 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-080 Page 2 of 4 Year 2019 2020 2021 2022 2023 2024 2025 RAM Docket No. 20-03-01 21-01-03 22-01-03 23-01-03 24-01-03 25-01-03 26-01-03 Filing Location Date Filed Exhibit 3 pg. 18 Exhibit 3 pg. 18 Exhibit 3 pg. 17 Exhibit F pg. 17 Exhibit F pg. 17 Exhibit F pg. 17 Exhibit F pg. 17 4/8/20 3/1/21 3/1/22 3/1/23 3/1/24 3/3/25 3/2/26 (b) Eversource’s response to ALLCO-038 ii directly quoted the public Millstone PPA regarding pricing. (c) Eversource previously provided this information in response to Allco-037 iii, and has provided further information in response to ALLCO-082. (d) As stated in response to ALLCO-035, Eversource provides this information in its annual RAM filings in compliance with Order No. 5 of PURA’s November 22, 2019, 3rd Interim Decision in Docket No. 18-05-04. See part (a) for a list of each docket, filing, exhibit, and page of the annual RAM filings where the information is located. (e) As stated in response to Allco-035, Eversource provides this information in its annual RAM filings in compliance with Order No. 5 of PURA’s November 22, 2019, 3rd Interim Decision in Docket No. 18-05-04. See part (a) for a list of each docket, filing, exhibit, and page of the annual RAM filings where the information is located: Prior Referenced Response: ii ALLCO-035 Question: For each year 2019 through 2025 and year-to-date 2026, state: (a) the quantity (MWh) of energy and other products the Company purchased under the Millstone PPA; (b) the average price per MWh paid; (c) the manner of disposition of those products (e.g., resale into the ISO-New England day-ahead or real-time markets, bilateral sales, or use to serve the Company’s standard service or supplier of last resort service load), with quantities for each; (d) the revenues realized from each manner of disposition; and (e) the resulting net cost or net revenue charged or credited to customers through the NBFMCC (or any other rate mechanism), by year. Produce the supporting workpapers in native format. ALLCO-035 Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside
  3. Page 16 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-080 Page 3 of 4 the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding.1 Without waiving said objection, Eversource provides this information in its March 1st annual RAM filings2 in compliance with Order No. 5 of PURA’s November 22, 2019, 3rd Interim Decision in Docket No. 18-05-04. The Millstone PPA, inclusive of pricing per MWh for Products purchased under that agreement, is publicly available on PURA’s Docketed Database Filings website under Docket No. 18-05-04.3 Regarding the sale of Millstone products, please refer to Eversource’s response to ALLCO-037. ii ALLCO-038 Question: For each year 2019 through 2025: state (a) the Company’s total standard service and supplier of last resort service load (MWh) and the average all-in supply cost per kWh the Company paid to wholesale suppliers for that load; (b) the average cost per kWh of energy purchased under the Millstone PPA; and (c) the net amount charged to customers through the NBFMCC in respect of the Millstone PPA for that year; and produce data sufficient to calculate, for each such year, the net impact on customers had the Company used Millstone PPA energy to serve standard service and supplier of last resort service load up to the lesser of the Millstone PPA quantities or that load (accounting for the residual quantities that would still have been resold into the market), including hourly standard service load data and hourly Millstone PPA delivery quantities in native format. ALLCO-038 Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. Without waiving said objection, the Company’s Standard Service loads can be found on the following website: https://www.eversource.com/residential/about/doing-business-with-us/energy-suppliers/connecticut-wholesalesupply. The supply costs paid to suppliers can be found in the following dockets: 2019-01-01; 2020-01-01; 2021-0101; 2022-01-01; 2023-01-01; 2024-01-01; 2025-01-01. As noted in the Millstone PPA, “The Price for the Buyer’s Percentage Entitlement of Delivered Products up to the Contract Maximum Amount shall be USD $49.99/MWh,” which is equivalent to $0.0499/kWh. Eversource provides the net amount charged to customers through the NBFMCC for the Millstone PPA in its March 1st annual RAM filings. iii ALLCO-037 Question: In its September 18, 2019, Interim Decision in Docket No. 18-05-04, the Authority stated that "the manner in which these Products are resold can impact the value of the Agreements to ratepayers" and directed the EDCs "to thoughtfully consider their options in this area and to pursue those options that maximize such value." Describe each action the Company has taken in response to that directive from 2019 to the present; state whether the Company has ever changed its method of reselling Millstone PPA products; and state whether the disposition of Millstone PPA products is addressed in the Company’s current procurement plan or any pending or planned procurement-plan update.
  4. Page 17 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-080 Page 4 of 4 ALLCO-037 Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. Without waiving said objection, Eversource does not resell the energy from the Millstone PPA; instead, the facility bids the energy into the ISO-NE wholesale market, and it is settled via ISO-NE. Eversource receives its buyer’s percentage entitlement of that settlement. Eversource sells qualified Clean Energy Standard for Existing resources (“CES-E’s”) from the Millstone facility, and the net benefit of those sales is credited to ratepayers via the NBFMCC.
  5. Page 18 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-081 Page 1 of 2 Date Filed: October 01, 2026 Witness: Justin Pelkowski Request from: ALLCO Question: (Follow-up to ALLCO-036.) The response identified two dockets but did not answer the question. State, yes or no, whether the Company has at any time since 2019 analyzed, evaluated, or considered using the energy purchased under the Millstone PPA to serve its standard service or supplier of last resort load in whole or in part; if yes, identify and produce each analysis, evaluation, memorandum, presentation, or communication, and identify by title each person who participated in the decision regarding disposition; if the presentations in Docket Nos. 17-12-03RE10 and 1206-02RE04 are the only responsive materials, produce them in this docket and confirm that no analysis has been performed since. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, as stated in ALLCO-036 i, yes, the Company has presented information regarding the use of energy from the Millstone PPA to serve Standard Service load, the results of which are captured in presentations filed in Docket Nos. 17-12-03RE10, 12-0602RE04, and in an exhibit in 18-05-04. The presentations filed in Docket Nos. 17-12-03RE10 and 12-06-02RE04 are attached as ALLCO-081, Attachment 1, and ALLCO-081, Attachment 2, respectively to this response while the exhibit from Docket No. 18-05-04 is not as it was filed confidentially. No subsequent analysis has been performed. Allco previously litigated the Millstone PPA in the Company’s Docket No. 24-01-03 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to Q-ALLCO-02, Q-ALLCO-03, QALLCO-05, Q-ALLCO-06, Q-ALLCO-07, and Q-ALLCO-21. Eversource objected to each of these questions. 1
  6. Page 19 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-081 Page 2 of 2 Prior Referenced Response: i ALLCO-036 Question: State whether the Company has at any time since 2019 analyzed, evaluated, or considered using the energy purchased under the Millstone PPA to serve its standard service and/or supplier of last resort service load, in whole or in part, rather than reselling that energy into the ISO-New England markets; produce every such analysis, evaluation, memorandum, presentation, or communication; identify, by title, each person who participated in the decision regarding the manner of resale; and state each reason for the disposition method chosen. If no such analysis exists, so state. ALLCO-036 Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. Without waiving said objection, the Company has previously presented information related to utilizing PPAs for Standard Service in Docket Nos. 17-12-03RE10 and 12-06-02RE04.
  7. Page 20 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-082 Page 1 of 2 Date Filed: October 01, 2026 Witness: Laura E. Perbeck Request from: ALLCO Question: (Follow-up to ALLCO-037.) The response described the current arrangement but not the actions the interrogatory asked about. Describe each action the Company has taken from 2019 to the present in response to the Authority’s September 18, 2019 directive in Docket No. 18-05-04 to “thoughtfully consider their options in this area and to pursue those options that maximize such value”; state whether the Company has ever changed the manner of disposition of Millstone PPA products, and if not, whether any change was ever evaluated; and state whether the disposition of Millstone PPA products is addressed in the Company’s current procurement plan or any pending or planned update, identifying the relevant section or stating that it is not addressed. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, each year since the PPA term began in 2019, Eversource has not resold the energy from the Millstone PPA; instead, the facility bids the energy into the ISONE wholesale market, and it is settled via ISO-NE. Eversource receives its buyer’s percentage entitlement of that settlement. Since 2021 Eversource has also sold qualified Clean Energy Standard for Existing resources (“CES-E’s”) from the Millstone facility, and the net benefit of those sales is credited to ratepayers via the NBFMCC. 2 In July 2019, in Docket No. 18-05-04, CT DEEP requested a late file (LFE No. 15) titled: 1 Allco previously litigated the Millstone PPA in the Company’s Docket No. 24-01-03 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-02, ALLCO-03, ALLCO-05, ALLCO-06, ALLCO-07, and ALLCO-21. Eversource objected to each of these questions. 2 As noted in the April 8, 2020, annual RAM filing in Docket No. 20-03-01, Exhibit 3 page 18, Eversource did not purchase nor sell any CES-E’s in 2019; As noted in the March 1, 2021, annual RAM filing in Docket No. 21-0103, Exhibit 3 page 17, Eversource did not sell any CES-E’s in 2020.
  8. Page 21 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-082 Page 2 of 2 Quantification and examples of the impact to the market and the procurement process of using the output from the Millstone PPA as the basis for a full services standard service product in CT (EDC's- Mr. Levitan) In its confidential July 11, 2019, response to LFE No. 15 in Docket No. 18-05-04, Eversource explained the impact on the Standard Service marketplace and price as a result of taking the output under the Millstone PPA and using it for Standard Service. The Company does not maintain a procurement plan; rather, the State’s Procurement Plan is maintained by PURA. PURA is currently reviewing recommendations made by the PURA Procurement Manager’s in Docket No. 12-06-02RE05. PURA posted a draft decision in Docket No. 12-06-02RE05 on September 11, 2026. As part of their draft decision, PURA addressed the use of PPAs for Standard Service.
  9. Page 22 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-083 Page 1 of 2 Date Filed: October 01, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: ALLCO Question: (Follow-up to ALLCO-043.) The response described the calculation of net metering amounts but did not answer subparts (b) and (c). State, yes or no, whether the amounts charged to customers through the NBFMCC for net metering and virtual net metering are reduced or offset by the corresponding reductions in regional transmission charges (RNS, LNS, TAC), capacity obligations, and standard service procurement quantities attributable to the same behind-the-meter generation; if no such offset is made, explain why not; and state the annual amount charged to customers through the NBFMCC for net metering and virtual net metering for each calendar year 2020 through 2025, in native format. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to ALLCO’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, the Company’s response to ALLCO-043 i is responsive to the question. The amounts charged to the NBFMCC for net metering and virtual net metering for each calendar year 2020 through 2025 are part of the public record in the respective Revenue Adjustment Mechanism proceedings in which they are included. Net metering affects wholesale loads, which could impact peak loads. Please refer to the Company’s response to ALLCO-095 which requests information on how behind the meter generation impacts wholesale settlements. Please note that ALLCO-095 will be filed on October 5, 2026. Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-0103 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04 and ALLCO-027. Eversource objected to both of these questions. 1
  10. Page 23 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-083 Page 2 of 2 Prior Referenced Response: i ALLCO-043 Question: Describe how amounts associated with net metering and virtual net metering are calculated and recovered from other customers through the NBFMCC (including the "avoided bill" methodology described by Company witnesses in Docket No. 20-01-01), and state whether the amounts so charged to customers are reduced or offset by the corresponding reductions in regional transmission charges (RNS, LNS, TAC), capacity obligations, and standard service procurement quantities attributable to the same behind-the-meter generation; if no such offset is made, explain why not, and quantify the annual amount charged to customers through the NBFMCC for net metering for each year 2020 through 2025 without any such offset. ALLCO-043 Question: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to ALLCO’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding Without waiving said objection, net metering and virtual net metering amounts included in the NBFMCC are calculated and recorded for inclusion in the NBFMCC, as part of each customer’s monthly bill, in accordance with the tariff rider under which each customer is enrolled. Monthly net metering amounts for the net metering rider involving banked kWh (e.g., Rider N) are calculated by multiplying the portion of a customer’s net metering facility’s energy produced and not used, but that is netted against the energy delivered to that customer from the distribution system by the customer’s prevailing per kWh rates. Any excess monthly energy production not so netted over the course of 12 months is multiplied by the annual average LMP rate to determine a residual amount included in the NBFMCC. For net metering facilities that do not involve kWh banking (e.g., RRES), the amount included in the NBFMCC for each month is calculated by multiplying total energy produced and not used by the customer by the rate set forth pursuant to the net metering tariff rider under which they are enrolled. For virtual net metering (“VNM”), net metering amounts included in the NBFMCC are determined by multiplying the monthly energy production by the prevailing general service rates under which the customer receives electric service, calculated on a per kWh basis, pursuant to the VNM rider.

As listed on the current system

Corres. 10/13/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 8)

This filing on the current system (opens in a new tab)