Discovery Compilation (ALLCO Set 8)
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation October 13 2026.pdf
PDF · 150 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 13 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 13 2026.pdf
ALLCO Set 8_COMBINED.pdf
PDF · 522 KB · 36 pagesText searchable
Download ALLCO Set 8_COMBINED.pdfRead the text of ALLCO Set 8_COMBINED.pdf
Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Page 27 of 36
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-085 Page 2 of 3 response to ALLCO-084 i, the Company does not hold any interconnection-related funds associated with deposits and/or securities by developers and interconnection customers. e. The responses to ALLCO-001 ii and ALLCO-032 iii are referencing two different accounts. The response to ALLCO-001 refers to the CIAC balances in FERC account 252500, whereas the response to ALLCO-032 refers to the Customer Deposit balances in FERC account 235010. Prior Referenced Responses: i ALLCO-084 Question: (Follow-up to ALLCO-032.) The table provided as ALLCO-032, Attachment 1, addresses subpart (c) only as to “Customer Deposits.” Complete the response as to the remaining categories the interrogatory identified: for (a) deposits, prepayments, and security provided by developers and interconnection customers (including amounts paid for interconnection studies, system modifications, and upgrades held pending final accounting), (b) unpaid or unrefunded interconnection final-accounting balances, and (c) over-recovered rate adjustment mechanism balances held prior to return to customers — state, for each: the amounts held as of December 31, 2025 and as of the most recent date available; the interest rate the Company pays or credits on each (or confirm that the rate is zero); the accrual and compounding convention; and the FERC account(s) in which each is recorded. If the Company pays or credits no interest on any category, state the basis for accruing carrying charges at its pre-tax WACC, compounded monthly, on balances customers owe the Company while paying nothing on balances the Company holds for customers. ALLCO-084 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the Company notes that interconnection-related funds are not held in customer deposits. Please refer to the Company’s responses to ALLCO-002i and ALLCO-044i. Further, the Company does not and has not requested deposits, prepayments or security from developers and distribution generation interconnection customers. ii ALLCO-001 Question: Identify each FERC account in which the Company records CIAC and other amounts collected from interconnection customers for interconnection studies, upgrades, and overheads, and state the balance in each such account at the end of each year 2018 through 2025 and as of the most recent month available. ALLCO-001 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit.Page 28 of 36
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-085 Page 3 of 3 Without waiving said objection, the Company records CIAC activity from interconnection customers to FERC Account No. 252500. The table below summarizes the end of year balance in FERC Account No. 252500 from 2018 through June 2026. Year December 2018 December 2019 December 2020 December 2021 December 2022 December 2023 December 2024 December 2025 June 2026 iii Balance ($5,569,769) ($5,038,280) ($9,076,090) ($25,399,399) ($11,263,859) ($7,796,182) ($10,334,276) ($23,605,408) ($28,277,769) ALLCO-032 Question: With respect to every carrying charge, return on unamortized balance, or similar time-value amount the Company proposes to collect from customers in this docket — including the approximately $396.7 million of carrying charges on 2018-2023 storm costs and $27.6 million on 2024-March 2025 storm costs (Exhibit CLP-REVREQ-2 (Storms A) and (Storms B)), carrying charges on deferred assets, and carrying charges proposed on RAM, decoupling, and SCRAF over/under-recoveries: (a) state the rate applied, whether it is pre-tax or after-tax, the compounding convention, the date from which carrying charges accrue, and the balance to which the rate is applied (including whether the balance is net of customer contributions, insurance recoveries, and amounts disallowed in any docket); (b) identify the statute, regulation, or PURA decision authorizing each (Allco does not repeat OCC-522, which addresses the choice of index for SCRAF carrying charges); and (c) separately identify every context in which the Company holds funds of customers or third parties — including customer deposits, developer and interconnectioncustomer deposits and security, unpaid interconnection refunds, and over-recovered rate adjustment mechanism balances — and state the interest rate the Company pays (or credits) on each, so that the rates the Company charges when it is owed money can be compared with the rates it pays when it owes money. ALLCO-032 Response: Please refer to ALLCO-032, Attachment 1, for the requested information. Please refer to the Company’s response to OCC-522.Page 29 of 36
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-086 Page 1 of 3 Date Filed: October 01, 2026 Witness: Laura E. Perbeck Request from: ALLCO Question: (Follow-up to ALLCO-038.) A referral to a public webpage and seven annual dockets is not an answer, and the remaining components are not public. Provide, in a single native-format table for each calendar year 2019 through 2025: (a) the Company’s standard service and supplier of last resort load in MWh and the average all-in supply cost per kWh paid to wholesale suppliers for that load (the figures the Company’s referral sources contain, compiled); (b) the MWh of the Company’s Buyer’s Percentage Entitlement of Millstone PPA products actually delivered or settled, by month; (c) the effective all-in price per MWh actually paid under the Millstone PPA, identifying any component other than the $49.99/MWh contract price; and (d) the net amount charged or credited to customers through the NBFMCC in respect of the Millstone PPA, by year. Produce the hourly (or most granular available) Millstone delivery quantities and standard service load data in native format. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, while Eversource’s response to ALLCO-038 was responsive to the question asked, 2 Eversource provides the following additional information as requested: Allco previously litigated the Millstone PPA in the Company’s Docket No. 24-01-03 Rate Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-02, ALLCO-03, ALLCO-05, ALLCO-06, ALLCO-07, and ALLCO-21. Eversource objected to each of these questions. 2 As stated in ALLCO-038, historical load data can be found on the following website: https://www.eversource.com/residential/about/doing-business-with-us/energy-suppliers/connecticut-wholesalesupply. This website is utilized by Standard Service suppliers who are interested in historical data so that they can develop bids in Standard Service solicitations. Less than halfway down the page, there is a section labeled, “Historical Resources (2023-Present).” There files can be downloaded by year with the 8760 load data. All approved rates that were paid to Standard Service and Last Resort Service Providers are already a part of the public record, and each of the docket numbers listed in ALLCO-038 contain those final PURA approved rates for each rate class for the applicable period. 1Page 30 of 36
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-086 Page 2 of 3 (a) Please refer to ALLCO-86, Attachment 1. (b) Eversource provides the annual MWh purchased under the Millstone PPA in its annual RAM filings in compliance with Order No. 5 of PURA’s November 22, 2019, 3rd Interim Decision in Docket No. 18-05-04. Below is a list of each docket, filing, exhibit, and page of the annual RAM filings where the information is located: Year 2019 2020 2021 2022 2023 2024 2025 RAM Docket No. 20-03-01 21-01-03 22-01-03 23-01-03 24-01-03 25-01-03 26-01-03 Filing Location Date Filed Exhibit 3 pg. 18 Exhibit 3 pg. 18 Exhibit 3 pg. 17 Exhibit F pg. 17 Exhibit F pg. 17 Exhibit F pg. 17 Exhibit F pg. 17 4/8/20 3/1/21 3/1/22 3/1/23 3/1/24 3/3/25 3/2/26 The Company cannot provide Millstone’s monthly/hourly generation information publicly as this is considered non-public, market-sensitive third-party data per the FERC-approved ISO-NE tariff. (c) Eversource provided this information in response to ALLCO-038 i and directly quoted the PPA that identifies the price for all Products as $49.99/MWh. (d) Eversource provides the monthly and annual net amount charged or credited to customers through the NBFMCC in respect of the Millstone PPA in its annual RAM filings. Below is a list of each docket, filing, exhibit, and page of the annual RAM filings where the information is located: Year 2019 2020 2021 2022 2023 2024 2025 RAM Docket No. 20-03-01 21-01-03 22-01-03 23-01-03 24-01-03 25-01-03 26-01-03 Filing Location Date Filed Exhibit 3 pg. 3 Exhibit 3 pg. 3 Exhibit 3 pg. 3 Exhibit F pg. 3 Exhibit F pg. 3 Exhibit F pg. 3 Exhibit F pg. 3 4/8/20 3/1/21 3/1/22 3/1/23 3/1/24 3/3/25 3/2/26Page 31 of 36
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-086 Page 3 of 3 Prior Referenced Response: i ALLCO-038 Question: For each year 2019 through 2025: state (a) the Company’s total standard service and supplier of last resort service load (MWh) and the average all-in supply cost per kWh the Company paid to wholesale suppliers for that load; (b) the average cost per kWh of energy purchased under the Millstone PPA; and (c) the net amount charged to customers through the NBFMCC in respect of the Millstone PPA for that year; and produce data sufficient to calculate, for each such year, the net impact on customers had the Company used Millstone PPA energy to serve standard service and supplier of last resort service load up to the lesser of the Millstone PPA quantities or that load (accounting for the residual quantities that would still have been resold into the market), including hourly standard service load data and hourly Millstone PPA delivery quantities in native format. ALLCO-038 Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. Without waiving said objection, the Company’s Standard Service loads can be found on the following website: https://www.eversource.com/residential/about/doing-business-with-us/energy-suppliers/connecticut-wholesalesupply. The supply costs paid to suppliers can be found in the following dockets: 2019-01-01; 2020-01-01; 2021-0101; 2022-01-01; 2023-01-01; 2024-01-01; 2025-01-01. As noted in the Millstone PPA, “The Price for the Buyer’s Percentage Entitlement of Delivered Products up to the Contract Maximum Amount shall be USD $49.99/MWh,” which is equivalent to $0.0499/kWh. Eversource provides the net amount charged to customers through the NBFMCC for the Millstone PPA in its March 1st annual RAM filings.Page 32 of 36
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-087 Page 1 of 2 Date Filed: October 01, 2026 Witness: Andrew C. Belden Request from: ALLCO Question: (Follow-up to ALLCO-040.) The response omitted the decision-making the interrogatory asked about. Identify, by title, each person or group who determines whether a distribution-connected resource under five megawatts is registered in ISO-New England or treated as an unregistered load reducer, and state the criteria applied; identify and produce every analysis, evaluation, or quantification the Company has performed of the customer-cost consequences of registering versus not registering such resources — including any analysis underlying the position PURA approved in Docket No. 20-07-01 and any quantification of the “benefits for customers” the response describes — or state that no such analysis exists; and identify each exception to the Company’s “general practice,” i.e., each distribution-connected resource under five megawatts that is or has been registered in the ISO-New England markets since 2020, stating its size, program, and the reason for registration. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, there is not an individual or group that determines whether a distribution-connected resource under five megawatts is registered in ISO-NE or treated as an unregistered load reducer. It has been general Company practice to not register resources under 5 MW, and this approach has been acknowledged and accepted by PURA. Registering versus not registering distributed generation does not change the underlying operation of a distributed generation resource or its physical impact to the electric power system. The reduction to wholesale load obligations described as a customer benefit in the Company’s response to ALLCO-040 is equal to the excess generation from unregistered resources. If a distributed Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-01 03 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04 and ALLCO-027. Eversource objected to both of these questions. 1Page 33 of 36
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-087 Page 2 of 2 generation resource was registered, the same amount of energy would be sold within the wholesale market and resulting revenues credited to customers through operation of the Rate Adjustment Mechanism. Please refer to the Company’s response to ALLCO-089 i for the single example of a registered distributed generation facility. Prior Referenced Response: i ALLCO-089 Question: (Follow-up to ALLCO-042.) Identify each resource constituting an exception to “substantially all” — that is, each eligible resource under five megawatts that was registered in ISO-New England rather than treated as an unregistered load reducer at any time during 2020 through 2025 — stating for each its nameplate capacity, program or contract, the period of registration, and the reason; and state whether the Company has ever evaluated, or been requested by any customer, developer, or agency to evaluate, changing the registration status of any category of such resources, identifying each evaluation or request and its disposition. ALLCO-089 Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding.1 Without waiving said objection, 750 kW solar photovoltaic (PV) facility enrolled in the Virtual Net Metering Rider is registered as a settlement only generator at the request of the customer. The Company receives 100% of the energy revenue from the facility through the ISO-NE Market Settlement System, and these proceeds are credited to customers through the Rate Adjustment Mechanism.Page 34 of 36
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-088 Page 1 of 2 Date Filed: October 08, 2026 Witness: Andrew C. Belden and Justin Pelkowski Request from: ALLCO Question: (Follow-up to ALLCO-041.) The components below require no counterfactual and are in the Company’s possession. Provide, for each calendar year 2020 through 2025, in native format: (a) the Company’s reported Real-Time Load Obligation, by month; (b) the Company’s monthly coincident-peak (12-CP) values used for RNS, LNS, and TAC billing; (c) the Company’s capacity load obligation and installed capacity requirement values; (d) the estimated or metered aggregate output of distribution-connected resources under five megawatts at each monthly system peak hour — including any behind-the-meter generation estimates or profiles the Company or its affiliates use in load forecasting, standard service procurement, or ISO-NE load reporting (including any ISO-NE behind-the-meter photovoltaic estimates the Company relies on); and (e) each document in which the Company or any affiliate has estimated the effect of behind-the-meter or loadreducing generation on peaks, load obligations, or transmission billing determinants. If the Company contends it possesses no data responsive to subpart (d), state whether output at peak could be derived from its PowerClerk records, production meters, or forecasting models, and why it has not done so. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, (a) Please refer to the Company’s response to ALLCO-063 i. (b) Please refer to CIEC-020, Attachment 1. Allco previously litigated the Millstone PPA in the Company’s Docket No. 24-01-03 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-02, ALLCO-03, ALLCO-05, ALLCO-06, ALLCO-07, and ALLCO-21. Eversource objected to each of these questions. 1Page 35 of 36
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-088 Page 2 of 2 (c) Because the Company does not serve load it does not have capacity obligations. (d) Refer to ALLCO-088, Attachment 1, for estimated output of distribution-connected resources under five megawatts at each monthly ISO-NE peak hour. (e) The Company has not expressly estimated the effect of behind-the-meter or load-reducing generation on peaks, load obligations, or transmission billing determinants. Prior Referenced Response: i ALLCO-063 Question: For each month of the Test Year, produce the ISO New England settlement statements (including any resettlements) for the Company’s load asset(s), showing the kilowatt-hours of Real-Time Load Obligation charged or settled to the Company, and state the monthly and annual settled kilowatt-hour totals. Reconcile the annual ISO-NE settled kilowatthours to a) the total retail kilowatt-hours billed to all customers (Q-ALLCO-061) and b) the kilowatt-hours billed to standard-service customers (Q-ALLCO-062), separately itemizing and quantifying each reconciling item — including distribution losses, transmission losses, unaccounted-for energy, company use, station service, unbilled or estimated usage, and any other category — and stating the loss factor(s) applied at each stage and their source. Identify the system(s) and process by which the Company performs retail load settlement, and identify (by title, date, and custodian) every internal load-settlement, unaccounted-for-energy, or loss-study report prepared or updated for any period including the Test Year. ALLCO-063 Response: The Company does not serve load and therefore does not receive settlement statements for any load assets. In addition, wholesale loads for Standard Service, Last Resort Service and retail supply are not relevant to the adjudication of the Company’s proposed retail distribution revenue requirement in this rate case or retail customer loads. Nevertheless, for informational purposes please refer to ALLCO-063, Attachment 1, for the 2025 ISO-NE wholesale loads for Standard Service, Last Resort Service, and competitive supply. In addition to the fact that the above-described wholesale loads are not relevant to the adjudication of the Company’s proposed retail distribution revenue requirement in this rate case or retail sales, the Company also notes that it cannot readily reconcile wholesale load data with Test Year data due to rate class level data being based on monthly billing cycles at the customer meter, which vary for every customer, and wholesale load data being calendar month, summed by hour, and aggregated by competitive supplier at the wholesale level.Page 36 of 36
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-08 Date Issued September 17, 2026 ALLCO-089 Page 1 of 1 Date Filed: October 01, 2026 Witness: Andrew C. Belden and Justin Pelkowski Request from: ALLCO Question: (Follow-up to ALLCO-042.) Identify each resource constituting an exception to “substantially all” — that is, each eligible resource under five megawatts that was registered in ISO-New England rather than treated as an unregistered load reducer at any time during 2020 through 2025 — stating for each its nameplate capacity, program or contract, the period of registration, and the reason; and state whether the Company has ever evaluated, or been requested by any customer, developer, or agency to evaluate, changing the registration status of any category of such resources, identifying each evaluation or request and its disposition. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, 750 kW solar photovoltaic (PV) facility enrolled in the Virtual Net Metering Rider is registered as a settlement only generator at the request of the customer. The Company receives 100% of the energy revenue from the facility through the ISO-NE Market Settlement System, and these proceeds are credited to customers through the Rate Adjustment Mechanism. Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-01 03 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04 and ALLCO-027. Eversource objected to both of these questions. 1
As listed on the current system
Corres. 10/13/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 8)