Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

Files4

Search terms highlighted
Eversource rate increase is on 35 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
  1. Page 1 of 61

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-090 Page 1 of 6 Date Filed: October 05, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: ALLCO Question: Reconcile the Company’s responses to EOE-164, and EOE-166. EOE-166, describes contractexecution controls in Ariba, automated purchase-order logic in Ariba and Maximo linking every purchase order over $50,000 to an active contract, sole-source justification, or approved exception, dual sign-offs, and year-to-date compliance metrics tracked by the procurement group. EOE-164, states that milestone payments “are not maintained as a separately reportable procurement attribute.” State: (a) whether milestone or advance payment terms are recorded in the Ariba contract records or payment schedules for the contracts they govern; (b) whether the Ariba and Maximo systems can be queried or reported on by payment-term attributes, and if not, what payment-term data those systems store; and (c) produce the listing EOE-164, declined to provide — each procurement since January 1, 2020 that included milestone or advance payments, with the vendor, contract amount, milestone payment amounts and schedule, and the amount paid in advance of work performed or costs incurred — deriving it from the systems described in EOE166; or, if the Company maintains that this cannot be done, explain how a compliance assertion of “no policy violations” across 50,323 purchase orders can be validated by systems from which basic payment-term attributes cannot be reported. Response: As it relates to the controls identified in the Company’s response to EOE-166 i, those controls are related to purchase-order compliance with the competitive bidding requirement for transactions valued at greater than $50,000 and the approval of Ariba contracts. When a purchase order is released, systemic logic evaluates whether the purchase order is linked to an active Ariba contract or an approved Maximo sole-source justification. If neither linkage is present and the purchase order exceeds $50,000, the purchasing agent must then select an approved exception or identify the transaction as a policy violation before the purchase order can proceed. The Maximo purchase-order control therefore evaluates whether a purchase order subject to the release logic is associated with: (1) an active Ariba contract; (2) an approved Maximo sole-source justification; (3) an approved exception to the competitive-bidding requirement; or (4) a policyviolation designation. The applicable pathway requires sign-off by the purchasing agent and the agent’s supervisor.
  2. Page 2 of 61

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-090 Page 2 of 6 The statement in EOE-166 that there were no policy violations among 50,323 released purchase orders means that none of those purchase orders were released with a policy-violation designation based on the specific system logic and fields evaluated by the control. The metric separately identified 294 approved exceptions at the purchase-order level. The statement was not intended to represent that each of the 50,323 purchase orders was reviewed for compliance with every procurement-policy, contractual or payment requirement. This control is only one component of the Company's broader procurement compliance and oversight framework. Separately, prior to execution of an Ariba contract, purchasing agents and designated approvers are required to upload or verify supporting documentation to validate compliance with applicable competitive-bidding requirements. That contract-level review confirms the applicable procurement pathway and supporting documentation without requiring milestone or advance payment provisions to be captured as separately reportable system attributes. The Maximo purchase order release control does not evaluate contract-specific payment structures, including milestone or advance payment provisions, and does not depend on those provisions being maintained as separately reportable system attributes. Accordingly, there is no inconsistency between the EOE-166 description of the purchase-order release control and the EOE-164 ii statement that milestone-payment provisions are not maintained as a separately reportable procurement attribute. a. Milestone payment schedules may be included in the underlying contract documentation, which may take the form of an Ariba Contract or a Maximo Purchase Order. Advance payment provisions may be recorded in the same types of governing or supporting documents. The location and format of the applicable provision may vary based on the structure of the transaction and its governing documents. Milestone or advance-payment information is not maintained as a separately reportable or trackable data field within Ariba or Maximo because this type of information is most common to larger materials purchases or to engineering work pertaining to custom materials. As a result, this type of information is not generally applicable to the bulk of the Company’s contracts. For efficiency and effectiveness, Ariba and Maximo store payment-term information as necessary to support procurement and accounts payable processes. b. The standard payment term, referring to the field that generally establishes how long after invoice receipt a payment should be made, is maintained within the Company's procurement system. It is generally established at the vendor level, although it may be modified at the purchase-order or contract level in limited circumstances where appropriate. A standard payment term generally establishes when payment is scheduled following invoice receipt. By contrast, a milestone or advance-payment provision may establish the
  3. Page 3 of 61

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-090 Page 3 of 6 contractual events or conditions governing when an invoice may be submitted or payment becomes due. These provisions are generally contained in contract documentation rather than a discrete data field in Ariba or Maximo. Where milestone or advance payments are contemplated, invoice processing would generally be supported through business-approval workflows conducted in accordance with the applicable contract and Delegation of Authority requirements. These payments require approval by the appropriate invoice approver and, where applicable, additional approvers based on the relevant thresholds. The review relies on the approver’s understanding of the contract terms and confirmation that the applicable conditions have been satisfied. Accordingly, the Company’s systems maintain payment terms as necessary for transaction processing, which the business uses. The Company’s systems are not designed to create an all-encompassing inventory of procurement transactions containing milestone or advance-payment provisions that is not necessary for the business. c. Compilation of the requested listing would require a manual review of the relevant contracts, purchase orders, statements of work, amendments, payment schedules, invoices, and supporting documentation, which is not an analysis that the Company needs or utilizes for its own purposes. The existence of an Ariba contract or Maximo purchase order does not necessarily indicate that the transaction contains such a provision or its associated amount and schedule. In most instances, advance- or milestone-related payments are intended to support supplier costs associated with engineering, materials, or other contractually required investments in Company projects. A contract may also provide for a payment or payment commitment to secure production capacity, long lead materials, or manufacturing slots. The amount of “paid in advance of work performed or costs incurred” therefore cannot necessarily be determined from a payment schedule alone. That determination requires a transaction-specific comparison of contract terms, invoices, payment records, supporting documentation, and the status of supplier performance or costs at the time of payment. The Company's response to EOE-166 does not rely upon the identification or reporting of milestone-payment provisions, advance-payment arrangements, or other contract-specific payment structures. Rather, the compliance metric referenced in EOE-166, relates to a control designed to verify that purchase orders exceeding $50,000 are supported by are processed through (1) an Ariba contract, (2) an approved Maximo sole-source justification, or (3) an approved exception to the competitive-bidding requirement or (4) identification as a policy violation. The separate Ariba contract execution process requires the upload or verification of supporting procurement documentation; however, that requirement does not
  4. Page 4 of 61

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-090 Page 4 of 6 create a separately reportable field identifying milestone- or advance-payment provisions, as this information is not necessary for the business. The EOE-166 metric can therefore be validated through the system fields, workflow statuses and approvals evaluated by the purchase-order release control. That validation does not depend on milestone or advance payment provisions being separately reportable. Conversely, the control is not intended to evaluate compliance with those contract-specific payment provisions. Accordingly, the Company’s statement that there were no policy violations means that no purchase orders were released with a policy-violation designation based on the defined release-control logic. It does not speak to compliance with milestone payments, advance payments, or other requirements outside the control’s scope or that are monitored by the Company through other processes. Prior Referenced Response: i EOE-166 Question: (COMPETITIVE BID ASSESSMENTS) Respond to the following: a. b. Explain how the Company ensures that each purchase order or contract is subject to a competitive bid assessment, sole source justification, or an approved exception. As part of the response, please discuss whether there are any systemic controls, including the use of Ariba, that ensure adherence to these requirements and, if applicable, provide an example of the referenced controls. Explain how the Company ensures adherence to the Company’s competitive bid requirements for situations where multiple purchase orders or contracts could be used in lieu of the referenced controls discussed in subsection a. EOE-166 Response: a. The Company enforces adherence to competitive bid assessments, sole source justifications, and approved exceptions through integrated governance policies and automated controls within Ariba and Maximo: • Contract Execution Controls: Prior to executing an Ariba Contract, purchasing agents and designated approvers are required to upload or verify appropriate supporting documentation into the system to validate compliance. Automated Purchase Order (PO) Systemic Logic: When a PO is released, system logic automatically verifies that it is linked to either an active Ariba Contract or an approved Maximo Sole Source Justification. If neither control is present and the PO is valued at more than $50,000, the system prevents processing until the agent selects an approved exception or flags the record as a policy violation. • Both pathways require formal dual sign-off from the agent and their supervisor. For exceptions a standardized comment nomenclature is expected.
  5. Page 5 of 61

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-090 Page 5 of 6 The image below, details the year-to-date metrics tracked by the procurement group on exceptions and violations across the procurement organization, including records supporting CL&P and other affiliates. To date, out of 50,323 Purchase Orders released by the Procurement Team, there were no policy violations and 294 represented exceptions taken at the PO level. b. ii The Company actively prevents purchase order "stringing" which is the practice of splitting orders to bypass competitive bidding thresholds, where the practice is inappropriate. In some cases, purchase orders may be used to accommodate valid operational requirements (such as distinct delivery sites, scopes of work, or material types): • Agent Oversight & Pattern Detection: Procurement agents evaluate non-contracted POs during the approval workflow. Agents monitor indicators of stringing by cross-referencing requisitions with similar service descriptions, identical supplier selections, and matching accounting strings across multiple orders. • Centralized Spend Coverage: Over 90% of Company spend is governed by master Ariba Contracts. Establishing spend under Ariba Contracts naturally mitigates the risk of PO-level stringing, as individual POs draw down from existing contracts that were approved to DOA systematically. EOE-164 Question: (MILESTONE PAYMENTS) Refer to Response to EOE-056. The Company’s response stated that the “Company does not generally support milestone payments prior to work being performed or costs being incurred by the Company’s vendor…” Provide a listing of all procurements that included milestone payments, along with the rationale for why the payments were permitted. As part of the response, please identify the vendor, the contractual amount, and the payment amount that would be at risk. EOE-164 Response: Milestone payments are not maintained as a separately reportable procurement attribute. Milestone payment terms, where applicable, are permitted on a case-by-case basis as described in the Company’s response to EOE-056i.
  6. Page 6 of 61

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-090 Page 6 of 6 Milestone payments may be permitted where appropriate, based on the nature of the goods or services being procured and the applicable commercial terms. Any characterization of an amount that would be “at risk” would depend upon the specific contractual provisions, milestone that was completed, and other facts applicable to the individual procurement and payment.
  7. Page 7 of 61

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-091 Page 1 of 5 Date Filed: October 13, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: ALLCO Question: With respect to the year-to-date metrics presented as an image in the response to EOE-166: produce the underlying data in native format — for each of the 294 exceptions, the purchase order number, vendor, amount, exception reason or standardized comment nomenclature, and the approving agent and supervisor; provide the same data for each record flagged as a policy violation (if any) for 2024, 2025, and 2026; and state whether corresponding metrics exist for 2023 and earlier years and produce them if so. Response: The current exception-tracking report was newly developed and implemented as a management tool. The report reflects purchase orders released during the 2026 year-to-date period and was the source of the metrics presented in the Company’s response to EOE-166 i. While procurement records and purchase-order data exist for prior years, the specific exception-categorization methodology, reporting fields, and compliance-reporting structure utilized in the current report were not maintained in the same format prior to September 2025. As a result, comparable historical metrics are not available in the same manner. Please refer to the Company's response to EOE-046 ii and accompanying attachments for the underlying data requested relative to this rate case. The Company is compiling the details associated with the identified exceptions through a manual review of the applicable procurement records, including the purchase-order number, vendor, amount, nature of the exception, applicable comment, and approval information, and supporting documentation where available. To the extent a requested field is not contained in the current report as a discrete field, the Company is deriving the responsive information from the applicable procurement records where reasonably available. Prior Referenced Response: i EOE-166 Question: (COMPETITIVE BID ASSESSMENTS) Respond to the following: a. Explain how the Company ensures that each purchase order or contract is subject to a competitive bid assessment, sole source justification, or an approved exception. As part of the response, please discuss whether there are any systemic controls, including the use of Ariba, that ensure adherence to these requirements and, if applicable, provide an example of the referenced controls. b.
  8. Page 8 of 61

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-091 Page 2 of 5 Explain how the Company ensures adherence to the Company’s competitive bid requirements for situations where multiple purchase orders or contracts could be used in lieu of the referenced controls discussed in subsection a. EOE-166 Response: ii a. The Company enforces adherence to competitive bid assessments, sole source justifications, and approved exceptions through integrated governance policies and automated controls within Ariba and Maximo: • Contract Execution Controls: Prior to executing an Ariba Contract, purchasing agents and designated approvers are required to upload or verify appropriate supporting documentation into the system to validate compliance. • Automated Purchase Order (PO) Systemic Logic: When a PO is released, system logic automatically verifies that it is linked to either an active Ariba Contract or an approved Maximo Sole Source Justification. If neither control is present and the PO is valued at more than $50,000, the system prevents processing until the agent selects an approved exception or flags the record as a policy violation. Both pathways require formal dual sign-off from the agent and their supervisor. For exceptions a standardized comment nomenclature is expected. The image below, details the year-to-date metrics tracked by the procurement group on exceptions and violations across the procurement organization, including records supporting CL&P and other affiliates. To date, out of 50,323 Purchase Orders released by the Procurement Team, there were no policy violations and 294 represented exceptions taken at the PO level. b. The Company actively prevents purchase order "stringing" which is the practice of splitting orders to bypass competitive bidding thresholds, where the practice is inappropriate. In some cases, purchase orders may be used to accommodate valid operational requirements (such as distinct delivery sites, scopes of work, or material types): • Agent Oversight & Pattern Detection: Procurement agents evaluate non-contracted POs during the approval workflow. Agents monitor indicators of stringing by cross-referencing requisitions with similar service descriptions, identical supplier selections, and matching accounting strings across multiple orders. • Centralized Spend Coverage: Over 90% of Company spend is governed by master Ariba Contracts. Establishing spend under Ariba Contracts naturally mitigates the risk of PO-level stringing, as individual POs draw down from existing contracts that were approved to DOA systematically. EOE-046 Question: (PROCUREMENT PROCEDURES) Provide copies of the Company’s procurement-related policies, procedures, and guidance including details regarding the Company’s competitive bid requirements. Provide all versions from 2018 to present and identify any changes that have occurred. Furthermore, specify the materiality of annual (or total) projected
  9. Page 9 of 61

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-091 Page 3 of 5 spend that requires a competitive bid analysis, the minimum number of proposals, and the frequency of updates. Additionally, identify the requirements for permitting any single source vendors. EOE-046 Response: The Procurement Policy and Procurement Manual collectively set the general requirements for competitive bidding, sole source procurement, documentation and governance and are provided as attachments to this response, as designated below. Copies of these documents, including all versions in effect from 2018 through the present reflect documented revision histories identifying material changes. The Procurement Manual is reviewed at least annually. The Procurement Policy is reviewed periodically and updated as needed to reflect governance, compliance and operational changes. Revisions are formally documented with revision numbers and effective dates. Summary of Procurement Policy Updates (2018 – Present): • Rev. 1 (12/21/2015): Eversource rebranding and revisions to both the Guideline and Selection Process sections. Refer to EOE-046, Attachment 1. Note: EOE-046, Attachment 1, includes both revisions 1 and 2. • Rev. 2 (03/18/2019): Introduced explicit policy requirements governing the selling and disposition of surplus material, including procurement oversight and documentation controls. Refer to EOE-046, Attachment 1. • Rev. 3 (02/07/2020): Expanded and clarified the Guidelines section to reinforce procurement controls and promote consistency in sourcing and contracting practices. Refer to EOE-046, Attachment 2. • Rev. 4 (08/22/2024): Updated language in the Supplier Selection and Bidding Sections. Refer to EOE-046, Attachment 3. • Rev. 5 (05/07/2025): Updated the Guidelines section. Refer to EOE-046, Attachment 4. • Rev. 6 (08/14/2025): Comprehensive Policy revision to align with IOUs best practices, enhance key controls, and clarify roles/responsibilities. Refer to EOE-046, Attachment 5. • Rev. 7 (11/12/2025): Updated link to the Procurement Manual. • Rev. 8 (06/01/2026): Clarified Policy Scope regarding the procurement operating model and updated document references/hyperlinks. Refer to EOE-046, Attachment 6. The current and requested versions of the Procurement Manual (Attachments 7-21), with the summary of updates below: • Rev.17 (02/04/2019) – Updated the Procurement Manual to reflect organizational title changes and clarify procurement roles and responsibilities. Additional revisions were made to modernize procurement processes, including implementation of electronic sole source workflows, third-party COI administration, updates to contractor safety requirements to alignment with corporate compliance standards. Refer to EOE-046, Attachment 7. • Rev.18 (01/01/2020) – Updated the Procurement Manual to incorporate NERC CIP compliance requirements for Bulk Electric Systems (BES) and Cyber Systems procurements. Enhanced IT security documentation requirements. Refer to EOE-046, Attachment 8. • Rev.19 (03/04/2020) – Updated the Procurement Manual to reflect organizational title changes, including revision of the Procurement Director designation. Added active reference link to the Contractor CIP Compliance Agreement and expanded Diverse Supplier definitions. Refer to EOE-046, Attachment 9. • Rev.20 (07/08/2021) – Updated to align with executive titles with current organizational structure, enhance and refine Diverse Supplier classifications, modernize sourcing terminology, reorganize non-competitive
  10. Page 10 of 61

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-091 Page 4 of 5 procurement exceptions, and strengthen Sole Source approval requirements. Refer to EOE-046, Attachment 10. • Rev.21 (11/16/2021) – Updated the Procurement Manual to correct internal section references and align cross-references within the Supplier Diversity and Disqualification sections. Refer to EOE-046, Attachment 11. • Rev.23 (05/10/2022) – Updated the Procurement Manual to enhance Sole Source governance controls, including expanded executive approval requirements and additional documentation obligations requiring disclosure of sourcing deviations and supplier personnel with prior Eversource employment. Clarified competitive bid exception language and updated Compliance section terminology. Refer to EOE-046, Attachment 12. • Rev.24 (09/27/2023) – Updated the Procurement Manual to align Supplier Diversity and Subcontracting Plan requirements with federal government contracting thresholds, clarifying applicability for agreements unique to Eversource’s federal contracts and adjusting documentation requirements accordingly. Refer to EOE-046, Attachment 13. • Rev.25 (02/9/2024) – Updated the Procurement Manual to strengthen Sole Source requirements and clarify non-competitive procurement exceptions. Refer to EOE-046, Attachment 14. • Rev.26 (06/13/2024) – Updated the Procurement Manual to enhance Competitive Bid requirements, including pricing review requirements for multi-supplier awards. Refer to EOE-046, Attachment 15. • Rev.27 (08/14/2024) – Updated the Procurement Manual to strengthen Competitive Bid requirements, clarify non-competitive bid exceptions, refine contract definitions, and remove the Capital Approvals process. Refer to EOE-046, Attachment 16. • Rev.28 (10/15/2024) – Updated the Procurement Manual to add an Original Equipment Manufacturer (OEM) non-competitive bid exception. Refer to EOE-046 Attachment 17. • Rev.29 (12/11/2024) – Updated the Procurement Manual to align procurement requirements with applicable state and federal contracting laws and regulations. Refer to EOE-046, Attachment 18. • Rev.30 (08/15/2025) – Updated the Procurement Manual to comprehensively revise procurement governance, strengthen competitive bidding, negotiation, and approval requirements, clarify procurement roles and buying channels, and incorporate requirements for contracts, cybersecurity, data privacy, and policy compliance. Refer to EOE-046, Attachment 19. • Rev.31 (01/21/2026) – Updated the Procurement Manual to clarify restrictions on supplier participation in pre-solicitation activities and establish Director of Procurement approval requirements. Refer to EOE-046, Attachment 20. • Rev.32 (07/09/2026) – Updated the Procurement Manual to strengthen commercial negotiation and communication requirements, clarify procurement responsibilities and sourcing controls, expand Normal Goods and Services categories, and enhance supplier conflict-of-interest provisions. Refer to EOE-046, Attachment 21. Competitive Bid Requirements: Materiality for competitive bidding purposes is not based on a percentage of annual projected spend, but rather on an individual transaction-level threshold. Pursuant to the Procurement Policy and Procurement Manual, all procurement transactions for Normal Goods and Services with an individual value exceeding $50,000 must be supported by one of the following: 1. A Competitive Bid Note: Framework agreements that were competitively bid may have individual transactions over the $50,000 threshold that do not require additional bidding activities. 2. An Approved Sole Source Justification: Supported by an executed Sole Source Justification form or an approved Sole Source Desktop Requisition (DR) in Maximo.
8 pages match
26 pages match

As listed on the current system

Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).