Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).
Files4
Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 14 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
ALLCO Set 9 COMBINED.pdf
PDF · 746 KB · 61 pagesText searchable
Download ALLCO Set 9 COMBINED.pdfRead the text of ALLCO Set 9 COMBINED.pdf
OCC Set 19_COMBINED.pdf
PDF · 1.4 MB · 141 pagesText searchable
Download OCC Set 19_COMBINED.pdfRead the text of OCC Set 19_COMBINED.pdf
OCC Set 20 COMBINED.pdf
PDF · 1.0 MB · 98 pagesText searchable
Download OCC Set 20 COMBINED.pdfRead the text of OCC Set 20 COMBINED.pdf
Page 11 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-091 Page 5 of 5 3. A Documented Exception: Completed using the Procurement Exception Template (for Contracts) or designated exception logging (for Purchase Orders) based on authorized criteria in the Procurement Manual. Note: The requirement to document the exception was introduced in August of 2025. Supporting documentation must be retained in the applicable General File in accordance with records retention requirements. Minimum Number of Proposals: The Procurement Manual requires that competitive bids include multiple suppliers and, where feasible, at least three (3) bidders for transactions exceeding $50,000. However, there is no strict mandate that a minimum number of completed proposals must be received. The requirement to invite at least three bidders applies to the extent practicable based on: • Market availability • Technical qualifications • Prequalification status Requirements for Permitting Single / Sole Source Vendors: For transactions exceeding $50,000, sole source procurement is permitted when a review of the marketplace demonstrates that only one viable Supplier is technically and commercially capable of providing the required goods or services. All Sole Source transactions must be supported by a Sole Source Justification containing: • A detailed commercial and technical narrative describing why no other viable source can meet requirements. • An explanation of why competitive bidding cannot be conducted and efforts made to examine vendor qualifications. • Required management approvals in accordance with the approval hierarchy in effect at the time of the transaction Sole source justifications must be retained in the electronic ordering system (Maximo) as part of the Desktop Requisition or in the Ariba General File as part of the procurement record.Page 12 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-092 Page 1 of 5 Date Filed: October 05, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: ALLCO Question: With respect to purchase orders below the competitive-bid threshold: (a) state whether the Ariba or Maximo controls described in EOE-166, include any systemic detection of multiple purchase orders to the same vendor that individually fall below the $50,000 threshold but aggregate above it, and if not, state whether and how the “no policy violations” assertion accounts for such aggregation; (b) identify each vendor that received three or more purchase orders, each below $50,000, aggregating to more than $150,000 within any rolling twelve-month period during 2023 through 2026, or produce the purchase-order data (vendor, PO number, date, amount) from which that identification can be made; and (c) identify each instance in which the procurement group, the compliance function, or the Internal Audit Department has identified the use of multiple purchase orders or contracts in lieu of competitive bidding or higher-level approval, and the disposition of each. Response: a. The controls described in EOE-166 do not include an automated system control designed to identify multiple purchase orders to the same vendor that individually fall below the competitive bid threshold but, in the aggregate, exceed that threshold over a rolling period. Compliance with the Company's Anti-Circumvention governance provision outlined in the Delegation of Authority Policy is supported by Requisition Approval Requirements within each business unit and further supported by the review and approval process performed by procurement personnel. The Company consistently enhances its procurement oversight processes and reinforces applicable requirements through training and periodic review activities. As it relates to the Control identified in EOE-166 i, that specific control is related to purchase order compliance with the competitive bidding requirement for transactions valued at greater than $50,000. The control is not intended or designed to be all encompassing. Instead, it is one measure that the Company’s implements to promote compliance and provide information to support rigorous oversight within the procurement function The control is designed to verify that purchase orders exceeding $50,000 are supported by an approved procurement pathway, including an Ariba Contract, a documented Sole SourcePage 13 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-092 Page 2 of 5 Justification, or an approved Exception. That statement simply confirms that no Maximo Purchase Order transactions were valued at over $50,000 without the support of (1) an Ariba Contract, (2) a Sole Source Justification embedded in Maximo, or (3) an approved Exception, that has been captured through a structured field and documented in accordance with Company requirements. This control is one component of the Company's broader procurement compliance and oversight framework. Those controls are distinct from payment structure provisions contained within individual contracts. b. The Company performed an analysis of purchase orders issued during the 2023-2026 period to identify vendors that received three or more standalone purchase orders, each individually valued below $50,000, that cumulatively exceeded $150,000 within a rolling 365-day period based on purchase order issuance date. The vendors identified through that analysis are listed below. VENDOR NAME AA ELECTRIC SERVICE INC Acuity Brands Lighting ALTA ENTERPRISES LLC APPLE VALLEY LAWN CARE LLC ARROW FENCE B B CITC LLC DBA BIRDBUFFER BARNHART NORTHEAST INC BLUE COLLAR CUSTOMS LLC BODE EQUIPMENT CO BRIGADE ELECTRONICS INC CIRCUIT BREAKER SALES NE LLC CORSERVA INC CT CRANE & HOIST SERVICE LLC CT SNOW MANAGEMENT LLC DIVAL SAFETY EQUIPMENT INC DYNAMIC COATING SOLUTIONS LLC EAGLE LEASING EATON CORP EMCOR SERVICESPage 14 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-092 Page 3 of 5 GEC DURHAM INDUSTRIES INC GRAINGER GRAYBAR ELECTRIC CO INC HARP SERVICES HAYWOOD ASSOCIATES INCORPORATED HOWARD INDUSTRIES INC HYDRON INC ITRON INC MCPHEE ELECTRIC LTD LLC MJ LAWNCARE LLC NORTHEAST TRANSFORMER SERVICES LLC RAY JURGEN CO LLC REAL POWER INC RED THREAD SPACES LLC RITZ INSTRUMENT TRANSFORMER RJR FABRICATION S&C ELECTRIC S-1 MECHANICAL LLC SCHWEITZER ENGINEERING SUBURBAN SANITATION SERVICE TAYLOR COMMUNICATIONS CORP TULL BROTHERS INC ULTIMATE PROFFESSIONAL GROUNDS MANAGEMENT INC UTILITY POWER VASEL BROTHERS INC WB MASON CO INC WILLIAMS SCOTSMAN ZISTOS CORP c. The Company does not have a need to generate a formal report specifically tracking instances in which multiple purchase orders or contracts were determined to have been intentionally “split” to avoid competitive bidding requirements or higher-level approvalPage 15 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-092 Page 4 of 5 thresholds. When these instances are identified they are typically rejected prior to being processed and the situation is corrected prior to the Maximo Purchase Order being approved. Procurement personnel routinely work with business stakeholders to address procurement process questions, documentation issues, and compliance concerns as they arise. The Company is not aware of any instances during the referenced period in which the Procurement group, Compliance function, or Internal Audit Department concluded that multiple purchase orders or contracts were processed with the intent of circumventing competitive bidding requirements or applicable approval thresholds. To the extent potential issues are identified during the procurement review process, those issues are generally addressed and corrected before the applicable transaction is approved and issued. Further, the Company is not aware of any Internal Audit findings during the referenced period concluding that purchase orders or contracts were intentionally structured to avoid competitive bidding requirements or delegated approval thresholds. Prior Referenced Response: i EOE-166 Question: (COMPETITIVE BID ASSESSMENTS) Respond to the following: a. b. Explain how the Company ensures that each purchase order or contract is subject to a competitive bid assessment, sole source justification, or an approved exception. As part of the response, please discuss whether there are any systemic controls, including the use of Ariba, that ensure adherence to these requirements and, if applicable, provide an example of the referenced controls. Explain how the Company ensures adherence to the Company’s competitive bid requirements for situations where multiple purchase orders or contracts could be used in lieu of the referenced controls discussed in subsection a. EOE-166 Response: a. The Company enforces adherence to competitive bid assessments, sole source justifications, and approved exceptions through integrated governance policies and automated controls within Ariba and Maximo: • Contract Execution Controls: Prior to executing an Ariba Contract, purchasing agents and designated approvers are required to upload or verify appropriate supporting documentation into the system to validate compliance. • Automated Purchase Order (PO) Systemic Logic: When a PO is released, system logic automatically verifies that it is linked to either an active Ariba Contract or an approved Maximo Sole Source Justification. If neither control is present and the PO is valued at more than $50,000, the system prevents processing until the agent selects an approved exception or flags the record as a policy violation.Page 16 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-092 Page 5 of 5 Both pathways require formal dual sign-off from the agent and their supervisor. For exceptions a standardized comment nomenclature is expected. The image below, details the year-to-date metrics tracked by the procurement group on exceptions and violations across the procurement organization, including records supporting CL&P and other affiliates. To date, out of 50,323 Purchase Orders released by the Procurement Team, there were no policy violations and 294 represented exceptions taken at the PO level. b. The Company actively prevents purchase order "stringing" which is the practice of splitting orders to bypass competitive bidding thresholds, where the practice is inappropriate. In some cases, purchase orders may be used to accommodate valid operational requirements (such as distinct delivery sites, scopes of work, or material types): • Agent Oversight & Pattern Detection: Procurement agents evaluate non-contracted POs during the approval workflow. Agents monitor indicators of stringing by cross-referencing requisitions with similar service descriptions, identical supplier selections, and matching accounting strings across multiple orders. • Centralized Spend Coverage: Over 90% of Company spend is governed by master Ariba Contracts. Establishing spend under Ariba Contracts naturally mitigates the risk of PO-level stringing, as individual POs draw down from existing contracts that were approved to DOA systematically.Page 17 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-093 Page 1 of 9 Date Filed: October 05, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: ALLCO Question: State the scope of the assertion in EOE-166, that, of 50,323 purchase orders released year-to-date, “there were no policy violations”: (a) identify the categories of procurement-policy compliance the metric measures and those it does not; (b) state whether the metric’s scope encompasses the conduct examined in the Authority’s procurement-related findings in Docket No. 25-01-03, the procurement observations in the February 11, 2025 management audit prepared by FTI Consulting and Overland Consulting, and the subject matter of the June 4, 2026 internal audit of the procurement organization referenced in the Company’s response to OCC-307; and (c) if the metric is limited to purchase-order release gating, state what compliance failures could occur without registering in the metric. Response: a. The metric reported in EOE-166, i reflects the results of a systemic purchase-order release control present in Maximo that was implemented in September 2025. Of the 50,323 purchase orders released by the Procurement organization during the identified reporting period, none was designated as a policy violation through this control. This statement was not intended to represent that all 50,323 purchase orders were individually reviewed for compliance with every requirement of the Company’s procurement policies. Nor would it be feasible for a single control to accomplish that goal. When a purchase order is released, system logic verifies whether the purchase order is linked to an active Ariba contract or an approved Maximo sole-source justification. If neither is present and the purchase order exceeds $50,000, the system prevents further processing until the purchasing agent selects an approved exception or identifies the purchase order as a policy violation. The applicable pathway requires affirmative sign-off by the purchasing agent and the agent’s supervisor through the system. For an exception, the purchasing agent is also expected to provide an explanatory comment using the standardized nomenclature. Accordingly, this particular control measures whether purchase orders subject to the release logic were processed through one of the following recognized procurement pathways: (1) an Ariba contract (2) an approved Maximo sole-source justification (3) an approved exception to the competitive-bidding requirement or (4) identification as a policyPage 18 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-093 Page 2 of 9 violation. The metric separately tracks approved exceptions. As reported in EOE-166, 294 purchase orders were identified as exceptions at the purchase-order level. The control does not independently confirm adherence to all aspects of the procurement policy. This control is a single component of the Company’s broader procurement compliance and oversight framework. Therefore, the statement that there were “no policy violations” means that no purchase orders were designated as policy violations based on the specific system logic and data evaluated by this control. It should not be interpreted as establishing that no procurement-policy violations or deficiencies occurred outside the control’s defined scope. b. The EOE-166 metric is designed to be a process improvement and cost-efficiency innovation developed by the Company as a result of several insights and considerations emerging from industry learnings and professional development, discussions with internal business partners, ongoing management oversight and improvement processes and inputs from the external regulatory process. The EOE-166 metric does not encompass the broader procurement and supply-chain observations in the February 11, 2025 management audit prepared by FTI Consulting and Overland Consulting. That audit addressed procurement, competitive sourcing, inventory management, and other operational matters but did not specifically test the purchase-order release control or metric described in EOE-166. The EOE-166, metric is separate from the matters reviewed in the June 4, 2026 internal audit referenced in the Company’s response to OCC-307. ii c. The metric is limited to verifying that purchase orders exceeding $50,000 are supported by the required procurement documentation and approvals. Accordingly, other procurement compliance issues could occur without being reflected in this metric, including, but not limited to, potential deficiencies in contract administration, supplier performance management, or other procurement-policy requirements not evaluated by the specific control described in EOE-166. Prior Referenced Response: i EOE-166 Question: (COMPETITIVE BID ASSESSMENTS) Respond to the following:Page 19 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-093 Page 3 of 9 a. Explain how the Company ensures that each purchase order or contract is subject to a competitive bid assessment, sole source justification, or an approved exception. As part of the response, please discuss whether there are any systemic controls, including the use of Ariba, that ensure adherence to these requirements and, if applicable, provide an example of the referenced controls. b. Explain how the Company ensures adherence to the Company’s competitive bid requirements for situations where multiple purchase orders or contracts could be used in lieu of the referenced controls discussed in subsection a. EOE-166 Response: a. The Company enforces adherence to competitive bid assessments, sole source justifications, and approved exceptions through integrated governance policies and automated controls within Ariba and Maximo: • Contract Execution Controls: Prior to executing an Ariba Contract, purchasing agents and designated approvers are required to upload or verify appropriate supporting documentation into the system to validate compliance. Automated Purchase Order (PO) Systemic Logic: When a PO is released, system logic automatically verifies that it is linked to either an active Ariba Contract or an approved Maximo Sole Source Justification. If neither control is present and the PO is valued at more than $50,000, the system prevents processing until the agent selects an approved exception or flags the record as a policy violation. • Both pathways require formal dual sign-off from the agent and their supervisor. For exceptions a standardized comment nomenclature is expected. The image below, details the year-to-date metrics tracked by the procurement group on exceptions and violations across the procurement organization, including records supporting CL&P and other affiliates. To date, out of 50,323 Purchase Orders released by the Procurement Team, there were no policy violations and 294 represented exceptions taken at the PO level. ii OCC-307 Question: Internal Audits. a. b. Provide a list of and copies of all internal audit reports relating to CL&P completed in 2024, 2025, and 2026 year-to-date. Provide a list of all internal audits currently in progress for which a report has not yet been issued as well as the estimated completion date of the audit. OCC-307 Response: a. Please refer to the list below showing all audits completed during 2024, 2025, and 2026 year-to-date and the reference to where the report is provided. Report Issue Date Audit Report # 1/02/2024 24-01 Audit Report Title 2023 Fraud Program Audit Reference OCC-307, Attachment CONFIDENTIAL 1Page 20 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-093 Page 4 of 9 1/03/2024 24-02 Environmental Process Audit – Oilfilled Electrical Equipment (2023) OCC-307, Attachment CONFIDENTIAL 1/09/2024 24-06 Purchasing Card Program EOE-057, Attachment 5 CONFIDENTIAL AND REDACTED FOR RELEVANCE 2/08/2024 24-07 CT Electric and Gas Automated Meter OCC-307, Attachment 3 Reading Audit CONFIDENTIAL AND REDACTED FOR RELEVANCE 2/13/2024 24-08 CT New Start Program Audit OCC-307, Attachment 4 CONFIDENTIAL AND REDACTED FOR RELEVANCE 2/12/2024 24-09 Engineering Vendor Compliance Review OCC-307, Attachment 5 CONFIDENTIAL AND REDACTED FOR RELEVANCE 2/06/2024 24-11 Connecticut Pole Administration Audit OCC-307, Attachment CONFIDENTIAL 2/13/2024 24-12 Energy Efficiency Governance Program OCC-307, Attachment 7 Review CONFIDENTIAL AND REDACTED FOR RELEVANCE Report Issue Date Audit Report # Audit Report Title 2/26/2024 24-13 IT Azure Active Directory Review 2/27/2024 24-14 Azure Cloud Administration 2/28/2024 24-15 2/20/2024 2 6 Reference EOE-003, Attachment CONFIDENTIAL 24 and EOE-003, Attachment CONFIDENTIAL 25 IT Cybersecurity Incident Response Playbook Review EOE-003, Attachment CONFIDENTIAL 26 24-17 NERC CIP Vulnerability Assessment Audit - Active (CT, MA, NH) EOE-003, Attachment 27 CONFIDENTIAL AND REDACTED FOR RELEVANCE 2/26/2024 24-18 CT Electric Substations Environmental Compliance Audit (2023) OCC-307, Attachment CONFIDENTIAL 8 3/07/2024 24-19 Unvouchered Liability Audit OCC-307, Attachment CONFIDENTIAL 9 3/08/2024 24-20 Legacy NU - Sundry Billing Audit OCC-307, Attachment 10 CONFIDENTIAL AND REDACTED FOR RELEVANCE Governance
As listed on the current system
Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).