Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).
Files4
Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 14 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
ALLCO Set 9 COMBINED.pdf
PDF · 746 KB · 61 pagesText searchable
Download ALLCO Set 9 COMBINED.pdfRead the text of ALLCO Set 9 COMBINED.pdf
OCC Set 19_COMBINED.pdf
PDF · 1.4 MB · 141 pagesText searchable
Download OCC Set 19_COMBINED.pdfRead the text of OCC Set 19_COMBINED.pdf
OCC Set 20 COMBINED.pdf
PDF · 1.0 MB · 98 pagesText searchable
Download OCC Set 20 COMBINED.pdfRead the text of OCC Set 20 COMBINED.pdf
Page 22 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-093 Page 6 of 9 12/26/2024 24-571 CT Electric Substations Environmental Compliance Audit (2024) OCC-307, Attachment CONFIDENTIAL 26 1/03/2025 25-01 2024 Fraud Program OCC-307, Attachment CONFIDENTIAL 27 1/23/2025 25-07 Disaster Recovery Program Maturity Assessment OCC-307, Attachment 28 CONFIDENTIAL AND REDACTED FOR RELEVANCE 1/22/2025 25-08 Work Order Life Cycle (WOLC) Project - 2024 OCC-307, Attachment 29 CONFIDENTIAL AND REDACTED FOR RELEVANCE 1/30/2025 25-10 Energy Efficiency Vendor Management OCC-307, Attachment 30 CONFIDENTIAL AND REDACTED FOR RELEVANCE 2/28/2025 25-11 IT 3rd Party Vendor Assessment Process OCC-307, Attachment CONFIDENTIAL Report Issue Date Audit Report # 2/25/2025 25-13 Spare Electric and Gas Equipment 2/26/2025 25-14 NERC CIP Vulnerability (Paper – CT,MA,NH) 8/04/2025 25-24 Eversource Driver Qualification Program OCC-307, Attachment 33 Audit CONFIDENTIAL AND REDACTED FOR RELEVANCE 7/03/2025 25-25 CT Electric Facilities Environmental Compliance Audit OCC-307, Attachment CONFIDENTIAL 8/06/2025 25-27 Procurement Compliance Audit EOE-057, Attachment 6 CONFIDENTIAL AND REDACTED FOR RELEVANCE 8/12/2025 25-28 Sustainability Reporting Process Audit OCC-307, Attachment CONFIDENTIAL 35 8/12/2025 25-31 Environmental Vendor Trucking, LLC Audit-Anastasio OCC-307, Attachment CONFIDENTIAL 36 8/27/2025 25-33 Treated Wood Process Audit Products-Environmental OCC-307, Attachment CONFIDENTIAL 37 Audit Report Title 31 Reference OCC-307, Attachment 32 CONFIDENTIAL AND REDACTED FOR RELEVANCE Assessment EOE-003, Attachment 28 CONFIDENTIAL AND REDACTED FOR RELEVANCE 34Page 23 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-093 Page 7 of 9 11/18/2025 25-40 Inventory Audit OCC-307, Attachment 38 CONFIDENTIAL AND REDACTED FOR RELEVANCE 1/06/2026 26-01 Fraud Program (2025) OCC-307, Attachment CONFIDENTIAL 39 1/06/2026 26-02 Revenew Vendor Contract Compliance OCC-142, Attachment Review CONFIDENTIAL 2 1/08/2026 26-06 Supplier Relationship Management Audit EOE-057, Attachment CONFIDENTIAL 7 1/22/2026 26-07 Work Order Life Cycle (WOLC) Project OCC-307, Attachment CONFIDENTIAL 40 1/22/2026 26-08 CT Electric Substations Environmental Compliance Audit OCC-307, Attachment CONFIDENTIAL 41 1/23/2026 26-09 Electric Vehicle Audit OCC-307, Attachment 42 CONFIDENTIAL AND REDACTED FOR RELEVANCE 1/26/2026 26-10 Defined Benefit Pension Plan Audit OCC-307, Attachment CONFIDENTIAL Report Issue Date Audit Report # 1/27/2026 26-11 Third-Party Electric Supplier Audit 2/04/2026 26-14 Energy Efficiency Time Allocation Audit 2/27/2026 26-17 Artificial Intelligence (AI) Governance EOE-003, Attachment Assessment CONFIDENTIAL 29 3/02/2026 26-18 Azure Cloud Governance and Access Administration Review EOE-003, Attachment CONFIDENTIAL 30 3/03/2026 26-19 Engineering Vendor Compliance Review OCC-307, Attachment 46 CONFIDENTIAL AND REDACTED FOR RELEVANCE 3/04/2026 26-22 NERC CIP Vulnerability Assessment Audit EOE-003, Attachment 31 CONFIDENTIAL AND REDACTED FOR RELEVANCE 3/16/2026 26-26 Accounts Payable Audit OCC-307, Attachment CONFIDENTIAL 47 3/23/2026 26-27 IT Red Team Assessment EOE-003, Attachment CONFIDENTIAL 32 Audit Report Title 43 Reference Services OCC-307, Attachment CONFIDENTIAL 44 OCC-307, Attachment 45 CONFIDENTIAL AND REDACTED FOR RELEVANCEPage 24 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-093 Page 8 of 9 4/07/2026 26-28 Cloud Data Storage (EDP) Assessment EOE-003, Attachment 33 CONFIDENTIAL AND REDACTED FOR RELEVANCE 4/13/2026 26-30 Subsystem Auto-Approval OCC-307, Attachment 48 CONFIDENTIAL AND FOR RELEVANCE 5/15/2026 26-37 Cash Management Audit OCC-307, Attachment 49 CONFIDENTIAL AND REDACTED FOR RELEVANCE 6/15/2026 26-44 CT Electric Compliance Environmental OCC-307, Attachment CONFIDENTIAL 50 7/07/2026 26-46 Sustainability Reporting Process Audit OCC-307, Attachment CONFIDENTIAL 51 8/21/2026 26-49 Warehouse Practices OCC-307, Attachment 52 CONFIDENTIAL AND REDACTED FOR RELEVANCE AWC REDACTED In addition, as part of the attorney-client privileged work product that was developed for this contested rate case proceeding and the contested revenue adjustment mechanism proceeding, the Eversource Energy Internal Audit Department was directed to perform an audit of the procurement organization that was completed on June 4, 2026. The Privileged Report was issued from R. S. Smith, Vice PresidentInternal Audit & Security, to Vincent Pace, Assistant General Counsel. The Privileged Report is exempt from disclosure under the attorney-client work product privilege and the attorney client communication privilege. Further, there is a report dated January 7, 2026 concerning the process Eversource uses in three states to report and settle energy loads in the ISO-New England load settlement system. That report issued by R. S. Smith, Vice President-Internal Audit & Security and M. M. Carlson, Manager, to the Eversource Legel Department is exempt from disclosure under the attorney-client work product privilege and the attorney client communication privilege. The report is also not relevant to the examination of the Company’s request to adjust distribution rates in this docket. b. An audit is considered in process if the engagement memo has been issued. The following audits may not be CL&P specific but instead are general audits that cover all Eversource operating companies. Please see below for the list of all audits in process as of August 18, 2026, and the estimated completion date. Audit Title Estimated Completion Date Spill Reporting OSHA Safety Compliance (Training & Qualifications) Vendor Contract Compliance (2026) Distribution Management System Data Integrity Disaster Recovery (CIP Systems) Third Party Vendor Assessment Q4 2026 Q3 2026 Q4 2026 Q4 2026 Q4 2026 Q4 2026Page 25 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-093 Page 9 of 9Page 26 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-094 Page 1 of 2 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding, Jenna Turner, Christopher E. Colorio, Mark P. Baldwin, Lavelle A. Freeman and Elli Ntakou Request from: ALLCO Question: The response to ALLCO-045 produced the requested analyses but did not answer the interrogatory’s final subparts. (a) Identify each recommendation contained in ALLCO-045, Attachment 1, ALLCO-045, Attachment 2, (the September 2, 2021, Quanta Technology review), and the University of Connecticut studies referenced in the response that the Company has not implemented, and state the reason it was not implemented and the estimated cost of implementation. (b) State whether any portion of the storm costs for which recovery is sought in this docket arose on circuits, line segments, or assets that, before the storm at issue, (i) fell within the higher tree-exposure bands of bare-conductor construction analyzed in Attachment 1, (ii) had been identified through the Storm DEMI recurrence screen described in the response, or (iii) had been identified in any analysis as candidates for hardening, reconductoring, undergrounding, or enhanced vegetation management — identifying each such circuit or asset and the associated storm cost. (c) If the Company contends it cannot perform that identification, produce the data from which it can be performed: the circuit or line-segment identifiers associated with the storm costs compiled in the STORM-ACCT exhibits, by storm event, and the segment-level construction-type and tree-exposure classification underlying Attachment 1. Response: a. The Company responds as follows with respect to each requested analysis. Please refer to ALLCO-045, Attachment 1, for a performance analysis that compares observed failure rates by construction type and tree exposure. It contains no recommendations, and accordingly there are no unimplemented recommendations associated with it. The Quanta review contained in ALLCO-045, Attachment 2, is a benchmarking and industry-practice review. It compares Eversource’s reliability performance against the IEEE PES Distribution Reliability Working Group benchmark, summarizes industry resilience frameworks and mitigation categories, and describes Eversource’s then-existing resiliency programs alongside corresponding industry practices. It does not contain a recommendations section, a gap analysis, or cost estimates for any proposed action.Page 27 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-094 Page 2 of 2 The review does observe, at Slide 14, that the Company’s distribution reliability analysis and project prioritization could be enhanced through the use of predictive reliability modeling providing a quantitative basis for estimating expected benefits, targeting investments to poor-performing areas, and prioritizing improvement projects. The Company has implemented that approach to formulate the storm resilience plan proposed as part of the Targeted System Performance Plan. The All-In predicted SAIDI methodology, the Storm DEMI recurrence screen, and the customer-minute and value-oflost-load benefit quantification supporting the Resiliency Plan together provide a quantitative, data-driven basis for estimating expected benefits and ranking candidate projects by predicted customer impact. The Company also implemented the avoidedinterruption valuation approach described at Slide 21 through its Interruption Cost Estimate Calculator analysis. The Company notes that its 2022 System Resilience Plan ($800 million) was constructed to align with the general guidelines of the Quanta Technology review. The $150M storm resilience plan submitted as part of the Targeted System Performance Plan is a more focused program, founded on the same principles as the Quanta report tailored to the Eversource system and data to create a lower cost plan that meaningfully and cost effectively promotes resilience. The enhanced structural and electrical design standards described at Slide 24 of the review document standards the Company had already adopted as of the date of the review. They are not recommendations directed to the Company. b. No. With respect to subpart (i), the analysis produced as ALLCO-045, Attachment 1, was prepared in March 2026. It did not exist before any storm for which costs are sought. With respect to subpart (ii), the Storm DEMI recurrence screen was first produced in March 2026, following completion of the zone-level vegetation risk classification. It likewise did not exist before any storm for which costs are sought. c. The condition stated in subpart (c) is not present. The Company has performed the identification requested in subpart (b) and has answered it and therefore does not contend that it cannot do so. The Company further states, for PURA’s information, that the data described in subpart (c) does not exist in the form requested. Storm costs are recorded by storm event, not by circuit or line segment, and the Company does not maintain circuit or line-segment identifiers associated with storm costs.Page 28 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-095 Page 1 of 3 Date Filed: October 05, 2026 Witness: Andrew C. Belden, Warren R. Boutin and Justin Pelkowski Request from: ALLCO Question: The Company’s responses to ALLCO-040 and ALLCO-041 state that treating distributionconnected resources under five megawatts as unregistered load reducers “produces benefits for customers by reducing wholesale load obligations” and “reduce[s] the load and capacity supply obligations of all load serving entities.” For each calendar year 2020 through 2025: (a) describe how the Company’s retail load settlement process allocates the output of a host customer’s behind-the-meter generation to the load-serving entity serving that customer — i.e., confirm that when the host customer is served by a licensed third-party supplier, the resulting reduction in settled load accrues to that supplier’s wholesale position rather than to the Company’s standard service load; (b) state the number of net-metered, virtually netmetered, and other load-reducer host customers served by third-party suppliers versus taking standard service or supplier-of-last-resort service, by year, and the associated behind-the-meter output in MWh for each group (or the best available estimate, identifying the estimation method); and (c) state the aggregate MWh by which load-reducer output reduced the settled Real-Time Load Obligation of the Company and of third-party suppliers, respectively, by year, in native format. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, the Company states as follows: Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-01-03 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04 and ALLCO-027. Eversource objected to both of these questions. 1Page 29 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-095 Page 2 of 3 a. For the purposes of ISO-NE load settlement within the wholesale power markets, electric distribution utilities report load data to ISO-NE for each “Load Asset,” which is the specific collection of customer load represented in the ISO-NE market settlement system for a particular load-serving entity (“LSE”). The Company reports hourly load data to ISO-NE consistent with the applicable tariff provisions and rules of ISO-NE. Customer hourly loads are determined based on either actual hourly interval data or estimated data developed from load profiles. Non-large commercial and industrial customers generally do not have interval metering, and their load data is reported to ISO-NE based on load profiles. Large commercial and industrial customers have interval metering and their load data is reported to ISO-NE based on that hourly metered data. When interval data is not available, the load data for those customers is reported to ISO-NE based on load profiles. If a customer has a behind-the-meter load reducer, then for generation that is not in excess of the their consumption that load reducer lowers both that customer’s billed sales and the wholesale load associated with the load asset assigned to their LSE. If a wholesale supplier’s load is reduced, the expense billed from ISO-NE to the wholesale supplier is reduced. For generation that is in excess of their consumption, that excess amount is credited to the customer in the manner described in ALLCO-043. The excess wholesale generation is distributed amongst all LSEs in the load zone. b. The volume of distributed generation facilities enrolled in Connecticut clean energy programs and tariffs is reported by the EDCs and other program administrators on an annual basis, most recently in Docket No. 25-08-01. The total number and capacity of reported facilities in Eversource service territory for each year is as follows: Year DG facility count 2020 2021 2022 2023 2024 2025 31,997 35,481 41,448 56,327 67,591 75,727 Total MW 314.5 360.7 414.0 539.3 658.8 742.5 _ The Company does not track the number of customers enrolled in clean energy programs and tariffs served by third-party suppliers versus taking standard service or supplier-oflast-resort service. c. The company does not track or estimate the aggregate MWh by which load-reducer output reduced the settled Real-Time Load Obligations.Page 30 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-095 Page 3 of 3 Prior Referenced Response: _______________________ i ALLCO-043 Question: Describe how amounts associated with net metering and virtual net metering are calculated and recovered from other customers through the NBFMCC (including the "avoided bill" methodology described by Company witnesses in Docket No. 20-01-01), and state whether the amounts so charged to customers are reduced or offset by the corresponding reductions in regional transmission charges (RNS, LNS, TAC), capacity obligations, and standard service procurement quantities attributable to the same behind-the-meter generation; if no such offset is made, explain why not, and quantify the annual amount charged to customers through the NBFMCC for net metering for each year 2020 through 2025 without any such offset. ALLCO-043 Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to ALLCO’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding.1 Without waiving said objection, net metering and virtual net metering amounts included in the NBFMCC are calculated and recorded for inclusion in the NBFMCC, as part of each customer’s monthly bill, in accordance with the tariff rider under which each customer is enrolled. Monthly net metering amounts for the net metering rider involving banked kWh (e.g., Rider N) are calculated by multiplying the portion of a customer’s net metering facility’s energy produced and not used, but that is netted against the energy delivered to that customer from the distribution system by the customer’s prevailing per kWh rates. Any excess monthly energy production not so netted over the course of 12 months is multiplied by the annual average LMP rate to determine a residual amount included in the NBFMCC. For net metering facilities that do not involve kWh banking (e.g., RRES), the amount included in the NBFMCC for each month is calculated by multiplying total energy produced and not used by the customer by the rate set forth pursuant to the net metering tariff rider under which they are enrolled. For virtual net metering (“VNM”), net metering amounts included in the NBFMCC are determined by multiplying the monthly energy production by the prevailing general service rates under which the customer receives electric service, calculated on a per kWh basis, pursuant to the VNM rider Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-01-03 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04 and ALLCO-027. Eversource objected to both of these questions. 1Page 31 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-096 Page 1 of 1 Date Filed: October 05, 2026 Witness: Justin Pelkowski Request from: ALLCO Question: Quantify, or produce the data sufficient to quantify, the wholesale cost reductions realized by licensed third-party suppliers by reason of load-reducer treatment for each calendar year 2020 through 2025, stated separately for: (a) energy the reduction in suppliers’ settled load valued at applicable locational marginal prices; (b) capacity — the reduction in suppliers’ capacity load obligations valued at applicable capacity prices; (c) regional transmission — the reduction in the coincident-peak determinants underlying RNS, LNS, and TAC charges attributable to load served by suppliers; and (d) reserves and ancillary services; and state, for each category, whether any statute, regulation, tariff, or contractual mechanism requires third-party suppliers to pass those savings through to their retail customers or to compensate the host customers whose generation produced them. If no such mechanism exists, so state. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10, states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, it is not possible for the Company to produce the data required to quantify the alleged wholesale-cost reductions claimed by this interrogatory. The Company is unaware of any statute, regulation, tariff, or contractual mechanism that requires third-party suppliers to pass any potential savings that may result due to load reducers associated with customers taking retail supply from the supplier through to those retail customers. Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-0103, Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04, and ALLCO-027. Eversource objected to both of these questions. 1
As listed on the current system
Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).