Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).
Files4
Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 14 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
ALLCO Set 9 COMBINED.pdf
PDF · 746 KB · 61 pagesText searchable
Download ALLCO Set 9 COMBINED.pdfRead the text of ALLCO Set 9 COMBINED.pdf
OCC Set 19_COMBINED.pdf
PDF · 1.4 MB · 141 pagesText searchable
Download OCC Set 19_COMBINED.pdfRead the text of OCC Set 19_COMBINED.pdf
OCC Set 20 COMBINED.pdf
PDF · 1.0 MB · 98 pagesText searchable
Download OCC Set 20 COMBINED.pdfRead the text of OCC Set 20 COMBINED.pdf
Page 25 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-093 Page 9 of 9Page 26 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-094 Page 1 of 2 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding, Jenna Turner, Christopher E. Colorio, Mark P. Baldwin, Lavelle A. Freeman and Elli Ntakou Request from: ALLCO Question: The response to ALLCO-045 produced the requested analyses but did not answer the interrogatory’s final subparts. (a) Identify each recommendation contained in ALLCO-045, Attachment 1, ALLCO-045, Attachment 2, (the September 2, 2021, Quanta Technology review), and the University of Connecticut studies referenced in the response that the Company has not implemented, and state the reason it was not implemented and the estimated cost of implementation. (b) State whether any portion of the storm costs for which recovery is sought in this docket arose on circuits, line segments, or assets that, before the storm at issue, (i) fell within the higher tree-exposure bands of bare-conductor construction analyzed in Attachment 1, (ii) had been identified through the Storm DEMI recurrence screen described in the response, or (iii) had been identified in any analysis as candidates for hardening, reconductoring, undergrounding, or enhanced vegetation management — identifying each such circuit or asset and the associated storm cost. (c) If the Company contends it cannot perform that identification, produce the data from which it can be performed: the circuit or line-segment identifiers associated with the storm costs compiled in the STORM-ACCT exhibits, by storm event, and the segment-level construction-type and tree-exposure classification underlying Attachment 1. Response: a. The Company responds as follows with respect to each requested analysis. Please refer to ALLCO-045, Attachment 1, for a performance analysis that compares observed failure rates by construction type and tree exposure. It contains no recommendations, and accordingly there are no unimplemented recommendations associated with it. The Quanta review contained in ALLCO-045, Attachment 2, is a benchmarking and industry-practice review. It compares Eversource’s reliability performance against the IEEE PES Distribution Reliability Working Group benchmark, summarizes industry resilience frameworks and mitigation categories, and describes Eversource’s then-existing resiliency programs alongside corresponding industry practices. It does not contain a recommendations section, a gap analysis, or cost estimates for any proposed action.Page 27 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-094 Page 2 of 2 The review does observe, at Slide 14, that the Company’s distribution reliability analysis and project prioritization could be enhanced through the use of predictive reliability modeling providing a quantitative basis for estimating expected benefits, targeting investments to poor-performing areas, and prioritizing improvement projects. The Company has implemented that approach to formulate the storm resilience plan proposed as part of the Targeted System Performance Plan. The All-In predicted SAIDI methodology, the Storm DEMI recurrence screen, and the customer-minute and value-oflost-load benefit quantification supporting the Resiliency Plan together provide a quantitative, data-driven basis for estimating expected benefits and ranking candidate projects by predicted customer impact. The Company also implemented the avoidedinterruption valuation approach described at Slide 21 through its Interruption Cost Estimate Calculator analysis. The Company notes that its 2022 System Resilience Plan ($800 million) was constructed to align with the general guidelines of the Quanta Technology review. The $150M storm resilience plan submitted as part of the Targeted System Performance Plan is a more focused program, founded on the same principles as the Quanta report tailored to the Eversource system and data to create a lower cost plan that meaningfully and cost effectively promotes resilience. The enhanced structural and electrical design standards described at Slide 24 of the review document standards the Company had already adopted as of the date of the review. They are not recommendations directed to the Company. b. No. With respect to subpart (i), the analysis produced as ALLCO-045, Attachment 1, was prepared in March 2026. It did not exist before any storm for which costs are sought. With respect to subpart (ii), the Storm DEMI recurrence screen was first produced in March 2026, following completion of the zone-level vegetation risk classification. It likewise did not exist before any storm for which costs are sought. c. The condition stated in subpart (c) is not present. The Company has performed the identification requested in subpart (b) and has answered it and therefore does not contend that it cannot do so. The Company further states, for PURA’s information, that the data described in subpart (c) does not exist in the form requested. Storm costs are recorded by storm event, not by circuit or line segment, and the Company does not maintain circuit or line-segment identifiers associated with storm costs.Page 28 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-095 Page 1 of 3 Date Filed: October 05, 2026 Witness: Andrew C. Belden, Warren R. Boutin and Justin Pelkowski Request from: ALLCO Question: The Company’s responses to ALLCO-040 and ALLCO-041 state that treating distributionconnected resources under five megawatts as unregistered load reducers “produces benefits for customers by reducing wholesale load obligations” and “reduce[s] the load and capacity supply obligations of all load serving entities.” For each calendar year 2020 through 2025: (a) describe how the Company’s retail load settlement process allocates the output of a host customer’s behind-the-meter generation to the load-serving entity serving that customer — i.e., confirm that when the host customer is served by a licensed third-party supplier, the resulting reduction in settled load accrues to that supplier’s wholesale position rather than to the Company’s standard service load; (b) state the number of net-metered, virtually netmetered, and other load-reducer host customers served by third-party suppliers versus taking standard service or supplier-of-last-resort service, by year, and the associated behind-the-meter output in MWh for each group (or the best available estimate, identifying the estimation method); and (c) state the aggregate MWh by which load-reducer output reduced the settled Real-Time Load Obligation of the Company and of third-party suppliers, respectively, by year, in native format. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, the Company states as follows: Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-01-03 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04 and ALLCO-027. Eversource objected to both of these questions. 1Page 29 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-095 Page 2 of 3 a. For the purposes of ISO-NE load settlement within the wholesale power markets, electric distribution utilities report load data to ISO-NE for each “Load Asset,” which is the specific collection of customer load represented in the ISO-NE market settlement system for a particular load-serving entity (“LSE”). The Company reports hourly load data to ISO-NE consistent with the applicable tariff provisions and rules of ISO-NE. Customer hourly loads are determined based on either actual hourly interval data or estimated data developed from load profiles. Non-large commercial and industrial customers generally do not have interval metering, and their load data is reported to ISO-NE based on load profiles. Large commercial and industrial customers have interval metering and their load data is reported to ISO-NE based on that hourly metered data. When interval data is not available, the load data for those customers is reported to ISO-NE based on load profiles. If a customer has a behind-the-meter load reducer, then for generation that is not in excess of the their consumption that load reducer lowers both that customer’s billed sales and the wholesale load associated with the load asset assigned to their LSE. If a wholesale supplier’s load is reduced, the expense billed from ISO-NE to the wholesale supplier is reduced. For generation that is in excess of their consumption, that excess amount is credited to the customer in the manner described in ALLCO-043. The excess wholesale generation is distributed amongst all LSEs in the load zone. b. The volume of distributed generation facilities enrolled in Connecticut clean energy programs and tariffs is reported by the EDCs and other program administrators on an annual basis, most recently in Docket No. 25-08-01. The total number and capacity of reported facilities in Eversource service territory for each year is as follows: Year DG facility count 2020 2021 2022 2023 2024 2025 31,997 35,481 41,448 56,327 67,591 75,727 Total MW 314.5 360.7 414.0 539.3 658.8 742.5 _ The Company does not track the number of customers enrolled in clean energy programs and tariffs served by third-party suppliers versus taking standard service or supplier-oflast-resort service. c. The company does not track or estimate the aggregate MWh by which load-reducer output reduced the settled Real-Time Load Obligations.Page 30 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-095 Page 3 of 3 Prior Referenced Response: _______________________ i ALLCO-043 Question: Describe how amounts associated with net metering and virtual net metering are calculated and recovered from other customers through the NBFMCC (including the "avoided bill" methodology described by Company witnesses in Docket No. 20-01-01), and state whether the amounts so charged to customers are reduced or offset by the corresponding reductions in regional transmission charges (RNS, LNS, TAC), capacity obligations, and standard service procurement quantities attributable to the same behind-the-meter generation; if no such offset is made, explain why not, and quantify the annual amount charged to customers through the NBFMCC for net metering for each year 2020 through 2025 without any such offset. ALLCO-043 Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to ALLCO’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding.1 Without waiving said objection, net metering and virtual net metering amounts included in the NBFMCC are calculated and recorded for inclusion in the NBFMCC, as part of each customer’s monthly bill, in accordance with the tariff rider under which each customer is enrolled. Monthly net metering amounts for the net metering rider involving banked kWh (e.g., Rider N) are calculated by multiplying the portion of a customer’s net metering facility’s energy produced and not used, but that is netted against the energy delivered to that customer from the distribution system by the customer’s prevailing per kWh rates. Any excess monthly energy production not so netted over the course of 12 months is multiplied by the annual average LMP rate to determine a residual amount included in the NBFMCC. For net metering facilities that do not involve kWh banking (e.g., RRES), the amount included in the NBFMCC for each month is calculated by multiplying total energy produced and not used by the customer by the rate set forth pursuant to the net metering tariff rider under which they are enrolled. For virtual net metering (“VNM”), net metering amounts included in the NBFMCC are determined by multiplying the monthly energy production by the prevailing general service rates under which the customer receives electric service, calculated on a per kWh basis, pursuant to the VNM rider Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-01-03 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04 and ALLCO-027. Eversource objected to both of these questions. 1Page 31 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-096 Page 1 of 1 Date Filed: October 05, 2026 Witness: Justin Pelkowski Request from: ALLCO Question: Quantify, or produce the data sufficient to quantify, the wholesale cost reductions realized by licensed third-party suppliers by reason of load-reducer treatment for each calendar year 2020 through 2025, stated separately for: (a) energy the reduction in suppliers’ settled load valued at applicable locational marginal prices; (b) capacity — the reduction in suppliers’ capacity load obligations valued at applicable capacity prices; (c) regional transmission — the reduction in the coincident-peak determinants underlying RNS, LNS, and TAC charges attributable to load served by suppliers; and (d) reserves and ancillary services; and state, for each category, whether any statute, regulation, tariff, or contractual mechanism requires third-party suppliers to pass those savings through to their retail customers or to compensate the host customers whose generation produced them. If no such mechanism exists, so state. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10, states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, it is not possible for the Company to produce the data required to quantify the alleged wholesale-cost reductions claimed by this interrogatory. The Company is unaware of any statute, regulation, tariff, or contractual mechanism that requires third-party suppliers to pass any potential savings that may result due to load reducers associated with customers taking retail supply from the supplier through to those retail customers. Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-0103, Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04, and ALLCO-027. Eversource objected to both of these questions. 1Page 32 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-097 Page 1 of 1 Date Filed: October 05, 2026 Witness: Justin Pelkowski Request from: ALLCO Question: State whether the Company has ever analyzed, tracked, estimated, or reported — internally, to ISO-New England, to the Authority, or otherwise — the division of load-reducer benefits between (a) the Company’s standard service and supplier-of-last-resort customers and (b) third-party suppliers and their customers; identify and produce each such analysis or report; and state whether the Company has taken any action to measure, capture, credit, or claim — for its standard service customers, for the host customers whose generation produces the savings, or for ratepayers generally — the value that accrues to third-party suppliers from load-reducer treatment, and if it has taken no such action, state each reason why not. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10, states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, to the best of Eversource’s knowledge the requested data is not analyzed, tracked, estimated or reported on and there is no action for the Company to take. Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-0103, Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04, and ALLCO-027. Eversource objected to both of these questions. 1Page 33 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-098 Page 1 of 1 Date Filed: October 05, 2026 Witness: Edward A. Davis, Kimberly R. Parsons and Andrew C. Belden Request from: ALLCO Question: With respect to the interaction of net metering costs and load-reducer benefits:(a) confirm that the NBFMCC is a non-bypassable charge assessed on all of the Company’s distribution customers, including customers served by third-party suppliers; (b) confirm that, accordingly, the net metering and virtual net metering amounts included in the NBFMCC (described in the Company’s response to ALLCO-043) are recovered from all distribution customers, while the wholesale energy, capacity, transmission, and reserve savings produced by the same behind-the-meter generation accrue to each host customer’s load-serving entity — including third-party suppliers with no obligation to pass them through; (c) identify any analysis the Company has performed of this costbenefit asymmetry, and produce it; and (d) state whether the Company has ever proposed to the Authority or to ISO-New England any mechanism to credit load-reducer savings against the NBFMCC or otherwise to align the parties who bear net metering costs with the parties who receive the corresponding wholesale savings, identifying each proposal or confirming there has been none. Response: (a) Yes. The NBFMCC is a non-bypassable charge assessed on all of the Company’s distribution customers, including customers served by third-party suppliers; (b) No. The amounts included in the NBFMCC are costs incurred to credit net metering and virtual net metering customers for excess generation output and are recovered from all distribution customers. Amounts included in the NBFMCC do not include costs associated with generation that is consumed directly by the customer and lowers their metered electricity consumption. The excess generation output from net metering and virtual net metering facilities reduces load and capacity obligations for all load-serving entities, not each host customer’s load-serving entity. Any impact on transmission cost allocation is also reflected in transmission costs recovered from all customers. (c) There is no cost-benefit asymmetry. (d) No. Existing cost allocation and recovery mechanisms already align the parties who bear net metering costs with the parties who receive the corresponding wholesale savings.Page 34 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-099 Page 1 of 3 Date Filed: October 14, 2026 Witness: Donald J. Scacco Jr., Digaunto Chatterjee, Douglas P. Horton, Leanne M. Landry and Jeffrey D. Turano Request from: ALLCO Question: (Follow-up to ALLCO-053.) The response states that “[p]lant additions and retirements are not forecasted by project at a FERC account level” and answers every remaining subpart “N/A.” That position cannot be reconciled with the Company’s own filings: on September 15, 2026, the Company filed Exhibit CLP-ADDITIONS-4 Supplemental, whose “2026 Plan Update” tab presents the Company’s projected 2026 capital spend PROJECT BY PROJECT — project number, name, projected spend, and a narrative project description — totaling approximately $605 million. State: (a) how the project-level 2026 capital plan in CLP-ADDITIONS-4 Supplemental, was developed and by whom, and produce the equivalent project-level plans for 2027 and 2028 (or the most recent capital budget or five-year plan covering those years, however titled); (b) a reconciliation of the project-level 2026 plan to the January 2026-June 2027 forecasted additions by FERC account on Schedule B-2.2; (c) the answers to subparts (b) through (e) of ALLCO-053, none of which depends on the premise the response rejected: subpart (c) asks where AMI capital is reflected — a question about the Company’s own schedules; subpart (d) asks for the fleet plan supporting approximately $76 million of forecasted transportation additions including $47.9 million of Class 4 heavy trucks; and subpart (e) asks whether documented business cases exist for projects exceeding $25 million — answer each, or state affirmatively that no fleet plan and no business-case analyses exist; and (d) if the Company maintains that its $1.51 billion of forecasted additions is supported only by “historical precedent and anticipated projects,” identify every document in which the “anticipated projects” are listed. Response: a. Capital investment forecasts are developed as part of annual financial planning efforts that span organizations across the Company. It is not practical nor relevant to determine each individual that may have contributed thoughts or expertise that gave rise to the capital projections ultimately determined and subsequently filed in this proceeding. As with most planning processes, models, and efforts, planning assumptions that have a longer time horizon have different supporting documentation and specificity than planning assumptions that are closer in time. In the present circumstance, financial planning for the near future, which is informed by more developed project scopes, engineering assessments, asset condition information, resource plans, known business requirements, and a clearer understanding of expected operational circumstances, can and does yield more detail than capital expenditure projections further out in time. Such operational circumstances include anticipated asset
As listed on the current system
Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).