Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).
Files4
Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 14 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
ALLCO Set 9 COMBINED.pdf
PDF · 746 KB · 61 pagesText searchable
Download ALLCO Set 9 COMBINED.pdfRead the text of ALLCO Set 9 COMBINED.pdf
OCC Set 19_COMBINED.pdf
PDF · 1.4 MB · 141 pagesText searchable
Download OCC Set 19_COMBINED.pdfRead the text of OCC Set 19_COMBINED.pdf
OCC Set 20 COMBINED.pdf
PDF · 1.0 MB · 98 pagesText searchable
Download OCC Set 20 COMBINED.pdfRead the text of OCC Set 20 COMBINED.pdf
Page 35 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-099 Page 2 of 3 replacement needs, system reliability considerations, customer growth and interconnection activity, regulatory and compliance requirements, workforce circumstances and other system conditions that become increasingly difficult to predict with precision over longer planning horizons. b. As previously stated, plant additions and retirements are not forecasted by project at a FERC account level. The 2026 Plan Update provided is at a project level but does not forecast at the FERC account level presented as part of Schedule B-2.2. The Company is currently engaged in its 2027 Annual Planning Process. c. Please see the following: o AMI capital is not currently reflected within the Company’s rate base. The Company has proposed to PURA in this proceeding how its PBMRP proposal can be adjusted to accommodate AMI capital investments in the future. o The fleet plan is not forecasted at the vehicle class level. o All capital projects are reviewed in accordance with the Project Authorization Policy (PAP) which is provided in Exhibit-CLP-ADDITIONS-10A, 10B, and 10C. All associated capital additions documentation is summarized in Exhibit-CLP-ADDITIONS-4, and provided in Exhibit-CLP-ADDITIONS-6. d. FERC plant accounts and capital projects represent two different ways of organizing the same underlying investment. Capital projects are typically organized around a specific business objective, scope of work, geographic area, program, or asset installation effort, such as a substation expansion, feeder rebuild, pole replacement program, among others. In contrast, once those projects are placed into service, the associated costs are disaggregated and classified into FERC plant accounts based on the nature and function of the assets constructed, such as poles, conductors, transformers, station equipment, buildings, or communication equipment. Accordingly, a single capital project may contribute costs to multiple FERC plant accounts, while a single FERC plant account will typically contain investments originating from hundreds or thousands of different capital projects accumulated over time. With respect to financial forecasting, the Company does not generally attempt to identify the component assets resulting from its capital program. Rather, it focuses on the objectives, scope, and execution of its projects and programs. Consequently, it is perfectly reasonable that the Company can produce capital projections that are aimed at realizing those objectives, are feasible, and can be executed, without focusing on the resulting FERC asset classifications. In the present docket, detail of the Company’s capital expenditure can be found in the Company’s TSP discussion.Page 36 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-099 Page 3 of 3 For revenue requirement calculation purposes, which, from a capital investment standpoint, relies upon plant placed into service, the Company relies on experience and historical trends to establish reasonable estimates of the timing those investments will be placed into service as well as the resulting underlying asset classifications. For example, historical Emergent Failure capital projects may be placed in-service nearly concurrently with the spend itself, and close to a combination of asset classifications, such as lines, poles, small tools, etc. To the extent the Company anticipates a similar volume and severity of future Emergent Failure capital investments, the Company may assume that future capital investment follows a similar pattern with respect to timing and asset classifications.Page 37 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-100 Page 1 of 1 Date Filed: October 06, 2026 Witness: Ann Bulkley Request from: ALLCO Question: (Follow-up to ALLCO-052.) The response states that Ms. Bulkley “did not rely upon the requested information” and “has not compiled” it. Two subparts did not ask what Ms. Bulkley relied upon. Subpart (d) asked the Company to state whether ANY analysis considering the market prices or yields of the Company’s or Eversource Energy’s own outstanding securities exists, and if not, to explain why company-specific market evidence was not considered while proxy-group estimates for other companies were. Subpart (e) asked whether the Company contends the risk difference between its preferred stock and its common equity justifies a premium of approximately 400 basis points. Answer both: (a) state affirmatively whether any such analysis exists anywhere in the Company’s or its witnesses’ files, and if none exists, provide the requested explanation; (b) state the Company’s position on subpart (e), or state that it has none; and (c) confirm that the Company does not dispute the accuracy of publicly available market prices and yields for its traded preferred series, including the $3.24 Series G (CNLPL), as of any date Allco may cite. Response: a. Ms. Bulkley did not perform an analysis of the Company’s or Eversource Energy’s outstanding securities. It is Ms. Bulkley’s practice to not rely on the parent company of the subject operating company in the analysis of the cost of equity, due to the circularity that could result from relying on the parent company’s market data to estimate the required return on a subsidiary. b. The estimation of the cost of equity is based on market data for a proxy group of publicly traded entities, not an individual security, which may not necessarily reflect the investorrequired return on common equity. As noted in the response to subpart (a), Ms. Bulkley eliminates the parent company from the analysis for the reasons indicated. There has been no analysis conducted of the traded value of the preferred stock of the Company in the estimation of the cost of capital. The analysis presented is of the estimated investor-required return on common stock for the proxy group, which more closely approximates the repayment terms of the equity that is included in the Company’s capital structure. c. The Company will review the data reported as publicly available market price data and yields for its traded securities as of the dates indicated by ALLCO and if it can, will confirm the accuracy of that data at the appropriate time.Page 38 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-101 Page 1 of 2 Date Filed: October 05, 2026 Witness: Counsel Request from: ALLCO Question: In correspondence dated August 5, 2025, the Company’s counsel identified, by application number, the interconnection projects whose cost reconciliation remained open: Fisk (INT-29241, INT-29243, LEG-22714), Plainfield (LEG-22710, LEG-22995), Voluntown (INT-29207, INT29208, INT-29209), and Bilton (LEG-22750, LEG-22751, LEG-22752). The same day, Allco requested “the general ledger and the backup support for each project that supports each expenditure.” That request has now been outstanding for more than thirteen months, and no response to date — in correspondence or in this docket — has produced transaction-level substantiation; the Company has provided summary cost tables only. For each project and work order associated with each application number listed above: (a) produce the complete general ledger transaction detail — every journal entry or cost transaction charged to the project or work order — showing transaction date, FERC and internal account, amount, description, source system or module, cost element or resource type, and vendor or employee-group identifier, in native (Excel) format; (b) produce the source records supporting each charge: third-party invoices, purchase orders, contractor payment applications, materials issue records, and internal labor-cost or timesheet summaries (employee names may be redacted; positions by title should be retained); (c) for every overhead, loader, or other indirect amount included in the charges, state the percentage or rate applied, the base to which it was applied, the cost pool from which the rate derives, and the schedule or workpaper in which that pool’s actual costs are recorded; and (d) reconcile the general ledger total for each project to (i) the amounts invoiced to and paid by the applicable interconnecting customer and (ii) the amounts reflected for that project in the Company’s December 2024 final accounting reports. The Authority’s record shows the Company producing invoice-, receipt-, and timesheet-level substantiation of its storm costs in response to OCC and EOE discovery in this docket as a matter of course; the same granularity is requested for charges the Company billed to, and collected from, interconnecting customers. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit.Page 39 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-101 Page 2 of 2 CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s Application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.Page 40 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-102 Page 1 of 1 Date Filed: October 13, 2026 Witness: Warren R. Boutin, Leanne M. Landry, Jeffrey D. Turano and Danielle Munson Request from: ALLCO Question: For the percentage overhead loaders applied to interconnection cost estimates, invoices, and contributions in aid of construction ("CIAC") for distributed-generation and qualifying-facility interconnections at any time from 2017 through the present: (a) identify each person who established, calculated, approved, or revised the loader percentages, and each person or group with authority to approve deviations from them; (b) identify the written policy, procedure, methodology document, or workpaper in which each loader percentage and its derivation is recorded, and produce each; (c) state, for each loader, whether it was developed by CL&P, ESC, Burns & McDonnell Engineering Company, Inc. ("Burns & McDonnell"), or another entity, and identify the entity and organizational unit; and (d) state whether any loader percentage applied to interconnection charges was ever reviewed for consistency with actual incurred costs before December 2024, and if so, identify each review, its date, its author, and its conclusion, and produce it. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the ESC Investment Planning, Corporate Accounting, Plant Accounting and Accounts Payable departments are responsible for creating and maintaining the rates. The Company uses either historical costs or budgeted information to develop its overhead rates. The rates are calculated annually and maintained by the Investment Planning, Corporate Accounting, Plant Accounting and Accounts Payable departments and updated as needed. The overhead charges are calculated by applying the applicable overhead rate to the direct charged cost elements applicable for that overhead (i.e., Labor, Material, Contractors, etc.). Therefore, for a project to be eligible to receive overheads, it must have direct spending.Page 41 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-103 Page 1 of 2 Date Filed: October 08, 2026 Witness: Warren R. Boutin, Leanne M. Landry and Jeffrey D. Turano Request from: ALLCO Question: For each calendar year 2017 through 2025, state the number of distributed-generation interconnection projects for which construction was completed, and, of those, the number for which a final accounting or reconciliation of actual costs against amounts collected was performed and the number for which a final accounting report was issued to the interconnecting customer. Identify the written policy or procedure governing when a final accounting is performed and when a report is issued to the customer, including any standard interval after project completion, and produce it. If no written policy exists, state so and describe the practice and who administers it. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the final accounting process is performed manually and is not tracked or maintained in PowerClerk. The data is entered and tracked across multiple systems. Accordingly, the requested information is inconsistent or not available in Power Clerk and would require a manual review of the underlying records. Section 1.2 of the PURA-approved Interconnection Guidelines states, in part, “At the conclusion of the project, the EDC will reconcile actual vs. estimated cost and reimburse or bill the Generator accordingly. Cost estimates provided to applicants will be subject to a six-month true-up.” Please also refer to the Company’s response to ALLCO-005 i. Prior Referenced Response: i ALLCO-005 Question: Provide an aging schedule of all unpaid interconnection-cost refunds owed to interconnection customers as of the most recent date available, showing for each: the project, the date the refund obligation was determined, the amount, and the reason payment has not been made; and describe the Company’s policy, procedure, and standard timeline for paying such refunds.Page 42 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-103 Page 2 of 2 ALLCO-005 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the standard timeline for paying interconnection-cost refunds is set forth in Section 5.3.2 of the PURA-approved form of Interconnection Agreement.Page 43 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-104 Page 1 of 1 Date Filed: October 05, 2026 Witness: Counsel Request from: ALLCO Question: For each of the four Final Accounting Reports issued to Allco’s affiliates in December 2024 (Fisk, Plainfield, Voluntown, and Bilton): (a) identify each person who prepared, reviewed, approved, or signed off on the report and on its refund computation; (b) identify each person to whom the report or its refund computation was circulated before or after issuance; (c) state what level of authority — by title — is required to authorize payment of a computed interconnection refund, and identify each person holding that authority from December 2024 to the present; and (d) identify each person who, from January 16, 2025 to the present, participated in any decision, discussion, or communication concerning whether or when to pay the refunds computed in those reports, and state the substance and outcome of each such decision. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.Page 44 of 61
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-09 Date Issued September 21, 2026 ALLCO-105 Page 1 of 1 Date Filed: October 05, 2026 Witness: Counsel Request from: ALLCO Question: With respect to the November 20, 2020 written communication from the Company’s interconnection function to Allco stating that the "current actual ‘overhead’ amount is showing around $100,500 versus an original estimate of $253,876" for the LEG-22713 account and projecting a refund of approximately $125,000: (a) identify each person who prepared, reviewed, or received that communication or the analysis underlying it; (b) state where in the Company’s books the projected refund was recorded — the account, the amount accrued, and the date — or state that it was not recorded and why; (c) describe each action taken between November 20, 2020 and December 2024 with respect to the difference between actual and estimated overheads on that account, identifying who took or decided each action; and (d) if no true-up, adjustment, or refund occurred during that period, state each reason why not and identify each person who so decided. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.
As listed on the current system
Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).