  1. Page 102 of 141Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-795 Page 2 of 3 Prior Referenced Response: i OCC-781 Question: Exhibit CLP-ADDITIONS-12 at p. 167 identifies as the first major variance driver for 2024 vs 2025 “Decrease in overall CT capital plan due to regulatory recovery risk.” Explain what the Company means by that phrase, and identify each investment deferred, reduced or cancelled in the 2025 plan for that reason, with the amount, the period of deferral, and the reliability or safety consequence assessed at the time, together with the documents recording each decision. State whether any such investment is now included in the docket no. 26-05-10 or specifically in the proposed TSP Plan in Exhibit CLP-TSP-1. OCC-781 Response: Please refer to OCC-781, Attachment 1, for a detailed description of why the 2025 CT capital plan was reduced relating to regulatory recovery risk. Please refer to OCC-781, Attachment 2, for a list of deferred projects for the 2025 capital plan with deferred amounts greater than $500,000. It is important to note that the budget reduction affected only the 2025 fiscal year, which was a fiscal period bookended by an increase in capital expenditures for reliability in 2023 and 2026. As a result, there is no “reliability or safety consequence” associated with such a short-term deviation in budget expenditures. The reliability impact associated with reduced capital investment is identified in OCC-781, Attachment 1, as in the range of 12-15 percent over the next five years, assuming no improvement in the reduced expenditure level. This projection flows from the fact that the electric distribution system is a dynamic operating platform constructed to have a sufficient level of flexibility to withstand the numerous intrinsic and extrinsic operating conditions that influence the system’s performance in any given year, or even in any given week or day. In that context, capital expenditures within one year are not generally viewed as having a discrete, discernible impact (positive or negative) on reliability performance. System reliability is a continually moving target that fluctuates up or down in the short term as a result of a number of factors, including randomly occurring operating conditions. In the longer term, reliability performance will trend up or down across time, on a system basis, with consistent investment (or a lack of consistent investment). For example, over five years, reliability-focused plant additions would be expected to have a positive, discernible impact, if consistently made over that five-year period, and conversely, capital expenditures that are consistently reduced from year-to-year would be expected to have a discernible negative impact on reliability over a multi-year period. The intrinsic and extrinsic factors that impact reliability and preclude a direct assessment of reliability benefits (or detriments) in the shorter term include the location of future events on the system, the impact of minor weather event days, aging infrastructure failures outpacing the rate of replacement, surrounding tree conditions and many other factors. In addition, at the time that the Company identified the need for reduced capital expenditures, the Company took significant care to identify capital work that could be toggled back without an immediate impact to safety and reliability. For example, proactive, preventive replacement of underground, direct-buried 4kV cable was reduced following several years of increased investment because (1) the Company can maintain safety and reliability in the short run with repairs rather than replacement of this infrastructure; and (2) the Company’s investment approach is changing now based on its experience with the proactive replacement program for 4kV.
  2. Page 103 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-795 Page 3 of 3 The work deferred from the 2025 plan listed in OCC-781, Attachment 2, is planned for completion either as part of the 2026 capital plan, or as part of the Company’s work plan over the next few years.
  3. Page 104 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-796 Page 1 of 1 Date Filed: October 06, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: On the Annual Projects Pre 2022 tab of Exhibit CLP-ADDITIONS-4, the 2017 and 2019 Line Reliability annual programs report actual cost 231.89 percent and 233.24 percent above estimate (lines 53 and 95), and the 2019 Emergent Line annual program reports 51.87 percent above estimate (line 90). For each, state how the estimate was set, explain the variance, and how the overrun was authorized. Response: Line Reliability and Emergent Line annual programs, and all annuals programs in general, are estimated based upon historical trends. As estimates, the Company always retains a level of flexibility in the budget process to address contingencies that inevitably occur during the year. Actual circumstances for Line Reliability annual programs in 2017 and 2019 and Emergent Line annual programs in 2019 exceeded historical trends used for the estimate. Regarding Line Reliability, the Company’s Western region experienced an increase in reliability work in those years. The work in this area arose from the Company’s experience in larger storms that happened in this area in this timeframe. In addition, the Company has experienced increases in the number of customer outage events on the overhead, underground and network system caused by factors other than Major Storm events, which is accounted for within the Emergent Line category. Examples of the factors affecting this cost category include vegetation-initiated overhead events, pole and line damage and associated events due to motor vehicle accidents, unplanned asset failures, residential direct-buried cable failures; underground cable or switchgear events, and network events. Many of these events are the result of weather patterns that occur on the system without rising to the level of a catastrophic event. For example, the Company is experiencing more numerous “minor” weather events during the year caused by frequent wind events during blue sky or grey sky days that cause damage to the system.
  4. Page 105 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-797 Page 1 of 1 Date Filed: October 13, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-12 shows planned transformer purchases rising from $27 million in the 2019 plan (p. 44) to $40 million in the 2025 plan (p. 166). For each year 2017 through 2025, state the number of distribution transformers purchased, installed, and held in inventory at year end, the average unit price paid, and the number installed to replace failed units as distinct from those serving new load. Response: Please refer to the Table below for the transformers received/purchased, issued/installed and the average unit price for poletop, three phase and single phase transformers: The year end inventory balance as of December 31, 2025 is 9,206 transformers (6,979 poletop, 1,029 3 phase, 969 single phase and 229 other) Of the transformers installed each year, approximately 50% are driven by new customer load the other 50% are for emergent work.
  5. Page 106 of 141Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-798 Page 1 of 3 Date Filed: October 06, 2026 Witness: David L. Gladey, Steven Lamontagne, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 shows planned underground residential direct buried cable work declining from $43 million in the 2020 plan (p. 64) to $28 million in the 2025 plan (p. 166). State the total circuit miles of direct buried cable on the system, the miles replaced in each year 2017 through 2025, the cost per mile realized, the miles remaining at December 31, 2025, and the failure rate of the replaced and remaining populations. Response: Over the time period covered by this question, the Company has implemented differing approaches for addressing reliability concerns associated with direct buried cables. Historically, the Company addressed reliability issues on direct buried cables mainly as repair work, when the need arose, with targeted replacement work performed on an as-needed basis. However, the Company was experiencing rising reliability and costs concerns on an emergent basis associated with this infrastructure, causing the Company to come to the conclusion that a more proactive and comprehensive replacement program would mitigate these concerns. Therefore, beginning in 2019, the Company implemented a more proactive, preventive replacement approach for underground, direct-buried cable, which increased replacement costs as compared to historical work, but would have the benefit of obviating future repair costs. Under this approach, the Company instituted a plan to replace and upgrade longer segments of cable around failure points, eliminating the risk of future failure in those areas. Because of the continuing impacts on the system for reliability and the need to address these concerns in the most cost-effective, feasible manner, the Company has continued to innovate on its construction methods for this replacement program. Beginning in 2024, the Company instituted a hybrid approach combining proactive replacements with repair work to extend the life of segments that had not experienced as many failures. In addition, the Company began using new installation methods for placing new cable in conduit (i.e., cable in conduit construction or “CIC”). Collectively, these measures have reduced both the amount of miles replaced and the time for construction, helping to mitigate construction cost increases driven by increases in labor and materials costs.
  6. Page 107 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-798 Page 2 of 3 The costs reported in the table below are the total cost to replace and restore customers, including the work required to replace the cable, as well for temporary generation and temporary work until the cable is replaced. The cost also includes other equipment replaced along with the cable. For this response, the mileage replaced and cost of cable replacement was determined based on work order as-builts under the cable replacement project for primary cable. Miles Replaced Each Year: Year Mileage 2017 17.30 2018 23.81 2019 60.47 2020 46.61 2021 40.78 2022 30.46 2023 37.15 2024 19.52 2025 20.40 Cost Per Mile Realized: Year Cost Per Mile 2017 $ 399,571 2018 $ 653,419 2019 $ 567,974 2020 $ 906,990 2021 $ 803,309 2022 $ 1,229,449 2023 $ 1,050,430 2024 $ 1,190,929 2025 $ 1,250,441 This cost reflects the total cost to replace and restore the customers which includes the work required to replace the cable as well as temporary generation or temporary work until the cable is replaced. This cost also includes other equipment that would be replaced as a result of the cable replacement. Other factors could include a change from injecting cable in 2017/1018 and also using CIC (cable in conduit construction).
  7. Page 108 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-798 Page 3 of 3 Failure Rate: Failure Rate Per Year Mile 2017 0.12 2018 0.14 2019 0.12 2020 0.11 2021 0.09 2022 0.10 2023 0.08 2024 0.07 2025 0.09 Miles Remaining at December 31, 2025 are 5,347 miles. However, please note all conductors within Underground Residential Distribution (URD) areas in Connecticut are classified as “direct buried (DB).” This approach is used because direct-buried status was not historically tracked in the Company’s systems (i.e., Smallworld). During GIS consolidation, this rule was established to standardize the identification of URD assets.
  8. Page 109 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-799 Page 1 of 8 Date Filed: October 09, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-1 at p 13. Please provide the results of the condition assessments described in the Planning Process section for distribution poles, overhead conductor, underground cable, network equipment and substation transformers, showing units inspected, units assessed as deficient, units replaced, and units carried forward. Response: Distribution pole replacements are driven by The Company's inspection and assessment program. Poles are inspected and evaluated based on an inspection cycle and assets identified as deficient through the inspection process are replaced. For overhead conductor, underground cable, and network equipment programs, The Company does not perform condition assessments that produce a discrete population of assets inspected, found deficient and replaced. Instead, these replacement programs are based on defined populations of assets that are evaluated and prioritized using riskbased asset management methodologies. Substation transformers are evaluated based on an asset health score (please refer to OCC-596) i. • Distribution Poles. Connecticut's electric distribution pole system was largely designed and constructed under historical engineering standards that reflected the environmental conditions, loading assumptions, and vegetation characteristics existing at the time of installation. Since then, changes in weather patterns, increased storm intensity, aging vegetation, and evolving reliability and resiliency requirements have materially altered the operating environment in which these assets must perform. As wood utility poles age beyond their expected service life, they enter the wear-out phase of the asset life cycle, during which the probability of failure increases due to factors such as decay, deterioration, physical damage, and loss of structural capacity. Under normal operating conditions and with proper maintenance, roadside wood utility poles are generally expected to remain in service for approximately 40 to 45 years. However, the average age of Connecticut's roadside pole population is currently approximately 47 years. For poles located within Rights-of-Way ("ROW"), the average age is approximately 50 years. Many of these assets exhibit visible signs of
  9. Page 110 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-799 Page 2 of 8 deterioration, including pole and crossarm degradation, as well as damage caused by wildlife activity and environmental exposure. The aging condition of the ROW pole population, when combined with changing weather patterns and increasingly mature tree canopy conditions, heightens the risk of pole failures during wind, snow, ice, and other severe weather events. This risk is further elevated where existing assets were constructed to historical design standards that do not reflect current reliability and resiliency expectations. Wood utility poles are categorized according to a nationally recognized classification system based on strength and height. Under this system, Class 1 poles provide the greatest structural capacity, while higher numerical classes represent progressively smaller and less robust poles. Consistent with current engineering requirements, the Company's present construction standard requires, at a minimum, the installation of Class 2 poles for new facilities. This standard reflects the need to accommodate taller and stronger overhead configurations capable of withstanding modern loading conditions associated with storms, vegetation contact, and system reliability requirements. Approximately 39% of existing distribution poles do not meet The Company’s current minimum pole class standard. These poles possess materially less structural capacity and height than contemporary design requirements contemplate. As a result, a substantial portion of the existing pole fleet was installed under prior engineering standards and may not be capable of supporting current loading conditions associated with modern conductor configurations, vegetation impacts, and severe weather events without increased risk of failure. Recognizing the importance of proactively managing this aging infrastructure, the Company reviewed its pole inspection practices in 2025 and adopted a revised inspection cycle that reduces the interval between inspections from 15 to 10 years. The enhanced inspection program is intended to identify deterioration and structural deficiencies earlier in the asset life cycle, thereby enabling more timely corrective action and reducing the likelihood of in-service failures. Beginning in 2026, the Company expects to inspect approximately 41,000 to 42,500 custodial poles annually under the revised inspection schedule. The number of poles requiring replacement each year is driven by the results of the inspection program and the number of assets identified as failed or deficient. Poles designated as "rejects" are removed from service because their remaining structural capacity has deteriorated below 67 percent of original strength or because they have sustained mechanical damage that precludes their continued safe and reliable operation. Such poles cannot remain in service and must be replaced
  10. Page 111 of 141Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-799 Page 3 of 8 to maintain public safety, system reliability, and compliance with applicable engineering standards. Given the age, condition, and structural characteristics of the existing pole population, replacement of the pole fleet to current design standards represents a long-term asset management initiative requiring systematic, risk-based investment. Through a prioritized replacement strategy focused on the highest-risk assets, the Company seeks to improve system reliability, enhance storm resiliency, reduce failure risk, and ensure that the distribution system is capable of meeting present and future operational requirements. • Overhead Conductor, The Company’s distribution system consists of approximately 16,640 circuit miles of overhead primary construction consisting of bare wire and covered wire. Primary distribution voltages range from 4.16kV to 34.5kV with the majority of circuits operating at 4.8kV, 13.2kV, 13.8kV and 23kV. These statistics indicate that there are approximately 7,577 miles or 47 percent bare wire, and approximately 9,140 miles, or 53 percent covered wire miles that includes aerial and spacer cable. Further, the statistics indicates that bare cooper wire, run through and under some of the most mature, densely forested corridors of any utility in the United States. Approximately 85 percent of the state’s trees are over 61 years old, tall and heavily canopied, with many growing directly into or over utility lines. When storms arrive, these are the trees that fall first and most often directly onto distribution lines. This wire has no protection against tree contact. When a branch or limb touches bare wire, it creates an immediate fault, which means at least a momentary interruption for all customers downstream. The vegetation operating environment and the increase of wind events and storms combined with the high proportion of bare overhead distribution circuits, is at the core of any real or perceived reliability and resiliency performance issues on the Connecticut distribution system. The Company in support of its capital investment decision to improve electric distribution reliability is using both historic performance and forward-looking analytics, and is proposing to reconductor approximately 3,774 miles of its #2, #4, and #6 bare copper conductor because it has exceeded its expected service life, typically 50 years, and has experienced significant mechanical degradation, including embrittlement and reduced tensile strength. These aging conductors exhibit elevated failure rates under normal loading, environmental stress conditions and contribute to an increased number of failure events during inclement weather that are directly associated with bare Cu conductors.