Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).
Files4
Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 14 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
ALLCO Set 9 COMBINED.pdf
PDF · 746 KB · 61 pagesText searchable
Download ALLCO Set 9 COMBINED.pdfRead the text of ALLCO Set 9 COMBINED.pdf
OCC Set 19_COMBINED.pdf
PDF · 1.4 MB · 141 pagesText searchable
Download OCC Set 19_COMBINED.pdfRead the text of OCC Set 19_COMBINED.pdf
OCC Set 20 COMBINED.pdf
PDF · 1.0 MB · 98 pagesText searchable
Download OCC Set 20 COMBINED.pdfRead the text of OCC Set 20 COMBINED.pdf
Page 111 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-799 Page 3 of 8 to maintain public safety, system reliability, and compliance with applicable engineering standards. Given the age, condition, and structural characteristics of the existing pole population, replacement of the pole fleet to current design standards represents a long-term asset management initiative requiring systematic, risk-based investment. Through a prioritized replacement strategy focused on the highest-risk assets, the Company seeks to improve system reliability, enhance storm resiliency, reduce failure risk, and ensure that the distribution system is capable of meeting present and future operational requirements. • Overhead Conductor, The Company’s distribution system consists of approximately 16,640 circuit miles of overhead primary construction consisting of bare wire and covered wire. Primary distribution voltages range from 4.16kV to 34.5kV with the majority of circuits operating at 4.8kV, 13.2kV, 13.8kV and 23kV. These statistics indicate that there are approximately 7,577 miles or 47 percent bare wire, and approximately 9,140 miles, or 53 percent covered wire miles that includes aerial and spacer cable. Further, the statistics indicates that bare cooper wire, run through and under some of the most mature, densely forested corridors of any utility in the United States. Approximately 85 percent of the state’s trees are over 61 years old, tall and heavily canopied, with many growing directly into or over utility lines. When storms arrive, these are the trees that fall first and most often directly onto distribution lines. This wire has no protection against tree contact. When a branch or limb touches bare wire, it creates an immediate fault, which means at least a momentary interruption for all customers downstream. The vegetation operating environment and the increase of wind events and storms combined with the high proportion of bare overhead distribution circuits, is at the core of any real or perceived reliability and resiliency performance issues on the Connecticut distribution system. The Company in support of its capital investment decision to improve electric distribution reliability is using both historic performance and forward-looking analytics, and is proposing to reconductor approximately 3,774 miles of its #2, #4, and #6 bare copper conductor because it has exceeded its expected service life, typically 50 years, and has experienced significant mechanical degradation, including embrittlement and reduced tensile strength. These aging conductors exhibit elevated failure rates under normal loading, environmental stress conditions and contribute to an increased number of failure events during inclement weather that are directly associated with bare Cu conductors.Page 112 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-799 Page 4 of 8 Under the Targeted System Performance, the Company will prioritize lateral zones with the highest asset-related failure risk using data driven and Customer Minutes Interrupted (CMI) over a four-year evaluation period and $/CMI saved. Data-driven prioritization ensures that efforts target zones where replacement yields the greatest reliability improvement and mitigation of repetitive outages. The Company has identified this area at exhibit CLP-TSP-3 page 38. The Company has requested baseline funding of $16M per year to prioritize the areas with bare cooper conductors and replace them with stronger cover conductors- tree wire. • Underground cable and PILC The Company’s Underground distribution system consists of approximately 6,997 circuit miles of underground primary construction, including both direct-buried and underground duct and manhole primary construction. Urban centers such as Hartford, Waterbury, Norwalk and Stamford are served primarily by underground cable and interconnected network systems. Although these systems are largely immune to weather and tree events, each system presents its own challenges. When underground cables fail, locating and repairing the fault takes much longer than an overhead repair, often resulting in outage durations of many hours to days. A second cable failure during abnormal operating conditions could result in the loss of an entire network, affecting a large number of customers. Paper-insulated lead-covered (PILC) cable, a legacy underground cable type, is approaching end of life in many locations. These older cables, which now have higher failure rates, must be proactively replaced to prevent manhole events, manhole fires, and worker safety incidents. PILC cables were widely installed through 1984, primarily on circuit getaways and in networked underground systems. The designed service life of approximately 40–50 years; many remaining cables have exceeded their expected life. Aging PILC cables experience roughly 1 failure per 20 miles once they are over 45-year-old. Rather than waiting for failures to occur which in underground systems can mean extended outages, manhole events, and serious worker safety risks, the Company is taking a proactive approach to replace and prioritize replacement of PILC cable, which now have higher failure rates to prevent manhole events, manhole fires, and worker safety incidents. Approximately 270 miles of PILC cable remain on more than 200 feeders in Connecticut. Under the Targeted System Performance (“TSP”) plan, the Company will prioritize replacement of PILC based on circuit load, number of reliability events, customers at risk and number of customers impacted. The Company is proposing a current baseline of $11 million/year resulting in a 25-year replacement program or 17 years with ~$5.5M of incremental funding per year.Page 113 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-799 Page 5 of 8 • Direct Buried (“DB”) Cable replacement This program targets the replacement of direct buried distribution cables in underground residential and commercial developments that are reaching the end of their useful lives. It has been determined on an industry-wide basis that much of the original Cross-Linked Polyethylene (“XLP”) and High Melting Point (“HMP”)-insulated primary cable installed in the DB system has not achieved its engineered life expectancy. The Eversource distribution system encompasses a substantial component of DB cable which was installed in the 1970s and 1980s. At that time, the installation of the cable did not include any conduit. The current standard places all below-grade cable in conduit and/or duct system to prevent degradation. There are approximately 5,347 circuit miles of UG Primary Direct Buried in Connecticut. To provide a perspective, baseline funding of $28.4M yields a 200-year completion timeline in all towns in CT. • Network Equipment Underground Network Automation projects support the replacement of aging distribution switch gear, provide quicker restoration, telemetry, and improved safety. The replacement of switchgear that has reached end-of-life proactively prior to failure would reduce both customer outages and prevent abnormal system configurations. Switchgear replacement will enable the electrical system to be switched remotely and allow for the operators to see real time load data, which will improve the outage restoration times by not having to dispatch a crew to manually operate the gear. The newly installed switchgear is dead-front constructed (use of elbows vs bolted on connections) and provides the crews safer ways to switch customers, reducing potential injuries while improving restoration times. The replacement program is prioritized based on customers at risk and equipment conditions. Baseline funding of ~$3.5M per 9 years would result in a 41-year replacement program or 18 years with ~$4.6M of 10 incremental funding per year. • For Substation Transformers please refer to OCC-596. The Company performs maintenance of its distribution system on a continuing scheduled basis. Please refer to Table 1, for all the list of activities outlined in the plan.Page 114 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-799 Page 6 of 8 TABLE 1. Prior Referenced Response: i OCC-596 Question: Refer to Exhibit CLP-TSP-1 at 55, “…plan to maintain a transformer fleet that does not exceed 70 years of age.” Identify every law, regulation, manufacturer requirement, or mandatory engineering standard that requires a substation transformer to be retired at 40 years, 70 years, or any other specified age. If no such requirement exists, please confirm. a. Provide all existing studies, analyses, and historical data relied upon by the Company to conclude that transformer failure risk increases rapidly as transformers approach or exceed 70 years of age. If the Company has not performed an empirical analysis using its transformer-failure experience, please justify. b. Provide the Company data and analyses used to establish the transformer age thresholds or replacement criteria in the TSP, including the stated 40-year useful life and increased failure risk near 70 years. Include the age and cause of failure for each Company transformer that failed during the period covered by the analysis. If the criteria are not based on the Company’s actual failure experience, identify the source on which they are based. OCC-596 Response There are no laws, regulations, manufacturer requirements, or mandatory engineering standards that require substation transformers to be retired at a specific age. The age of a power transformer is one of the most important factors in assessing asset condition. Although actual service life varies widely depending on the manufacturer’s design, quality of assembly, materials used, operating history, current operating conditions, and maintenance history, the average expected life for an individual transformer is approximately 40 years according to industry consortiums, andPage 115 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-799 Page 7 of 8 manufacturers. International reliability surveys (i.e., CIGRE) report major failure rates on the order of ~0.3% per transformer-year across large populations, with failure behavior influenced by aging and asset condition. Industry asset-management guidance supports risk-based decision-making that balances failure risk and cost. Eversource employs several methods to both actively and passively monitor the health of distribution power transformers within its service area. Active and continuous monitoring methods include out of specification alarming. Alarms may include indications for bushing monitoring (if applicable), LTC trouble, dissolved gas (if applicable), oil level alarms, and oil temperature alarms, among others. This information along with periodic maintenance and testing reports provide data into Eversource’s condition‑based asset management methodology that draws on multiple sources including: • Transformer nameplate characteristics • Oil quality and DGA trends • Abnormal thermal, electrical, or core indicators derived from PTX health modeling • Maintenance and inspection records • Power Factor Testing Eversource utilizes a detailed asset health score generated through the Electric Power Research Institute (EPRI) PTX tool to assess power transformer asset health. OCC-596, Attachment 4 CONFIDENTIAL, is a technical guide to the EPRI Power Transformer Expert System (PTX). The PTX tool evaluates normal degradation, abnormal operating conditions, oil quality, and age to produce two critical indicators: the Long-Term Health Index (LTI) and the ShortTerm Health Index (STI). The PTX health index is measured in the range of 0 to 1, with 0 meaning healthy and 1 needing immediate replacement. A value greater than 0.5 is considered poor health, such that if repair/replacement is not performed the transformer will continue to decline leading to equipment failure. Eversource has 27 transformers in CT, or about 8.6% of the fleet, that fall within the range considered to be in poor condition. This means that without repair or replacement, their condition is expected to continue declining, increasing the risk of equipment failure. As a result, Eversource continues to prioritize and initiate replacement projects for these transformers. Attachments included note that multiple industry sources discuss aging and failure rates of substation power transformers. • • • • OCC-596, Attachment 1 CONFIDENTIAL, A2 Cigre Brochure 939 AC Transformer Reliability OCC-596, Attachment 2 CONFIDENTIAL, 1013566 Plant Support Engineering Large Transformer End of Expected Life Considerations and the Need for Planning OCC-596, Attachment 3, EXEC-2022-001242 - Large Power Transformer Resilience Report 7-10-24 OCC-596, Attachment 4 CONFIDENTIAL, 3002026877_Power Transformer Expert System (PTX) Software Application Guide_ Introduction to PTX, Overview, Technical Basis and Application Information Based on industry experience, while transformers can operate beyond their typical design life of 40 years, the risk of failure exponentially increases after 70 years of service life, due to paper insulation degradation. OCC-596, Attachment 1 CONFIDENTIAL, a CIGRE study from 2024, shows the failure rate of transformers has a noticeable increase starting at 40 years and exponentially increases as the asset exceeds 65 years old. This study reviewed analysis of thousands of transformers including many voltage classes from around the world to build depth into the data available. OCC-596, Attachment 2 CONFIDENTIAL is an EPRI paper discussing “Large Transformer End-ofExpected Life” which notes “the useful life of a large, oil-filled transformer is between 30 and 40 years with insulationPage 116 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-799 Page 8 of 8 or bus supports being the most likely to fail due to age. For the insulation, thermal aging of the paper insulation is the likely cause of failure.” OCC-596, Attachment 3, is a Department of Energy report from 2024, citing that large power transformers “are typically considered to have a design lifetime on the order of 40 years. In 2014, a DOE report estimated that the average age of LPTs in the North American grid was 38–40 years, indicating that a substantial fraction of those LPTs are at or over that design lifetime. These LPTs will ultimately need to be replaced or refurbished.” These industry research groups and others have provided basis within their published studies to support the concerns of failure with any transformer over 40 years in-service. As a result, Eversource’s Asset Health philosophy for transformers is to operate transformers to their maximum useful life, but plan to maintain a transformer fleet that does not exceed 70 years of age and an average age of approximately 35 years. The objective is to find the balance between affordability and preventing an aged transformer fleet that approaches the “knee of the curve” which results in failure rates that increase significantly. With a large portion of the transformer fleet being between 50 and 80 years old, as these transformers continue to approach and exceed 70 years, the rate of failure will increase rapidly. Due to the complexity and time duration of procuring and replacing transformers, a significant increase in failures would result in the inability to maintain reliability by reactively replacing an increased volume of transformer failures. The six most recent failures of transformers in CT were all attributed to internal failures of the transformer. The ages of the failed transformers were 32, 50, 52, 52, 56, and 83 years old at the time of the failure.Page 117 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-800 Page 1 of 2 Date Filed: October 06, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: Office of Consumer Counsel Question: State the criteria the Company applies in deciding whether an asset is replaced, repaired, or left in service, and provide the written standard with the effective date of each version in force between 2017 and 2025. Response: The Company does not rely on a single replacement standard applicable to all distribution assets. The Company applies a condition-based asset management approach to determine whether a distribution overhead ("OH") or underground ("UG") asset should remain in service, be repaired, or be replaced. These decisions are governed by the applicable Distribution Eversource Maintenance Program (EMP) standards and asset-specific EMP standards in effect during the period 2017 through 2025. The Company's EMP establishes inspection requirements, inspection frequencies, maintenance requirements, and corrective action processes for distribution assets. Under the EMP, distribution assets are required to have routine inspections, testing, and preventive/predictive maintenance activities completed on a time-based maintenance program. There are also condition-based maintenance requirements dictated on an as required basis. Inspection and maintenance findings are documented and evaluated through the Company's maintenance management systems, and follow-up corrective work orders are generated when deficiencies are identified. Following inspection, testing, or maintenance activities, an asset may: Remain in Service when the asset is found to be operating as intended, meets applicable inspection criteria, does not present safety or reliability concerns, and has sufficient remaining useful life to continue providing service. Be Repaired when identified deficiencies can be effectively corrected through maintenance, repair, refurbishment, adjustment, or replacement of individual components. Repair is generally the preferred corrective action when it is technically feasible, cost-effective, and expected to restore the asset to an acceptable operating condition while maintaining an appropriate remaining service life. Examples include corrective maintenance identified through inspections, replacement of failed or degraded components, and routine replacement of consumable items such as batteries used in control boxes, fault indicators, and similar distribution devices.Page 118 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-800 Page 2 of 2 Be Replaced when inspection findings, testing results, maintenance history, or condition assessments indicate that the asset has reached the end of its useful life or cannot be reasonably restored through repair. Conditions that may warrant replacement include substantial corrosion or rust, advanced deterioration, structural degradation, significant physical damage, repeated failures, obsolescence, or circumstances where repair would not provide an adequate remaining service life or would not be economically justified. Consistent with EMP 5.00, inspection findings requiring follow-up action are prioritized based on the severity of the condition and potential safety, reliability, and structural impacts. Deficiencies that present significant structural, safety, or reliability concerns are assigned the highest priority for corrective action. Less severe deficiencies are scheduled for repair based on risk, condition, and maintenance cycle requirements.Page 119 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-801 Page 1 of 2 Date Filed: October 05, 2026 Witness: David L. Gladey, Steven Lamontagne, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: For each year 2017 through 2025, state the number and installed cost of assets replaced under the annual programs in Exhibit CLP-ADDITIONS-4 that had not been assessed as deficient at the time of replacement, and the basis on which those replacements were made. Response: The Company establishes annual projects and programs to proactively maintain, replace, and enhance electric distribution infrastructure based on asset condition, system performance, safety requirements, reliability objectives, and forecasted operational needs. Annual programs provide a structured framework for planning and executing capital investments, enabling the Company to efficiently manage anticipated asset additions and retirements and develop budgets based on historical investment levels, operational experience, and forecasted system needs. The Company does not replace equipment solely based on age or failure risk without first conducting an appropriate assessment. Equipment is evaluated to determine its condition and the appropriate corrective action in accordance with applicable engineering standards, technical guidelines, asset management practices, and industry best practices. Replacement is undertaken only when the assessment indicates that it is the prudent and technically justified course of action to maintain the safety, reliability, and integrity of the electric distribution system. The Company asset replacement strategy is primarily focused on proactively identifying and addressing equipment performance and degradation before impact to the system or service to our customers. While certain assets may remain in service until the end of their useful lives, the Company may elect to replace equipment before failure occurs when inspections, condition assessments, or predictive analytics identify an elevated risk of failure. This proactive approach reduces the likelihood of service interruptions, enhances public safety, and supports the reliable and efficient operation of the distribution system. In addition, planned replacements are more costeffective than emergent-driven reactive replacements, as they minimize outage-related costs, avoid expedited procurement and increased labor expenses, and reduce the potential for collateral damage to adjacent facilities. As a general matter, asset replacement decisions under the Company's annual capital programs are not based exclusively on asset monitoring, deficiencies or condition assessments. While identifiedPage 120 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-801 Page 2 of 2 deficiencies, poor performance, reliability concerns, safety considerations, and risk mitigation are important drivers in determining replacement, assets could be replaced as part of planned system work. For example, replacement of existing equipment may be required in conjunction with distribution system upgrades such as new customer service installations, system reconfigurations, capacity improvements, or other planned capital work written under an annual program. In these circumstances, the scope of work may necessitate replacement of an existing asset to accommodate new facilities or to meet current design and engineering standards, regardless of whether the existing asset had been previously assessed as deficient or not.
As listed on the current system
Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).