Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).
Files4
Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 14 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
ALLCO Set 9 COMBINED.pdf
PDF · 746 KB · 61 pagesText searchable
Download ALLCO Set 9 COMBINED.pdfRead the text of ALLCO Set 9 COMBINED.pdf
OCC Set 19_COMBINED.pdf
PDF · 1.4 MB · 141 pagesText searchable
Download OCC Set 19_COMBINED.pdfRead the text of OCC Set 19_COMBINED.pdf
OCC Set 20 COMBINED.pdf
PDF · 1.0 MB · 98 pagesText searchable
Download OCC Set 20 COMBINED.pdfRead the text of OCC Set 20 COMBINED.pdf
Page 126 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-803 Page 5 of 5 During this period, the Company refined the underlying benefit assumptions, improved data integration processes, normalized historical reliability results relative to overall Company performance, and incorporated engineering review of recommended investments to improve the quality and applicability of model outputs. Accordingly, the Company believes that the most recent 2026 ReBOT output, provided as EOE-364, Attachment 2, is the most representative and informative example of the tool’s current functionality and investment prioritization methodology. Providing earlier developmental outputs could be misleading because they do not reflect the current model logic and capabilities used to support reliability investment planning. [i] EOE-151 Question: (VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-ELP-1, p. 67. Please provide the cost benefit analyses the Company performed for determining reliability projects for the 2025 Test Year. EOE-151 Response: As part of compliance with Docket No. 17-12-03RE08, the Company performed the referenced Benefit-Cost Analysis (“BCA”) in 2023 using historical reliability projects, their associated costs, and their observed impact on SAIDI and SAIFI. In 2024, the BCA results were incorporated into the Reliability Budget Optimization Tool (“ReBOT”). ReBOT uses the BCA results as a baseline to determine the cost-optimal reliability mitigation measure for each zone. It first creates a list of zones eligible for reliability mitigation by evaluating historical outage performance at the individual-zone level. The tool then estimates the potential reduction in customer interruptions and customer minutes of interruption associated with various eligible remediation alternatives. The estimated reliability benefit of each alternative is then evaluated relative to its estimated project cost using $/SAIDI or SAIFI per unit reduction as the metric to determine the most cost-effective mitigation measure. This process identifies and prioritizes potential device deployments and other remediation alternatives that are expected to provide the greatest reliability improvement in a cost-effective manner. The initial ReBOT recommendations were produced in late 2024. Due to the timing of the Company’s project-planning cycle, the recommendations were used to support project selection for the 2025 and 2026 TripSaver Program. ReBOT’s use was subsequently expanded to support both the TripSaver, Smart Switch and reconductoring Programs in 2027. ReBOT is an evolving analytical tool, and the Company continues to refine its methodology and expand its application as additional experience and data become available. The BCA and ReBOT are used as project-screening and prioritization tools and are not intended to predict the precise impact of future projects or programs. Final project selection also considers engineering judgment, constructability, local system conditions, operational requirements, and other project-specific factors. As such, benefits and costs of each project may differ from the tool’s results for a multitude of reasons.Page 127 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-804 Page 1 of 2 Date Filed: October 05, 2026 Witness: Lavelle A. Freeman and Elli Ntakou Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1, p. 76. Table 1 reports Blue-Sky SAIDI of 70.7 minutes in 2021 and 77.5 minutes in 2025. Reconcile that performance with the reliability capital placed in service over the same period, and state the reliability performance the Company expected to achieve from that investment as documented at the time of authorization. Response: Please refer to OCC-804, Attachment 1 - CL&P Distribution Reliability Plant Inservice – 20212025 for the reliability capital placed in service between 2021 and 2025. It is accurate that, between 2021 and 2023, the Company’s plant additions placed in service increased from approximately $161M (in 2021) to $236M (in 2023) and that the Company’s BlueSky SAIDI improved from 70.7 to 68.0 minutes, which is a reduction of approximately 3.8%, although Blue Sky SAIDI then increased in 2024 and 2025. This performance experience demonstrates that reliability-based capital additions are critical to system health, flexibility and overall system performance; however, the impacts of capital additions cannot necessarily be directly and instantaneous translated to SAIDI and SAIFI performance. Changes in plant additions do not necessarily have an immediate effect and, instead, more typically produce results that are experienced over a multi-year period and accrue over the life of the assets. This is why reliability investments are most successful with consistent and adequate investment combined with an analytical planning approach. The factors that impact reliability within a given year include the timing, location intensity of external impacts on the system, the circumstances of minor weather events, aging infrastructure failures outpacing the rate of replacement, changing surrounding tree conditions and other circumstances. Reliability is not a “set it and forget it” system property and this is the reason that consistent investment is required to maintain and improve reliability. For example, Eversource’s ReBOT model shows that maintaining reliability comes at an increasing cost as opportunities that defer a lot of historical outages or predicted risk are gradually mitigated. Consequently, one year's investment does not necessarily produce an immediate corresponding reduction in SAIDI. In addition, many investments are targeted at infrastructure replacement versus driving SAIDI performance such as the replacement of underground PILC cable and direct buried cable.Page 128 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-804 Page 2 of 2 Reliability investments made in reducing aging infrastructure primarily prevent further deterioration of an aging infrastructure versus year over year reliability improvements. Lastly, many of the investments target resiliency as opposed to Blue Sky SAIDI, such as pole integrity, right-of-way rebuilds and enhanced tree removals. These programs are designed to reduce the impact of major storms and high-impact events that represent benefits that may not be fully reflected in Blue-Sky SAIDI.Page 129 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-805 Page 1 of 1 Date Filed: October 05, 2026 Witness: Lavelle A. Freeman, Gerhard Walker, Juan F. Martinez, Steven C. Osuch, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-12, p. 145. Company attributes the 2024 decrease in Peak Load/Capacity to “large Substation capacity projects (6 in 2023 versus 3 in 2024).” Identify each substation capacity project undertaken during 2017 through 2025, with the load forecast and planning criterion relied upon at authorization, the measured peak load in the five years after inservice, the total cost, and any non-wires alternative evaluation. Response: Please refer to OCC-80,5 Attachment 1. This Excel workbook contains a list of substation transformer projects driven by capacity needs that were installed and in service between 2017 through 2025. The Company has also added capacity projects to the list that had significant capital spend within the same timeframe but are not yet in service. All historical load forecasts available for these substations at the time of authorization are provided in the separate worksheets within the attachment. Please note that some projects are not listed with a standardized 10-year forecast because they were developed prior to 2017. However, The Company has provided the 2017 (earliest available) forecast for these projects. Columns I through M of the table identify the recorded peak load value for the following 5 years after in service date, if available. For projects initiated and developed prior to 2017, the Company relied on a different application for forecasting substation loads. The historical load forecasts and values are not maintained in this application as the values become overwritten by, non-weather normalized, actual peak loads once they occur and are recorded.Page 130 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-806 Page 1 of 2 Date Filed: October 05, 2026 Witness: David L. Gladey, Brendan J. O'Brien, Garrett J. Murray, Marisa B. Paruta, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at p. 39 to 71, section IV – Roadmap of the 5-Year TSP plan. State whether any asset placed in service during 2017 through 2025 and included in the recovery request at page 45 of Exhibit CLP-ADDITIONS-1 is scheduled for replacement, upgrade or removal under that plan, with the amount in rate base, the remaining book life, and the reason. Response: The Company does not anticipate or intend to proactively replace recently installed equipment prior to the end of its useful life. When an asset is replaced, the Company designs and installs the replacement equipment in accordance with the design standards and requirements applicable at the time. Any future replacement decision would be evaluated based on the circumstances existing at the time, including applicable design standards, asset condition, reliability considerations, safety requirements, and other relevant factors. While it is possible that a change in standards or other circumstances could result in replacement of an asset before the end of its useful life, the Company expects such instances to be limited. Please refer to OCC-793 i regarding the remaining book life for when assets are replaced. Prior Referenced Response: i OCC-793 Question: Refer to Exhibit CLP-ADDITIONS-1, p. 45. Approximately $4.3 billion of capital additions has been placed in service since January 1, 2017. Identify all such additions retired, abandoned or written off before the end of their depreciable life, with the in-service and retirement dates, the original cost, the amount remaining in rate base, and the reason. OCC-793 Response: Please refer to OCC-793, Attachment 1, for all additions of specific property since January 1, 2017 that were retired before the end of their depreciable life including in-service and retirement dates, original cost, amounts remaining in rate base and the reason for retirement.Page 131 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-806 Page 2 of 2 Retirements of specific property are generally recorded at the full value of the individual asset, whereas mass property retirements are accounted for using the applicable mass property retirement methodology. In some cases, specific property asset retirements are partial, or trended. This occurs when the original asset record includes units of property not separately unitized at the time of installation. When the original cost of the retired asset cannot be specifically identified, the Company utilizes the Handy-Whitman index to trend the replacement cost back to the original installation year to estimate its historical cost. The estimated amount is then retired from the existing asset and charged to the accumulated depreciation account. This process ensures that the cost of the replacement is removed from utility plant while the remaining portion of the original asset continues to be reflected in plant in service. CL&P predominantly utilizes the Broad Group Procedure to depreciate utility property. Under the Broad Group Procedure, homogenous assets are grouped together and depreciated under a single average service life. When an asset within the group is retired, the asset is considered fully accrued, regardless of the asset’s actual service life, and accumulated depreciation is debited for the full book cost of the asset. If an asset is retired prior to the average service life, any impact to depreciation expense will be recovered over time by assets that exceed the average service life of the group. The asset retirement dispersion is analyzed in future depreciation studies when creating an updated, proposed average service life and accompanying accrual rate.Page 132 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-807 Page 1 of 1 Date Filed: October 05, 2026 Witness: Lavelle A. Freeman and Elli Ntakou Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at p. 7. The Company states that the Sustained tier maintains current reliability at minus 0.7 minutes of SAIDI, and that the Targeted System Performance tier improves performance by 6.1 minutes. Provide the calculation that produces the 6.1 minutes, identify the programs credited with the improvement, and state the SAIDI benefit assigned to each. Response: The SAIDI improvement is attributable to the following programs: Programs RELIABILITY IMPROVE SPEC PROJ SMART SWITCHES PROGRAM Capital Improvement Total - Vegetation Improvement + System Degradation Net Impact to SAIDI Sustained Performance Targeted Performance -4.7 -8.9 -9.2 -14 -2.3 15.6 -0.7 -10.4 -19.3 -2.3 15.6 -6.1 System Actual SAIDI improvements will vary based on a number of factors and minor storm events occurring within a given year and the pace at which aging infrastructure impacts system reliability. In the year that the reliability upgrades are implemented, reliability performance will continue to be a function of the type of circumstances experienced by the system in that year (emergent work, pole hits, storm impact, asset failures and other circumstances). Reliability benefits will not necessarily be experienced immediately upon implementation of the reliability upgrade, as the benefit of these investments accrue over the lifetime of the asset. In addition, historical events cannot be assumed to repeat themselves in the same location. For example, capital improvements may be performed in one section of an overhead line where historical events have occurred, however those events may not recur at that location, or may occur again at a location downstream of the new plant addition in the future. For this reason, ReBOT utilizes historical outages that recur more frequently, indicating a concurrence of issues and a higher probability of recurrence, rather than focusing on large, isolated events.Page 133 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-808 Page 1 of 1 Date Filed: October 05, 2026 Witness: Lavelle A. Freeman, Leanne M. Landry, Elli Ntakou and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at p. 7. There are no dedicated resiliency investment in the Sustained tier. Exhibit CLP-ADDITIONS-12, records system resiliency and expanded reliability spending in every year from 2019 through 2025, covering right-of-way lines, pole integrity, smart switches and substation security. Identify the storm resiliency work in the Targeted System Performance tier that was not already performed under those programs. Response: The system resiliency and expanded reliability programs recorded in Exhibit CLP-ADDITIONS12, addressed individual components and functions on the existing system, including right-of-way lines, pole integrity, smart switches, and substation security. These programs were performed using a different approach than the storm resilience work proposed under the Targeted System Performance Plan. The programs in Exhibit CLP-ADDITIONS-12 were aimed at providing foundational resilience and reliability applicable to specific system components based on industry best practices, technology advances and Company standards. The storm resiliency work included in the Targeted System Performance tier is designed from a different perspective that leverages a more proactive, holistic and longer-term approach that is informed by data analytics not historically available to the Company. Specifically, the storm resiliency work in the Targeted System Performance tier consists of full zone-level rebuilds starting in the zones with the highest potential for cost-effective resiliency improvement. These zones are identified using a data-driven methodological approach to identify at-risk zones based on historical performance, as well as predicted performance based on construction type, tree conditions, and customer impact. In these zones, the Company will replace the existing bare-wire construction with spacer cable, an insulated-conductor design that can tolerate incidental tree contact, installed on current design standard poles. Therefore, rather than addressing individual components, this work is focused on replacing the complete bare wire overhead line spans in each targeted zone with a construction type that is more storm-resistant. This type of approach was not historically implemented for the programs identified in Exhibit CLP-ADDITIONS-12.Page 134 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-809 Page 1 of 2 Date Filed: October 05, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at p. 8. The Company shows the Targeted System Performance tier adding $374 million over five years above the Sustained tier, described as Enhanced Reliability, Asset Health and Resiliency Programs. Identify every program funded by that $374 million, with the amount and year for each, and state what each delivers that the Sustained tier does not. Response: The breakdown of the $374M per program and per year is as follows: Year of Program 2027 2028 2029 2030 2031 Total Resilience ($1,000) Asset Health ($1,000) 5,000 25,000 30,000 40,000 55,000 155,000 7,688 17,440 19,897 45,137 53,175 143,337 Enhanced Reliability ($1,000) 10,000 15,280 15,680 16,113 18,685 75,758 Please refer to CLP-TSP-3, page 11, listing the benefits of the incremental spending on these programs from Sustained to Targeted System Performance Plan, namely rows “RE08 Resilience/ Reliability” for columns Resilience and Enhanced Reliability and “Asset Health Risk” for the Asset Health column, above. There are multiple asset-health initiatives included in the $374M differential over the years 20272031. For example, $25M is included in the 2030 and 2031 investments for substation aging infrastructure replacements and transformer asset health programs. These investments would facilitate additional replacements of aging substation batteries, station service transformers, electromechanical relays, and circuit breakers. Transformer asset health is allocated $15M of the incremental investment each year in 2030 and 2031. This would facilitate the replacement of two additional substation transformers. These additional units bring the quantity of planned transformer replacements to the recommended level of eight replacements per year versus the six replacements in the Sustained plan. This plan includes $155M of resiliency funding focused onPage 135 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-809 Page 2 of 2 targeted reconductoring with spacer cable design to improve storm performance and lower storm cost. Smart switch funding is accelerated by $27M to more quickly reduce the number of zones that impact over 500 customers and aging infrastructure is also accelerated in right-of-way ($22M), underground cable PILC replacement ($27M), and overhead bare Cu replacement ($20M) to prevent additional failures of these aging assets impacting both reliability and operational flexibility. Customer focused funding is also included to address CEMI ($21M) and to improve poor town scorecard performance ($27M) which typically impacts smaller groups of customers experiencing poor reliability performance. In all of these categories, the work included in the Targeted System Performance tier is designed from a different perspective that leverages a more proactive, holistic and longer-term approach informed by data analytics not historically available to the Company. In each of the investment categories, programs and projects are identified using a data-driven methodological approach to identify at-risk zones based on historical performance, as well as predicted performance based on construction type, tree conditions, and customer impact. The fundamental theory in this shift to a more data-driven planning function is to drive efficiency and effectiveness so that the dollars invested go further and achieve more for customers due to the ability to harness analytical constructs to inform decisions.
As listed on the current system
Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).